TSXV:PNPN - Post Discussion
Post by
Betteryear2 on Apr 27, 2023 4:40pm
Hole 23 Delivers! V.PNPN
Highlights Main Zone
- 0.97% Ni, 0.45% Cu, 0.07% Co, 0.80 g/t Palladium, 0.27 g/t Platinum over 16.4m in Hole PN-23-023
Including - 1.08% Ni, 0.50% Cu, 0.08% Co, 0.91 g/t Palladium, 0.31 g/t Platinum over 13.5m
- 1.37% Ni, 0.44% Cu, 0.10% Co, 1.11 g/t Palladium, 0.57 g/t Platinum over 5.6m
- 0.57% Ni, 0.17% Cu, 0.04% Co, 0.47 g/t Palladium, 0.18g/t Platinum over 14.8m in Hole PN-23-024
Including - 0.92% Ni, 0.32% Cu, 0.06% Co, 0.59 g/t Palladium, 0.34g/t Platinum over 4.85m
And - 1.03% Ni, 0.17% Cu, 0.07% Co, 1.13 g/t Palladium, 0.1g/t Platinum over 2.3m in Hole PN-23-024
- Drilling has completed for the winter season, and will resume in the summer. Holes PN-23-025 to PN-23-035 are awaiting assay results, and several have encountered significant intervals of massive sulfides.
TORONTO, ON / ACCESSWIRE / April 27, 2023 / Power Nickel Inc. (the "Company" or "Power Nickel") (TSXV:PNPN)(OTCQB:PNPNF)(Frankfurt:IVVI) continues to confirm the presence of high-grade Ni-Cu-Co-PGE mineralization in the Main Zone of its Nisk project near James Bay, Quebec. In addition, step out exploration drilling 800m east of the Main Zone shows indications of a new Ni-Cu-Co-PGE zone within the same ultramafic sequence of rocks. The Main Zone drill results for holes PN-23-23 and PN-23-24 extend mineralization up dip from previous high-grade holes into an area previously believed to be a low grade zone between two high grade lodes (Figure 1).
Hole 23 Delivers! Power Nickel Final Drill Results from the Fall 2022 Drill Program and Initial Drill Results from Winter 2023 (accesswire.com)
Be the first to comment on this post