Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum Oroco Resource Corp V.OCO

Alternate Symbol(s):  ORRCF

Oroco Resource Corp. is a Canadian mineral exploration company. The Company is engaged in the acquisition and exploration of mineral properties in Mexico. It holds a net 85.5% interest in those central concessions that comprise 1,173 hectares (ha) (the Core Concessions) of The Santo Tomas Project, located in northwestern Mexico. It also holds an 80% interest in an additional 7,861 ha of mineral... see more

TSXV:OCO - Post Discussion

Oroco Resource Corp > NPV proxy
View:
Post by GeneralGogol on Jan 02, 2021 9:45pm

NPV proxy

Los Azules is a copper porphyry mine project located in San Juan Province, Argentina along the border with Chile.  McEwan Mining has been developing this project for some time.  Let’s look at some of the project data from their NI 43-101 report and see how it compares to San Tomas.  All prices are in USD.
 
Los Azules (October 2017 NI 43-101)
NPV: $2.2 B
CAPEX: $2.4 B
OPEX: $15.4 B (over the life of the mine)
Long-term Cu price assumption: $3 / pound
Indicated resource estimate of 962 M tonnes ore:
0.48% Cu
0.003% Mo
0.06 g/t Au
1.8 g/t Ag
Contained metal resource:
10.2 B pounds Cu
57.3 M pounds Mo
1.7 M ounces Au
55.7 M ounces Ag
 
San Tomas
Historical measured and indicated resource estimate
333 M tonnes ore:
0.437% Cu
3.2 B pounds Cu
822 M tonnes ore:
0.322% Cu
5.84 B pounds Cu
 
We don’t yet know what additional resource credit can be included for Au, Ag, and Mo at San Tomas, but there will likely be some additional lift.  The Exall sampling data reported Au content that is within range of the Los Azules data.  From the historical copper grade data and total tonnage presented here, the two projects are close for now.  Along with everyone else, I anxiously await assay data results later this year and updates to the San Tomas resource estimate.  But for now, the Los Azules NI 43-101 report could be helpful for estimating a rough, back-of-the-envelope NPV.  Keep in mind a few very significant details with Los Azules.
 
The Los Azules project is located at an elevation of 3,500 – 4,500 meters above mean sea level.  “The Los Azules Project is currently accessed by 120 km of unimproved road with eight river crossings and two mountain passes (both above 4,100 m elevation). This access is subject to snow accumulation and is generally passable only from December through to May.  Calingasta is located west of the city of San Juan along Route 12. The last 95 km of dirt road to the project was constructed by Battle Mountain Gold, prior to which, access was by mules...The climate is tundra-like (semiarid/cold) with abundant snowfall during winter and temperatures as low as 30°C.  Apparently frequent northwesterly winds can approach 120 kms/hr (about 75 mph).”  (October 2017 and March 2008 NI 43-101 reports) 
 
I visited Mendoza, Argentina ten years ago and took a bus trip up to the top of the Andes on scenic route 7.  The border with Chile is at the top of the mountain range.  The terrain is stunning and resembles the mountains of Tibet.  If you ever travel to Mendoza, you should include this on your itinerary.  Building and operating a copper mine at this elevation and climate will present a whole host of engineering, transportation, and physical challenges.  Glacier and snow-melt runoff from the Andes is collected and routed to the wine region of Mendoza.  This is probably the case in San Juan as well, some 160 km to the north. I don’t know specifically what water-resource limitations the project may encounter.  Not everyone’s physiology works well at 4,500 meters elevation. Transporting billions of pounds of copper concentrate along mountain roads safely (presumably by truck rather than by mule) will add costs.  The project anticipates building a road to the west and shipping concentrate to the Port of Coquimbo, Chile, some 244 km away on the other side of the Andes.
 
Construction of a mine in a high-elevation location with extreme weather poses real challenges.  The limited construction season in western Alaska prompted Teck-Cominco in the late 80s to build and deliver its plant for the Red Dog mine in large modules.  A total of 18 modules of up to 1,800 tons each were built in the Philippines and then shipped to Alaska.  From the Port at the sea of Chukchi, it was another 52-miles of slow driving on a dirt road to deliver the completed sections at the mine site during the 3-month summer construction season.  I have traveled on that road.  It is at low elevation and very safe to navigate.  Delivering large sections of material and machinery to high-elevations in the Andes will be much different.
 
You can download the 43-101 reports from the links below and adjust the accounting metrics to approximate a NPV for a project located not far from Choix, Mexico.
 
Comment by auricgold on Jan 03, 2021 12:48am
Gogol, great post Thanks for the info. Definitely it says that at least OCO should be at 1.5 billion and if we take 50% of that as value, we should be worth at least 800 million now. That is close to 4$C a share.
Comment by PaulMoo on Jan 04, 2021 4:29pm
Oroco owns < 81% of ST though. And it seems MCEWEN owns 100% of LA, as well as 6 other locations, but their market cap is only $500 mln. Does anyone know, why so low?
Comment by GeneralGogol on Jan 04, 2021 6:15pm
I don’t know what the financial viability of the Los Azules project is in the short-term. It has some engineering challenges to overcome before starting production (impassable roads due to snow accumulation six months out of the year, for example). Perhaps this is reflected in McEwan’s stock price.  Another comparable (although admittedly with a higher current measured resource than both ...more  
Comment by zins on Jan 04, 2021 10:19pm
Great posts, Love the analysis! 
Comment by pepelepieuxx on Jan 05, 2021 10:02am
At the end of the day, the only thing OCO has to do to double in stock price is execute - complete 3D IP, receive permits, drill, analyze content, turn historical and new drill data into 43-101 compliant standard.  The price doubles from here if they just turn the historical data into 43-101.  However, we have already seen enough hints with the 3D IP that the resource will be expanded ...more  
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities