Post by
dragonfly454 on Jan 18, 2022 10:39am
Dirk
the Santonian Unconformity is classified as "Major Erosional Event" ...after this well it would be classified as "Extreme Erosional Event"..
Imagine a working hydrocarbon system determined above Santonian in H19 Campanian ...Lau-Lau,Haimara,Pluma,Maka Central all around ..the water depth at Lau Lau plus the sediment depth pressurizes that zone in the Stabroek Block yes but the angle getting to H23 and the sediments in the proximal fan setting caused some issues nothing to worry about....the vertical depth to H23 is almost the horizontal distance from Kawa to any of those proven wells ..Lau-Lau,Maka,Haimara and Pluma..thats very close ..no social distancing here..
Seems no NR until the final NR ..redundant testing LWD and Wireline
Comment by
JS4900 on Jan 18, 2022 1:21pm
I wouldn't be surprised if they're doing extensive coring on this well, ...and that could be contributing to extending the timelines. jmo
Comment by
OIL_RUN on Jan 18, 2022 1:30pm
Full barrel coring has indeed crossed my mind a few times to rationalize extended timing. Also, explains the multiple trips in / out of hole.
Comment by
Ebenizer3 on Jan 18, 2022 1:48pm
do u think that was cgx/fec's original plan or a request from possible jv partners?
Comment by
Ebenizer3 on Jan 18, 2022 1:21pm
my original thought was h19 was better than they expected with them testing instead of just going with lwd. now wondering if it's fishing or sidetrack, would they need to pr? Hoping its exxon, Chevron shell total wanting a piece. Thx
Comment by
CLOUDER on Jan 18, 2022 2:12pm
DIRK there is that HIGH ANGEL talk again, that was in a dream i had. HEY oil run or dirk or d fly,if they are coring does that mean they have found oil? the other dream was ENSEMBLE,the only word i rememberd. A GROUP OF, it means.
Comment by
Dirksidetrack on Jan 18, 2022 2:19pm
Clouder, It means that they have found reservoir rock and want to evaluate its quality and contents.
Comment by
Ebenizer3 on Jan 18, 2022 12:22pm
what's ur take/guess on the length of this drill? example exxon lisa 1 taking about 5 weeks. Thx