https://providencegold.com/presentations/

Stockpile is identified on page 12 of the November presentation above

The stockpile is now "west waste dump footprint" and "east waste dump footprint"

West is left, east is right, north is straight up

The space between is now "mill footprint"

Important to note, and take this into consideration when evaluating the drill results

Drill holes SPD-32, SPD-2, SPD-3, SPD-22, SPD-25, SPD-23, SPD-24 are all located between the east and west stockpiles in the "mill footprint"

Drill holes SPD-7, 8 and 9 are located above and outside the East waste dump footprint

The Pink (at least on my print out) Circular dots are the drill holes, size based on depth of hole

Hope this helps

Cheers