I can't help but notice that the grade on hole 4 is getting better w depth
Todays release only has results to a vertical depth of 182m That hole was drilled to a vertical depth of 599.45 which means we're still waiting on 400+ meters of asset on a hole that grade is increasing w depth
Sonic Hole 1 | vertically in the central area of the former mine | vertical | 55.49 |
B20C-004 | continued down from sonic hole 1 | vertical | 543.96 meters, for a total hole depth of 599.45 meters |
Sonic Hole 2 | vertically 100 meters due north of sonic hole 1 and diamond hole 4 | vertical |