VANCOUVER, BC, June 25, 2024 /CNW/ - Vizsla Copper Corp. (TSXV: VCU) (OTCQB: VCUFF) (FRANKFURT: 97E0) ("Vizsla Copper" or the "Company") is pleased to announce the start of the summer core drilling program at the Woodjam copper-gold project (the "Woodjam Project" or "Woodjam") in south-central BC (Figure 1).
HIGHLIGHTS
- The Targets: Core drilling will evaluate the potential for: (1) extensions of high-grade gold mineralization at the Deerhorn deposit, (2) extensions of gold-rich copper mineralization at the Three Firs zone, and (3) extensions of higher gold mineralization at the Southeast deposit.
- The Program: Approximately 3,600m of core drilling in 9 drill holes is planned, some of which will be on the contiguous Redgold property.
"With our financing freshly closed, I'm excited about the start of drilling at Woodjam," commented Craig Parry, Executive Chairman. "Strong copper prices are expected to continue over the long term and Vizsla Copper is executing on its strategy of acquiring undervalued copper assets and completing selective, high-impact exploration programs on our best targets."
"Well mineralized and highly prospective for exploration success, Woodjam remains our highest priority project," commented Steve Blower, Vice President of Exploration. "I'm looking forward to evaluating all of the target areas, especially Three Firs, as this is our first opportunity to expand the wide-open mineralization there."
The Program
High priority targets will be evaluated in 3 areas – the Deerhorn deposit, the Three Firs zone and the Southeast deposit (Figure 2). At the Deerhorn copper-gold deposit, at least two drill holes will evaluate the potential to expand the higher-grade southern gold-rich portion of the deposit (Figure 3). At the copper-gold Three Firs zone, one drill hole will evaluate potential extensions to the southwest of the zone and another will evaluate a large circular magnetic anomaly northwest of the zone (Figure 4). Finally, drilling at the large Southeast copper deposit will attempt to expand the area of higher-grade gold mineralization along the south end of the deposit (Figure 5).
Approximately 3,600m of drilling is planned in 9 drill holes – some of which will be completed on the contiguous Redgold property. More information on the Redgold portion of the drilling program will follow as targets are finalized. The program will take approximately 6 to 8 weeks to complete. Samples will be submitted for assay regularly through the program, and analytical results will be disclosed in due course.
Figure 1 – Woodjam Property Map
Figure 2 – Target Area Locations
Figure 3 – Deerhorn Deposit Target Area (Grade Shells at 810masl)
Figure 4 – Three Firs Zone Target Area (Grade Shells at 800masl)
Figure 5 – Southeast Deposit Target Area (Grade Shells at 790masl)