VANCOUVER, March 18, 2013 /CNW/ - Kombat Copper Inc. (the "Company") (TSX.V: KBT) is pleased to report that it has received all the results from its
diamond drill core program at Gross Otavi. A reference map is attached
to this news release.
The best result to date is from GC15A-12 which returned 6.03 metres of 1.55% copper, 6.64% lead, 4.09 %
zinc and 18.4g/t silver, including 4.12 metres of 2.06% copper, 9.52%
lead, 5.37% zinc and 23.5g/t silver. The table below lists the balance of significant assays.
"The results of this drilling program are extremely encouraging with the
very high grade intercepts of not only copper, but also lead, zinc and
silver. With a mine plan and license secured at Gross Otavi, we feel
there is excellent un-realised value in this deposit. We plan further
drilling to define a NI43-101 compliant resource," stated Alex Helmel,
President of the Company.
Gross Otavi is located approximately 12 km to the west of Kombat and was
historically mined by Otavi Minen und Eisenbahn-Gesellschaft ("OMEG")
from 1909 until 1941. TCL and Gold Fields Namibia evaluated the area by
diamond drilling and a decline was begun in 1988 with the intention of
commencing production as a satellite deposit to feed the Kombat mill.
All work was halted in early 1989 when work was re-focused on the
Kombat Mine. Weatherly International performed more work including
recirculation drilling with good results as disclosed in a news release
dated 23 October 2007; however, continued to focus their priorities on
the main Kombat deposit along with the Asis Far West project.
All historic drilling at Gross Otavi was performed prior to the
existence of NI43-101 standards and no drill core remains to be
re-sampled and analysed. Therefore, to confirm the presence of
mineralisation at the site some drilling was required. For a
preliminary program, two diamond drill holes were planned as twin holes
of historic holes; GC5 and GC15.
The first hole, GC5A-12 (twinning GC5) was collared at -50o towards 019o (true), but was abandoned at 50.20 metres due to an unforeseen
obstruction (steel in an old drill hole). Therefore GC5B-12 was
collared 4.0m to the west and again drilled at -50o towards 019o (true). GC15B-12 (twinning GC15) was collared approximately 62m to the
east and 25m south of GC5B-12 and drilled at the same azimuth and dip.
All core was oriented and down hole surveys were carried out
systematically with a Reflex EZ-Trac multi-shot tool. Final drill
hole-collar coordinates were acquired by use of a differential GPS.
Significant diamond drill intercepts are listed in the following table.
Drill Hole¹
|
From (m)
|
To (m)
|
Width² (m)
|
Cu (%)
|
Pb (%)
|
Zn (%)
|
Ag (g/t)
|
V (%)
|
|
GC5A-12
|
Hole abandoned at 50.20m. No significant intersections.
|
|
GC5B-12
|
56.00
|
58.20
|
1.20
|
0.86
|
4.68
|
0.38
|
*
|
0.64
|
|
GC5B-12
|
79.00
|
112.85
|
33.85
|
*
|
1.52
|
*
|
*
|
*
|
(includes)
|
80.01
|
83.00
|
2.99
|
*
|
2.38
|
*
|
*
|
*
|
(includes)
|
89.00
|
101.00
|
12.00
|
*
|
2.51
|
*
|
*
|
*
|
(includes)
|
89.00
|
90.02
|
1.02
|
4.33
|
1.26
|
0.48
|
32.0
|
*
|
|
GC5B-12
|
158.36
|
161.35
|
2.99
|
*
|
3.98
|
*
|
*
|
*
|
|
GC15A-12
|
51.44
|
57.47
|
6.03
|
1.55
|
6.64
|
4.09
|
18.4
|
*
|
(includes)
|
53.35
|
57.47
|
4.12
|
2.06
|
9.52
|
5.37
|
23.5
|
*
|
(includes)
|
53.35
|
55.35
|
2.00
|
1.67
|
11.48
|
10.79
|
13.0
|
*
|
|
GC15A-12
|
57.47
|
57.93
|
0.46
|
karst cavity³
|
|
57.93
|
58.93
|
1.00
|
1.46
|
0.65
|
1.30
|
6.0
|
*
|
|
58.93
|
64.93
|
6.00
|
karst cavity³
|
|
64.93
|
67.84
|
2.91
|
2.65
|
4.91
|
*
|
9.5
|
*
|
|
67.84
|
73.93
|
6.09
|
karst cavity³
|
|
GC15A-12
|
84.56
|
86.63
|
2.07
|
0.77
|
2.36
|
*
|
*
|
*
|
(includes)
|
85.63
|
86.63
|
1.00
|
1.11
|
3.68
|
*
|
*
|
*
|
|
GC15A-12
|
94.01
|
97.12
|
3.02
|
*
|
5.63
|
*
|
*
|
*
|
|
GC15A-12
|
132.00
|
134.62
|
2.62
|
2.60
|
4.06
|
0.13
|
73.8
|
0.20
|
(includes)
|
133.00
|
133.62
|
0.62
|
9.36
|
11.20
|
1.14
|
312.0
|
0.56
|
* Values not significant
|
¹
|
GC5A-12 was collared at 772498E, 7823528N (UTM WGS 84) and drilled with
an azimuth of 019o and dip of -50o.
|
|
GC5B-12 was collared at 772495E, 7823528N (UTM WGS 84) and drilled with
an azimuth of 019o and dip of -50o.
|
|
GC15A-12 was collared at 772557E, 7823503N (UTM WGS 84) and drilled with
an azimuth of 019o and dip of -50o.
|
²
|
Widths reported are drill core lengths and may not represent true
widths.
|
³
|
Natural cavity. These are not included in the compositing, but included
to illustrate the complexity of the geology.
|
No comparisons between historic and recent assays are displayed for the
following reasons;
-
No sampling was performed in the historic drill holes from 0 to 36.58m
in GC5 and 0 to 54.86m in GC15, therefore no results are available for
these intervals.
-
All historic holes were drilled in feet and converted later to metres in
the sample/assay tables making it difficult to match the historic and
recent sample intervals.
-
Although intervals do not correspond (likely due to the high grade
nugget effect of the mineralisation which is best noted in the core),
there are numerous high grade intersections in both historic and recent
drill holes.
Sampling and Analytical Method
All drill core was systematically logged with lithology, mineralisation,
alteration and structure recorded and logged by hand on A3 size logging
sheets. Any lost core for each sample interval was recorded in an
adjacent column to the sample interval column. At completion of the
hole all qualitative and quantitative data were entered digitally in
the Kombat database.
All drill core from the Gross Otavi drilling was sawn in half by means
of a core saw in a secure location at the Kombat mine site. For each
sample, one half was sent to the laboratory and the other half kept as
a reference in the core box. As per standard practices, Company
geologists inserted a standard and blank in every batch of twenty
samples. Four hundred seventy-two (472) samples were sent for analysis.
The samples were submitted to Bureau Veritas ("BV") laboratory in
Swakopmund, Namibia, an ISO 17025 certified laboratory in late Q4, 2012
and analysed for 25 elements by Inductively Coupled Plasma Optical
Emission Spectrometry (ICP-OES).
The laboratory protocol involves a crushing stage whereby the entire
sample is reduced to a 2mm fraction. The crushed material is then run
through a splitter device to obtain a representative fraction of
approximately 500 grams. This fraction is then pulverized in a ring
pulverizer until 85% of the material will pass through a 75 micron
sieve. Following this, a 0.15 gram sample is digested using a
combination of nitric, hydrochloric, perchloric and hydrofluoric acids
for an almost total digestion. The digested sample is then analysed for
Cu, Pb, Zn and Ag along with 21 other elements by ICP-OES. The
laboratory inserts internal standards and blanks along with random
duplicates with a blank at the beginning of a run and thereafter every
90 samples to ensure 1 to 2 internal standards and 1 to 2 duplicates
every 30 samples.
Qualified Person
Mr. Colin Russell, P.Geo., the Qualified Person as defined by National
Instrument 43-101, is responsible for the design of the program, and
all exploration work on the Kombat Project will be done under his
supervision. Mr. Russell has read and approved the technical content of
this news release.
About Kombat Copper Inc.
Kombat Copper (TSX-V : KBT) is a publicly traded Canadian exploration
and development company with its core operations focused on copper
resources in Namibia, one of the world's most prospective copper
regions, where it has substantial assets in place with significant
exploration upside.
The Company holds an 80% interest in five mining licenses in the Otavi
Mountainlands, an area of Namibia particularly known for its high-grade
copper deposits. Within these licenses are three past-producing mines
including the Company's flagship property: the past-producing Kombat
Mine. The Kombat Mine's extensive infrastructure includes an 800m
exploration shaft which was opened in 2006, three recently-operational
shafts, ramp systems, extensive underground workings, mine buildings, a
tailings facility, a mill and concentrator (replacement value est
+$100MM) all supported by the Company's local town-site. The Kombat
mine originally opened in 1962 and historically produced ~8.7 million
tonnes of ore grading 3.1% Cu and is linked to vital existing
infrastructure, including power, water, roads, and rail with close
proximity to the port of Walvis Bay and to one of only five
commercial-grade smelters in Africa located in Tsumeb.
In addition to mining licenses, the Company holds an 80% interest in
five Exclusive Prospecting Licenses ("EPL's") covering an area of more
than 2200 km2. The EPL's are located also within the copper-rich Otavi
Mountainlands and are in close proximity to Tsumeb.
Neither TSX Venture Exchange nor its Regulation Services Provider (as
that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.
All statements in this news release, other than statements of historical
fact, that address events or developments that Kombat Copper Inc.
expects to occur, are "forward-looking statements". Forward-looking
statements are necessarily based on estimates and assumptions that are
inherently subject to known and unknown risks, uncertainties and other
factors that may cause Kombat Copper Inc.'s actual results, performance
or achievements to be materially different from those expressed or
implied by such forward-looking statements. Such factors include,
without limitation: significant capital requirements and the ability to
raise equity capital; the risks of obtaining and maintaining the
validity and enforceability of the necessary licenses and permits and
complying with the permitting requirements in, Namibia; the lack of
certainty with respect to foreign legal systems, which may not be
immune from the influence of political pressure, corruption or other
factors that are inconsistent with the rule of law. Forward-looking
statements are not guarantees of future performance, and actual results
and future events could materially differ from those anticipated in
such statements. Kombat Copper Inc. expressly disclaims any intention
or obligation to update or revise any forward-looking statements,
whether as a result of new information, events or otherwise, except in
accordance with applicable securities laws.
Image with caption: "Kombat and Gross Otavi mining licenses (CNW Group/Kombat Copper Inc.)". Image available at: http://photos.newswire.ca/images/download/20130318_C5729_PHOTO_EN_24618.jpg
SOURCE: Kombat Copper Inc.