TSXV:PLAN - Post Discussion
Post by
BCONTVentures on Apr 12, 2024 8:12pm
PLAN and PYR
And from LinkedIn: https://www.linkedin.com/posts/pyrogenesis-canada_pyrogenesis-announces-that-lab-strength-tests-activity-7184650032401252352--H4f?utm_source=share&utm_medium=member_desktop Dr. Rabie Benioub, Ph.D., Sc.D, Director of the Silicon R&D Department at #PyroGenesis : " #Fly ash, known for enhancing concrete by improving its durability, workability, and strength, has traditionally been tied to the coal combustion process—a method fraught with significant CO2 emissions and high energy consumption. PyroGenesis, in collaboration with Progressive Planet Solutions, has developed #PozPyro —a new zero-CO2, energy-efficient direct plasma process that transforms crystalline quartz, the second most abundant material on Earth, into #AmorphousSilica, a supplementary cementitious material (SCM) as a substitute to fly ash. Early analyses, including a 7-day strength test, have shown PozPyro to achieve impressive strength results with reduced water demands, potentially heralding a new era of decarbonization and energy efficiency within the cement industry." Read More here https://lnkd.in/eacsYKJj #sustainablemanufacturing BCONTVentures wrote:And another, a great presentation given by PLAN.
BCONTVentures wrote:And an older video from Progressive Planet Solutions Inc.'s CEO, Stephen Harpur, when he presented at the Rivemont MicroCap Cocktail Event in May 2023. Great presentation done by Stephen:
https://www.youtube.com/watch?v=OrFmoWUEP9E The 22:00 mark he talks about what PLAN and PyroGenesis are doing (very interesting).
At the end of the presentation there are a couple of Q&As where he goes into more detail regarding what PLAN and PYR are doing. Very interesting. BCONTVentures wrote:It's great having the CEO of Progressive Planet (PLAN) praise the hard work and dedication of PyroGenesis' staff and work. At the 18:30 mark, Steve Harpur, CEO of PLAN, praises PYR:
https://www.youtube.com/watch?v=gaT3fEB80NQ Start at the 13:40 mark for the work that PLAN and PYR are doing.
From Magbeach2 (Agoracom): "
We should know more in about 28 days after compressive test results...yes, this stuff takes time...listen to the CEO complement Pyro and the two year investement in the possible solution..enjoy" And from ceo:
@I_M_Volatile It also validates the time it takes to work on these complicated projects. It was mentioned the original time frame was estimated to take a year, but working through some enormous problem it took two.
Be the first to comment on this post