Post by
Sandpoint on Aug 06, 2021 3:03pm
Schedule
Here is my take on the upcoming schedule. The seismic operation will run to Nov 1. The next move will be to drill for oil. So they will take some time to analyze the seismic and drill data to pick a spot that they hope will produce oil. So give them a month to do that. Drilling would then start around Dec 1. The first two wells took about 5 months drilling time, so lets say, the 3rd one takes 2.5 months. So that means that we are looking at mid Feb 2022 for a positive result of oil. I would hope that they would publish strong data before the third well begins drilling. If we are lucky they will post some of the other drill data before November. But the bottom line is that we are aout 6 months from having the first flow of oil.
Comment by
lamulah on Aug 06, 2021 6:54pm
You are way off on timeline. I'll make it simple. There will be a JV deal by end of year.
Comment by
Buyhigheatchips on Aug 09, 2021 9:31am
Thanks Sandpoint. Any other takes on this? Turntotheright?
Comment by
yrmac on Aug 09, 2021 1:46pm
I regret to dind't sell at $14.00 I will be happy to sell at $12.50, but I don't know when it will be possible. When I read chas this is not encourageant