V.GRAT
|
We would like to thank our Chief on-site geologist, Corne Coetser, for his...
|
V.GRAT
|
We would like to thank our Chief on-site geologist, Corne Coetser, for his...
|
V.GRAT
|
Incredible! The material hopper and chipper were designed by the company’s...
|
V.GRAT
|
Absolutely! This is another great example of the Company’s capability to plan...
|
V.GRAT
|
Cant wait for this! The new mixing tanks and vertical flotation columns&...
|
V.GRAT
|
Wow! thats a good job! Company workers recently disassembled and removed the...
|
V.GRAT
|
Great workers! Workers will now start pulling up the six tier overflow...
|
V.GRAT
|
Good Job! Concrete pouring of the foundation started this morning and has...
|
V.GRAT
|
The excavation has been completely lined with a black plastic liner to...
|
V.GRAT
|
Incredible! Workers have completed the excavation work on the processing...
|
V.GRAT
|
The mounting frames and rotary dryer will be installed and mounted once the...
|
V.GRAT
|
Wow! The custom built rotary dryer consists of 6 steel frames, a dryer inlet...
|
V.GRAT
|
Great Job! Fanie Barnard, and Gratomic’s Aukam team have begun work on the...
|
V.GRAT
|
Thats incredible! Once the concrete has been properly cured, the equipment...
|
V.GRAT
|
Wow! That's a great idea! The structural base plates and hold-down bolts...
|
V.GRAT
|
Great! The Processing Plant has been designed on a modular basis with...
|
V.GRAT
|
This work will accommodate the multiple tanks and final pieces of equipment...
|
V.GRAT
|
Wow! Company employees excavated approximately 414 tonnes of material.
|
V.GRAT
|
Excavation work for the multiple foundations on site was completed in late...
|
V.GRAT
|
Incredible!Pro Edge has delivered the first order of steel structures to the...
|