TSXV:TBLL - Post Discussion
Post by
Oldschool2022 on Nov 12, 2022 10:32pm
Does Greenstone’s 11.5 million ounces extend to our property
The Tombill Main Group is adjacent to the 11.5 million ounces of gold at the Hardrock deposit owned by a joint venture between Centerra and Premier. That JV is spending $1.25 billion to construct an open pit mine with a 14.5 year mine life to produce 4.2 million ounces of gold or about 290,000 ounces a year. The most western hole of the Hardrock deposit is right on the border with the Tombill Main Group and showed a value of 18.49 g/t gold over 20.5 meters. What both companies call the F-Zone runs from Hardrock right through the Tombill Main Group.
Tombill intends to drill the Tombill Main Groupdown the entire 2.5 km length of the strike. Naturally they began at the eastern border of the Bankfield-Tombill fault where it joins the Hardrock deposit. The early results from the drill program demonstrate that the mineralized F-Zone structure does continue onto the Main Group ground and it gently dips at an 11-12% angle. While the drill holes on the eastern side of the property are near surface, deeper drilling will be required to the west.
Tombill Mines holds 100% interest of the patents/claims adjacent to the Greenstone Mine.
Be the first to comment on this post