"
The second hole, CDH002 was collared in mid September and completed in November. It was planned to be drilled to 1500 metres but was abandoned at 946 metres in a deep-seated fault zone. Strong disseminated chalcopyrite-bornite mineralization was logged in the hole, including copper veins between 600 and 750 meters downhole. Assays are expected in January 2023.
A third drill hole, CDH003 was collared in early December, and suspended year end at 301 meters. It is proposed to drill CDH003 to 1300 meters on resumption of drilling in 2023.
https://www.rugbyresourcesltd.com/cobrasco