Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Patriot Gold Announces Results Of Preliminary Economic Assessment For Moss Mine Project

C.PGOL
Patriot Gold Announces Results Of Preliminary Economic Assessment For Moss Mine Project

Results Support Strong Potential Economics Including PHASE II Pre-Tax Internal Rate of Return of 117.9%

LAS VEGAS, April 10, 2013 /PRNewswire/ -- Patriot Gold Corp. (OTC: PGOL) or ("Patriot Gold" or the "Company"), a developing gold and silver production and exploration company, today announced the results of a Preliminary Economic Assessment ("PEA") for the Moss Mine Project, located in the historic and active Oatman mining district near Bullhead City, Arizona.

Based on the recently announced updated resource estimate and an independent technical report co-authored by CDM Smith, Inc. ("CDM") and Metal Mining Consultants Inc. ("MMC") dated March 13, 2013 (the "Technical Report"), the PEA provides an evaluation of the economics of open pit mining and heap leach processing in Phase I and Phase II production for the Moss Mine Project.

Phase II Preliminary Economic Assessment Highlights*:

  • Mine life of five years, 5,000 tpd, 42,000 AuEq oz/yr
  • Pre-tax IRR of 117.9%
  • Pre-tax payback of 15 months
  • Pre-tax NPV @5% $110 million
  • Capital expenditures $26.6 million
  • Capital/average annual AuEq oz production $633/oz
  • Cash Costs/AuEq oz $490/oz
  • Metallurgical recoveries of 75-85% for gold and 55-77% for silver

*All figures are in USD unless otherwise stated, are based on a gold price of $1,500/oz and predictions that 100% of the Phase I and II mineral resource will be minable.

"We are pleased with the outcome of the Preliminary Economic Assessment which not only supports the strong economic potential of the Moss Mine Project, but also provides sound guidance to the next phases of operations," said Bob Coale, CEO of Patriot Gold. "We believe that there continues to be upside in maximizing results from the in-field operations during the Pilot Plant operations phase (Phase I), from possible pit expansions as a result of the mine exploration programs and of course, possible Mine Life Extension or Expansion (Phase III). With the PEA results guiding our way, we remain very optimistic on the Moss Mine Project outlook and look forward to keeping our shareholders informed on our progress throughout the next critical phases of operations."

The Three-Phase Mine Development Plan, as outlined in previous news releases, is designed to move the Moss Mine Project forward in a defined and thoughtful manner - from conceptual design and laboratory test work to on-site pilot plant testing (Pilot Plant - Phase I) and then onto operations (Phase II). Phase II is independent from Pilot Plant - Phase I, and will only proceed if Phase I is successful. Phase III is conceptual only, will depend on the success of Phase II, and so is not included in the PEA. Phase III would involve mine life extension and/or expansion of production volumes.

A summary of the key parameters and results of the PEA follow.

Operations Scope

Pilot Plant - Phase I

  • Designed to in-field demonstrate the economic and technical viability of heap leach processing
  • Includes pilot-scale open pit mining and heap leach processing of an aggregate of approximately 90,000 tonnes of mineralized rock
  • All activities would be confined to patented property
  • Low strip ratio 0.79:1
  • Mined zone approximately 500 feet in length
  • Both higher grade and lower grade material will be tested in Pilot Plant - Phase I
  • Production rate of 1,000 tonnes of mineralized rock / day
  • Mining and processing activities to be performed by contractors
  • Provision of 67,463 tonne stockpile of mineralized rock for Phase II production

Operations - Phase II

  • Will proceed upon determination of successful results from Pilot Plant - Phase I
  • Would include mining and processing of approximately 6.13 million tonnes of mineralized rock
  • Open pit mining methods and heap leach processing
  • Low strip ratio 1.6:1
  • All activities would be confined to patented property
  • Pit depth ranges from 30 feet to 575 feet
  • Production and processing activities are expected to be 5,000 tonnes of mineralized rock / day
  • Mining activities to be performed by contractors and processing activities to be performed by Northern Vertex

The complete PEA report will be available within approximately 30 days at www.patriotgoldcorp.com.

Resources

New Technical Report on Resources:

An updated independent technical resource estimate was prepared by Dr. Stewart D. Redwood, FIMM, and Scott Wilson of MMC and was outlined in a news release dated March 26, 2013. The summarized resource estimate in the table below includes 12.6 million tonnes (AuEq of 1.03 g/t) of measured resources and 9.98 million tonnes (AuEq of 0.73 g/t) of indicated resources (aggregate average: 22,589,000 tonnes at 0.90 AuEq g/t) for total measured and indicated AuEq oz of 653,600 (537,000 Au oz and 5,830,000 Ag oz). It is important to note that mineral resources described herein are not mineral reserves and, as such, may not have demonstrated economic viability.

Metal Mining Consultants Inc. ("MMC") Summarized Resource Estimate*

For Moss Mine Project at a 0.3 g/t Au Cut-off

Resource

Category

Au Eq*(oz)

Au (oz)

Ag (oz)

Tonnes

Grade

AuEq

Au

Ag

(g/t)

(g/t)

(g/t)

Measured

418,760

345,000

3,688,000

12,611,000

1.03

0.85

9.10

Indicated

234,840

192,000

2,142,000

9,978,000

0.73

0.60

6.68

M+I

653,600

537,000

5,830,000

22,589,000

0.90

0.74

8.03









Inferred

82,020

66,000

801,000

3,957,000

0.64

0.57

6.65


*Gold equivalency is based on a silver:gold ratio of 50:1 and assumes 100% recovery of all metals.

*Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources estimated will be converted into Mineral Reserves estimates.

*Mineral resource tonnage and contained metal have been rounded to reflect the accuracy of the estimate and numbers may not add due to rounding.

*Resources were based on 36,805 meters of drilling in 658 exploration drill holes and 530 meters of channel sampling. There were a total of 7,677- five meter composite samples used in the estimation of gold and silver. MMC used Inverse Power Distance (ID3) as the preferred estimation technique for the Moss Mine Project.

*MMC capped gold assays, prior to compositing 5 meter samples, at 17 grams per tonne and silver at 140 grams per tonne in order to limit the effect of high grade outlier grades in the estimation of mineral resources.

*MMC applied Industry Standards in the selection of the drill hole and assay information gathered from historic and current exploration programs in its determination of Measured Mineral Resources, Indicated Resources and Inferred Resources.

Resource Estimates Used for Economic Assessments in the PEA:
Resources used in the economic assessment for the Moss Mine Gold-Silver Project Phase I Pilot Plant and Phase II Operations are as follows:

Moss Mine Project Measured and Indicated Resources Estimate* for Phase I Pilot Plant Operations

Class for Phase I

Tonnes

Au Oz Equiv

Grade

Au g/t

Au Oz

Grade

Ag g/t

Ag Oz

Pilot Plant Operations - Phase I Measured .3 - 1.0 g/t

49,301

1,245

0.664

1,052

6.08

9,636

Pilot Plant Operations - Phase I Indicated .3 - 1.0 g/t

0

-

0.000

0

-

0

Pilot Plant Operations - Phase I Measured and Indicated .3 - 1.0 g/t

49,301

1,245

0.664

1,052

6.08

9,636

Pilot Plant Operations - Phase I Measured >1.0 g/t

108,013

9,091

2.226

7,732

19.57

67,969

Pilot Plant Operations - Phase I Indicated >1.0 g/t

149

6

1.046

5

5.21

25

Pilot Plant Operations - Phase I Measured and Indicated > 1.0 g/t

108,162

9,097

2.225

7,737

19.55

67,995

*Equivalency based on 1 oz Au = 50 oz Ag



Moss Mine Project Measured and Indicated Resources Estimate* for Phase II Operations

Class for Phase II

Tonnes

Au Oz Equiv

Grade

Au g/t

Au Oz

Grade

Ag g/t

Ag Oz

Operations - Phase II Measured .3 g/t cutoff

5,063,232

218,467

1.114

181,349

11.40

1,855,914

Operations - Phase II Indicated .3 g/t cutoff

1,074,207

36,675

0.863

29,821

9.92

342,670

Operations - Phase II Measured and Indicated .3 g/t cutoff

6,137,439

255,142

1.070

211,170

11.14

2,198,584

*Equivalency based on 1 oz Au = 50 oz Ag



Moss Mine Project Inferred Resource and Waste Material Estimates* for Phase I Pilot Plant and Phase II Operations

Class for Phase I

Tonnes

Au Oz Equiv

Grade

Au g/t

Au Oz

Grade

Ag g/t

Ag Oz

Pilot Plant Operations - Phase I Inferred Resource .3 - 1.0 g/t

0

0

0

0

0

0

Pilot Plant Operations - Phase I Inferred Resource >1.0 g/t

0

0

0

0

0

0

Class for Phase II

Tonnes

Au Oz Equiv

Grade

Au g/t

Au Oz

Grade

Ag g/t

Ag Oz

Operations - Phase II Inferred Resource .3 g/t cutoff

13,134

491

0.933

394

11.53

4,868

Waste - Phase I and Phase II

Pilot Plant Operations - Phase I Waste

3,712






Operations - Phase II Waste

9,843,357






*Equivalency based on 1 oz Au = 50 oz Ag

Resource Estimates for Phase III - Mine Life Expansion / Extension:

The anticipated operating period for Phase I is 15 months and for Phase II is five years, including development and construction. As previously stated, Phase II will only proceed upon the successful completion of Phase I.

Pilot Plant - Phase I and operations - Phase II measured and indicated resources encompass 265,000 of the total 654,000 ounces gold equivalent of global resources estimated by MMC. Upon the completion of Phase II, 389,000 oz AuEq will remain. Extending mining and processing operations onto unpatented land by mining along strike and to depth has the potential to significantly extend the life of the mine. This will be the subject of further investigation concurrent with Phase II operations. This investigation will incorporate permitting, technical, economic, and financial elements into one or more pre-feasibility and/or feasibility studies.

It should be noted that the Phase I and Phase II resources described are physically constrained to that which can be reasonably extracted by limiting mining and related facilities to patented - or private - land. The conceptual Phase III mine plan would be pursued without the physical constraints of limiting operations to patented land and will require normal course approvals from various US governmental departments and mining authorities.

Based on development of the initial resource solids containing the Phase I and Phase II resources, the mining extraction recovery rate of the in-situ resource is anticipated to be 100 percent.

Metallurgy:

Overall metallurgical data shows that ore from the Moss Mine Gold-Silver Project is readily amenable to agglomeration/heap leach cyanidation processing. Column test recoveries obtained from the bulk samples, finely crushed using rolls crushers and agglomerated using cement as a binder, ranged from 75% to 84.6% for gold and from 61.3% to 76.6% for silver. Recovery percentages are summarized in the table below:

McClelland Leach Test Recovery Results

Test

Feed Size

Au Recovery (%)

Ag Recovery (%)

1X Rolls HG Composite

P85-1/4"

75

69

1X Rolls HG Column Test

P85-1/4"

75.3

61.3

2X Rolls HG Composite

P95-1/4"

84

76

2X Rolls HG Column Test

P95-1/4"

84.6

76.6

Gold extraction was still in progress when column leach tests were terminated for purposes of completing the PEA and is expected to increase further with a longer leach cycle. Preliminary data from an ongoing column leach test indicate that the low grade mineralization will be amenable to agglomeration/heap leach cyanidation processing after roll crushing to a 95%-1/4" feed size. Use of industrial scale high pressure grinding rolls (HPGR) has the potential to improve liberation and yield higher recoveries.

The favorable results from the labatory metallurgical testing provide the basis for proceeding with the proposed field testing Pilot Plant - Phase I. Metallurgical data from the Pilot Plant program will be collected and analyzed for use in the design of operations - Phase II. Both higher grade and lower grade mineralized rock is expected to be tested in the Pilot Plant. Although positive results have been obtained to date, additional metallurgical test work will be required. Consequently, recoveries used in the PEA have been conservatively scaled back to 75% for Au and to 55% for Ag.

Exploration:

The Preliminary Economic Assessment recommends a continued exploration program to further delineate the mineralization at the Moss Gold-Silver Project. The limits of mineralization are still open at depth and to the west. The recommended drilling program includes additional drilling of 2,200 meters and associated costs are outlined in the table below:

Estimated Costs for Continued Exploration and Drilling Program

Drilling

$286,000

Labor

$65,000

Assaying

$150,000

Core Studies

$10,000

Administration

$51,000

Total

$562,000



Production and Economic Criteria:


The key Production and Economic Criteria outlined in the PEA are as follows:


Project Element


Phase II (1)

Resource (6)

M&I Resource (tonnes)


6,137,439

M&I Resource (gram Au/tonne)


1.07

M&I Resource (gram Ag/tonne)


11.14

M&I Silver : Gold ratio


10.4:1

M&I Resource (AuEq oz)(2)


255,100

Strip Ratio (waste/resource)(1) (5)


1.6:1

Production

Mine Life (years) (7)


5

Tonnes / day (nominal)


5,000

Total tonnes processed


6,218,036

Gold Recovery (%)


75%

Silver Recovery (%)


55%

Total oz. Recovered (Au)


145,465

Total oz. Recovered (Ag)


1,107,516

Total oz. Recovered (AuEq)(2)


167,616

Costs

Average Annual Production oz AuEq


42,000

 Mining


$5.69

 Processing


$3.67

 Power


$2.92

 G+A


$0.97

Cost / tonne


$13.25

Financial (6)

Estimated Capital (US $)


$26,618,000

Capital / Total Recovered AuEq oz (US $/oz)(2)


$158

Capital / Avg Annual Production AuEq oz


$633

Cash Cost / Recovered AuEq oz (US $/oz)(2)(4)


$490

Net Present Value (NPV), 5%(3)


$109,762,415

Discounted Cash Flow Rate of Return (DCF/ROR)(3)


117.9%

Payback Period (years)(3)


1.25

(1) Will only proceed if Phase I is successful

(2) Equivalency based on 1 oz Au = 50 oz Ag

(3) NPV, DCF/ROR, and payback are calculated based on $1500/oz. Au on a pre-tax and pre-royalty basis

(4) Operations and Maintenance (O&M) costs (includes G+A)

(5) Excludes stockpiled mineralized rock

(6) The reader is cautioned that mineral resources described herein are not mineral reserves, and, as such, do not have demonstrated economic viability

(7) Mine life for operations - Phase II is based on mineable resources on patented land only and has not been established using economic cut-off criteria.






Sensitivity Analysis:

The following table shows the variances to the Net Present Value (NPV) and Internal Rate of Return (IRR) from the base case of $1500 gold and $30/oz silver.

Prices

IRR

NPV @5%

Gold $1300/oz

Silver $26/oz

88%

$82 million

Gold $1500/oz

Silver $30/oz

117.9%

$110 million

Gold $1700/oz

Silver $34/oz

150%

$137 million

Various other sensitivities have been carried out assessing the effects of:

  • An increase in capital cost by $10 million
  • An increase in operating costs by 20%
  • An increase in gold and silver recovery rates to match higher recovery rates in lab results
  • An increase in costs of diesel fuel for power production by $1 per gallon
  • A decrease in capital equipment costs by 25% by way of using used equipment instead of new
  • An increase in pit slope from 55 degrees to 65 degrees
  • A decrease in delay of NSR receipts from 25% to 10%

The results are attached as Appendix 1 and indicate the robust nature of the Moss Mine Project.

The Moss Mine Project & Patriot Gold's Optionee/Operator

The Moss Mine Project is located approximately seven miles due east of Bullhead City, Arizona. Patriot Gold is the 100% owner in the historic Moss Gold-Silver property located in Mohave County, Arizona, which is subject to certain royalties and an earn-in option agreement for 70% interest. The earn-in optionee/operator has the right to earn a 70% interest in the project by completing an $8.5 million investment over five years and a bankable feasibility study. Subsequent to the optionee/operator earn-in, financing of the project will be on a proportional basis.

About Patriot Gold

Patriot Gold Corp. is a developing precious metals exploration and production company with the mission to discover and develop significant gold and silver assets. Headquartered in Las Vegas, Nevada, Patriot Gold currently holds a portfolio of two projects in Nevada (Bruner and Vernal) and its flagship Moss Mine Project in Arizona, each at varying stages of development from grassroots to advanced exploration and resource development. For more information, go to our website at www.patriotgoldcorp.com.

Disclaimer: This announcement may contain forward-looking statements which involve risks and uncertainties that include, among others, limited operating history, limited access to operating capital, factors detailed in the accuracy of geological and geophysical results including drilling and assay reports; the ability to close the acquisition of mineral exploration properties, and other factors which may cause the actual results, performance or achievements of the company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. More information is included in the company's filings with the Securities and Exchange Commission, and may be accessed through the SEC's web site at http://www.sec.gov.

Investors:
Patriot Gold
702-456-9565


Appendix 1


Sensitivity Economics for operations - Phase II (Pre-Tax):


Cost Component

Variation

DCF/ROR

NPV, 5% $(000,000)

Base Case: Gold = $1500/oz;
Base Case: Silver = $30/oz)


117.9%

$110

Table 3: Increase in gold and silver prices

Gold = $1700/oz
Silver = $34/oz

150.0%

$137

Table 4: Decrease in gold and silver prices

Gold = $1300/oz
Silver = $26/oz

88.0%

$82

Table 5: Increase in capital cost

Increase = $10,000,000

82.2%

$101

Table 6: Increase in Cash (O&M) cost

Increase = 20%

97.3%

$96

Table 7: Increase in gold and silver recovery

Gold recovery = 84.6%;
Silver Recovery = 76.6%

157.5% 157.5%

$143

Table 8: Increase in diesel price

Diesel increase by $1/gallon to $4.75/gallon
Electrical cost increase to $3.622/tonne

112.2%

$106

Table 9: Used equipment option: generators, heavy equipment, crushing plant, and conveyor systems rather than new equipment (base case)

Decrease = 25%
Decrease capital cost = $3,300,000

137.2%

$112

Table 10: Increase in pit slope from average 55 degrees to average 65 degrees

Decrease in strip ratio to 1.25:1
Decrease in waste rock cost by $3.3 million
Increase in recovered gold equivalent by about 4,600 oz. due to wider pit or $7 million
Increase in slope rock bolting by $7.6 million

121.1%

$113

Table 11: Decrease in delay of NSR receipts

Decrease to 10% from 25% the amount of revenue delayed until following year

142.4%

$111

(1) Table number corresponds to tables contained in the complete PEA document

 

 

 

 

SOURCE Patriot Gold Corp.

Tags: