Post by
Goldy63 on Nov 05, 2021 3:26pm
My Math Says 17 Holes Left.
NR says 31 holes drilled . 12 Reported in July. 2 holes in Table one from last news . Leaves 17 holes of beauty bonanza Grade Gold to come . And hey Rocket all good but wowsa I prefer 17 to 9 bro . Grin . Read on . The first phase of the RC drilling program is now complete, with 31 holes (6907m) drilled including 19 holes in the West Pit area and 12 holes at East Pit area (Figures 1 and 2). Assay results received for 12 of the holes were reported in the Companys July 20 and September 7, 2021 news releases, reporting near surface, high-grade mineralization over broad intersections in the West Pit area. Assay results for 2 additional holes are presented in Table 1. Results for the remaining holes will be provided following the receipt of confirmation assays from ALS Minerals Laboratory.