VANCOUVER, May 6, 2013 /CNW Telbec/ - Panoro Minerals Ltd. (TSXV: PML) (Lima: PML) (Frankfurt: PZM) ("Panoro", the "Company")
Panoro is pleased to report additional assay results from its 100%
owned Cotabambas porphyry copper-gold-silver project located in
southern Peru. The drill results include infill, step out, and
exploration drill holes in Ccalla, Ccalla East and Azulccaca deposits.
Some highlights are as follows:
-
Drillhole CB-111 intersected 88.5m of oxide copper mineralization
grading 0.93% Cu, 0.10g/t Au and 2.2g/t Ag including 51.5m averaging
1.24%Cu, 0.04g/t Au and 0.9 g/t Ag.
-
Drillhole CB-112 intersected 86.7m of oxide copper mineralization
grading 0.43%Cu, 0.31g/t Au, 3.3g/t Ag, including 26.7m averaging 0.73%
Cu, 0.35g/t Au, 4.8g/t Ag, underlain by 103.6m of primary copper
mineralization grading 0.79% Cu, 0.58g/t Au and 5.2g/t Ag, including
67.9m averaging 1.06% Cu, 0.84 g/t Au and 6.8 g/t Ag.
-
Drillhole CB-115 intersected 119.6m of primary copper mineralization
grading 0.61% Cu, 0.25 g/t Au and 4.3 g/t Ag, including 64.3m averaging
0.82% Cu, 0.32 g/t Au and 5.0 g/t Ag.
The following table details the more significant intersections:
Drillhole
|
From (m)
|
To (m)
|
Metres
|
Cu (%)
|
Au (g/t)
|
Ag (g/t)
|
Mo (%)
|
Zone
|
CB-105
|
32.5
|
36.5
|
4.0
|
0.17
|
0.77
|
1.0
|
0.0010
|
Leach
|
""
|
51.3
|
56.7
|
5.4
|
0.12
|
0.04
|
1.7
|
0.0006
|
Mixed
|
""
|
667.2
|
957.6
|
290.4
|
0.31
|
0.12
|
2.7
|
0.0033
|
Primary
|
Including
|
731.2
|
803.9
|
72.7
|
0.47
|
0.19
|
2.8
|
0.0040
|
Primary
|
Including
|
741.7
|
782.3
|
40.6
|
0.52
|
0.19
|
2.9
|
0.0032
|
Primary
|
Including
|
894.2
|
944.2
|
50.0
|
0.41
|
0.14
|
5.2
|
0.0044
|
Primary
|
Including
|
948.2
|
957.6
|
9.4
|
0.84
|
0.43
|
6.1
|
0.0023
|
Primary
|
""
|
989.9
|
998.9
|
9.0
|
0.49
|
0.24
|
6.1
|
0.0034
|
Primary
|
""
|
1012.9
|
1029.0
|
16.1
|
1.00
|
0.68
|
10.7
|
0.0013
|
Primary
|
""
|
1077.5
|
1090.5
|
13.0
|
0.26
|
0.10
|
3.2
|
0.0010
|
Primary
|
CB-109
|
0.0
|
146.0
|
146.0
|
0.46
|
0.40
|
2.0
|
0.0013
|
Oxide
|
Including
|
26.7
|
40.7
|
14.0
|
0.70
|
0.35
|
1.7
|
0.0020
|
Oxide
|
Including
|
68.7
|
132.7
|
64.0
|
0.53
|
0.48
|
2.1
|
0.0011
|
Oxide
|
""
|
153.1
|
214.6
|
61.5
|
0.22
|
0.10
|
1.4
|
0.0022
|
Primary
|
CB-110
|
0.0
|
2.2
|
2.2
|
0.35
|
0.41
|
2.1
|
0.0008
|
Oxide
|
""
|
2.2
|
53.6
|
51.5
|
0.45
|
0.44
|
3.5
|
0.0019
|
Enrichment
|
Including
|
2.2
|
12.2
|
10.0
|
0.91
|
0.32
|
4.4
|
0.0026
|
Enrichment
|
""
|
132.1
|
261.8
|
129.7
|
0.48
|
0.37
|
4.0
|
0.0010
|
Primary
|
Including
|
132.1
|
222.0
|
89.9
|
0.57
|
0.48
|
4.3
|
0.0010
|
Primary
|
CB-111
|
0.0
|
88.5
|
88.5
|
0.93
|
0.10
|
2.2
|
0.0006
|
Oxide
|
Including
|
22.2
|
73.7
|
51.4
|
1.24
|
0.04
|
0.9
|
0.0006
|
Oxide
|
""
|
88.5
|
122.0
|
33.5
|
0.26
|
0.06
|
1.8
|
0.0019
|
Primary
|
""
|
148.8
|
184.5
|
35.7
|
0.23
|
0.05
|
2.0
|
0.0029
|
Primary
|
""
|
205.5
|
262.3
|
56.8
|
0.19
|
0.06
|
1.3
|
0.0024
|
Primary
|
""
|
281.5
|
313.8
|
32.3
|
0.28
|
0.10
|
1.9
|
0.0031
|
Primary
|
CB-112
|
0.0
|
86.7
|
86.7
|
0.43
|
0.31
|
3.3
|
0.0010
|
Oxide
|
Including
|
52.0
|
78.7
|
26.7
|
0.73
|
0.35
|
4.8
|
0.0010
|
Oxide
|
""
|
86.7
|
190.3
|
103.6
|
0.79
|
0.58
|
5.2
|
0.0018
|
Primary
|
Including
|
122.4
|
190.3
|
67.9
|
1.06
|
0.84
|
6.8
|
0.0018
|
Primary
|
""
|
237.7
|
248.7
|
11.0
|
0.82
|
0.71
|
4.2
|
0.0010
|
Primary
|
CB-113
|
no significant values
|
CB-114
|
56.0
|
92.2
|
36.2
|
0.56
|
0.04
|
1.0
|
0.0001
|
Oxide
|
Including
|
69.1
|
84.2
|
15.1
|
0.80
|
0.06
|
0.7
|
0.0001
|
Oxide
|
""
|
178.5
|
253.3
|
74.8
|
0.20
|
0.08
|
1.0
|
0.0016
|
Primary
|
""
|
284.2
|
299.8
|
15.6
|
0.14
|
0.03
|
1.0
|
0.0046
|
Primary
|
CB-115
|
0.0
|
4.2
|
4.2
|
0.10
|
0.56
|
18.9
|
0.0015
|
Leach
|
""
|
4.2
|
118.7
|
114.5
|
0.36
|
0.18
|
2.0
|
0.0023
|
Oxide
|
Including
|
60.5
|
70.5
|
10.0
|
0.93
|
0.31
|
2.4
|
0.0030
|
Oxide
|
CB-115
|
118.7
|
164.7
|
46.1
|
0.32
|
0.16
|
2.3
|
0.0042
|
Primary
|
""
|
192.3
|
212.3
|
20.0
|
0.13
|
0.03
|
1.9
|
0.0053
|
Primary
|
""
|
222.1
|
274.1
|
52.1
|
0.31
|
0.24
|
3.5
|
0.0018
|
Primary
|
""
|
284.9
|
404.5
|
119.6
|
0.61
|
0.25
|
4.3
|
0.0012
|
Primary
|
Including
|
324.9
|
389.2
|
64.3
|
0.82
|
0.32
|
5.0
|
0.0011
|
Primary
|
CB-116
|
222.5
|
411.7
|
189.2
|
0.15
|
0.08
|
1.4
|
0.0012
|
Primary
|
Including
|
242.0
|
369.7
|
127.7
|
0.16
|
0.10
|
1.5
|
0.0011
|
Primary
|
""
|
445.7
|
465.7
|
20.0
|
0.17
|
0.08
|
2.0
|
0.0014
|
Primary
|
CB-117
|
55.8
|
124.2
|
68.4
|
0.13
|
0.45
|
2.5
|
0.0017
|
Leach
|
Including
|
57.1
|
75.1
|
18.0
|
0.21
|
1.06
|
3.8
|
0.0017
|
Leach
|
""
|
124.2
|
239.5
|
115.3
|
0.48
|
0.07
|
2.3
|
0.0026
|
Oxide
|
Including
|
124.2
|
136.2
|
12.0
|
0.96
|
0.12
|
3.0
|
0.0032
|
Oxide
|
Including
|
214.0
|
228.0
|
14.0
|
1.65
|
0.03
|
1.0
|
0.0040
|
Oxide
|
CB-118
|
222.0
|
608.7
|
386.7
|
0.27
|
0.09
|
2.6
|
0.0047
|
Primary
|
Including
|
288.3
|
355.6
|
67.3
|
0.35
|
0.07
|
2.6
|
0.0096
|
Primary
|
Including
|
548.0
|
576.0
|
28.0
|
0.43
|
0.17
|
6.1
|
0.0031
|
Primary
|
CB-119
|
353.7
|
405.7
|
52.0
|
0.17
|
0.04
|
1.2
|
0.0052
|
Primary
|
""
|
504.8
|
559.3
|
54.5
|
0.21
|
0.06
|
2.0
|
0.0055
|
Primary
|
""
|
565.6
|
579.9
|
14.3
|
0.29
|
0.15
|
1.5
|
0.0028
|
Primary
|
""
|
590.7
|
595.5
|
4.8
|
0.34
|
0.11
|
4.1
|
0.0095
|
Primary
|
""
|
603.7
|
639.2
|
35.5
|
0.26
|
0.10
|
2.4
|
0.0089
|
Primary
|
""
|
655.8
|
670.1
|
14.3
|
0.17
|
0.05
|
2.2
|
0.0372
|
Primary
|
""
|
683.7
|
705.0
|
21.3
|
0.18
|
0.07
|
1.5
|
0.0209
|
Primary
|
""
|
718.6
|
738.6
|
20.0
|
0.11
|
0.02
|
2.0
|
0.0140
|
Primary
|
""
|
720.6
|
842.6
|
122.0
|
0.01
|
0.04
|
3.3
|
0.0098
|
Primary
|
Including
|
768.3
|
842.6
|
74.3
|
0.22
|
0.058
|
4.3
|
0.0083
|
Primary
|
Exploration Drill Holes
Hole CB-105 was collared 1,200m to the east of previously published hole CB-68 and
drilled from the southeast to northwest to test for the depth extension
of the Ccalla East deposit. From 667.2m to 957.6m, 290.4m of copper
primary mineralization averaging 0.31% Cu, 0.12g/t Au and 2.7g/t Ag was
intersected, including a number of intervals grading between 0.47% Cu
to 0.84% Cu. From 989.9m to 1090.5m the hole intersected intervals of
the principal porphyry grading from 0.26% Cu to 1.0%C u and 0.10g/t Au
to 0.68g/t Au between barren latite dikes. The hole bottomed in
mineralization at a vertical depth of 600m.
Hole CB-113 was collared in the Ccalla East deposit, also from the southeast to the
northwest but 500m to the south of CB-105. No significant values were
intercepted suggesting a potential southern limit to the Ccalla East
deposit.
Hole CB-117 was collared at the northern end of the Ccalla deposit and targeted
the deeper portions of potential northern extension of the supergene
enrichment zone beyond the current resource model limits. From 55.8m to
124.2m, 68.4m of a mineralized leached cap was intercepted grading
0.45g/t Au and 2.5g/t Ag, including 18m grading 1.06 Au g/t and 3.8g/t
Ag. This is underlain by 115.3m of oxide copper mineralization grading
0.48% Cu, 0.07g/t Au and 2.3 g/t Ag, including 12.0m averaging 0.96% Cu
and 14.0m grading 1.65% Cu. The supergene mineralization is still open
to the north and nearer to surface and is targeted for further
extension with additional drilling in the future.
Hole CB-118 was collared between holes CB-68 and CB-105in the Ccalla East deposit,
but directed to the southeast. From 222m to 608m, 386.7m of primary
copper mineralization was intersected grading 0.27% Cu, 0.09g/t Au and
2.6g/t Ag, including 67.3m averaging 0.35%Cu, 0.07g/t Au, and 2.6g/t
Ag, and 28.0m grading 0.43% Cu, 0.17g/t Au and 6.1g/t Ag.
Hole CB-119 was collared in Ccalla East 150m to the south of CB-118 and drilled to the
northwest. From 353.7m to 705.0m, a number of intervals of primary
copper mineralization grading from 0.17% Cu to 0.34% Cu were
intercepted.
Step Out Drill Holes
Hole CB-114 was a step out hole at the north end of the Ccalla deposit. From 56m to
92.2m, 36.2m of oxide copper mineralization was intersected grading
0.56% Cu, including 15.1m of 0.80% Cu. At depth, two intervals of
primary copper mineralization of 74.8m and 15.7m length and averaging
0.20% Cu and 0.10% Cu respectively were intersected.
Hole CB-115 was collared in the western border of the Ccalla deposit,. From surface
to 4.2m, a mineralized leached cap was intersected grading 0.56g/t Au,
18.9g/t Ag. This was successively underlain by 114.5m of oxide copper
mineralization averaging 0.36% Cu, 0.18g/t Au and 2.0g/t Ag, including
10.0m grading 0.93% Cu, 0.31 g/t Au, 2.4g/t Ag, and by 46.1m of primary
mineralization grading 0.32% Cu, 0.16 g/t Au, 2.3g/t Ag. Three more
intervals of primary mineralization were intersected, the last of which
consisted of 119.6m averaging 0.61% Cu, 0.25g/t Au, 4.3g/t Ag,
including 64.4m grading 0.82% Cu, 0.32g/t Au and 5.0g/t Ag. The hole
bottomed in mineralization.
Hole CB-116 was a step out hole drilled off the southern margin of the Azulccaca
deposit. Two intervals of primary copper mineralization were
intersected, including 127.7m grading 0.16% Cu and 20.0m grading 0.17%
Cu.
Infill Drill Holes
Hole CB-109 was collared in the Ccalla deposit. From surface to 146m, oxide copper
mineralization grading 0.46% Cu, 0.40 g/t Au and 2.0 g/t Ag was
intersected, including intervals of 14.0m averaging 0.70% Cu, 0.35 g/t
Au, 1.7g/t Ag, and 64m grading 0.53% Cu, 0.48g/t Au, and 2.1g/t Ag.
Below this, 61.5m of primary mineralization averaging 0.22% Cu, 0.10g/t
Au and 1.4g/t Ag was intersected.
Hole CB-110 was drilled in the Ccalla deposit and. From surface to 2.2m oxide
copper mineralization averaging 0.35% Cu, 0.41g/t Au and 2.1g/t Ag was
intersected. This was underlain by 51.4m of enriched chalcocite
mineralization grading 0.45% Cu, 0.44g/t Au, 3.5g/t Ag, including 10.0m
averaging 0.91% Cu, 0.32g/t Au, 4.4g/t Ag. From 132.1m to 261.8m,
129.7m of primary mineralization grading 0.48% Cu, 0.37g/t Au, 4.0g/t
Ag was intersected, including 89.9m averaging 0.57% Cu, 0.48g/t Au and
4.3g/t Ag.
Hole CB-111 was located in the Ccalla deposit. From surface, an 88.5m interval of
oxide copper mineralization averaged 0.93% Cu, 0.10g/t Au, 2.2g/t Ag,
including 51.5m grading 1.24% Cu. This was underlain by four separate
intervals of copper primary mineralization grading between 0.19% Cu and
0.28% Cu.
Hole CB-112 was located in the Ccalla deposit. From surface to 86.7m, the hole
intersected oxide copper mineralization averaging 0.43% Cu, 0.31g/t Au,
3.3g/t Ag, including 26.8m grading 0.73% Cu, 0.35g/t Au, 4.8g/t Ag.
This was underlain by 103.6m of primary mineralization averaging 0.79%
Cu, 0.58g/t Au, 5.2g/t Ag, including 67.9m grading 1.06% Cu, 0.84g/t Au
and 6.8g/t Ag.
A map showing the locations of the drill holes is available at Panoro's
website, www.panoro.com. Three drills continue working on the step-out, exploration and infill
drilling targeting continued growth of the resource and upgrade of the
high grade pit area to the Indicated category.
About Panoro
Panoro's strategic focus is to move its advanced stage projects to the
feasibility and development stages and to explore its other projects.
The Company owns the advanced Cotabambas Copper-Gold and Antilla
Copper-Molybdenum Projects which include Inferred level resources of:
Cotabambas:
|
|
404.1 Mt @ 0.42% Cu, 0.23g/t Au and 2.84g/t Ag @ 0.2% Cueq cut-off (AMEC
2012)
|
|
|
(in situ content of 3.75 billion lbs. Cu, 3.0 million oz. Au, 36.9
million oz. Ag)
|
|
|
|
Antilla:
|
|
154 Mt @ 0.47% Cu and 0.009% Mo @ 0.25% Cu cut-off (AMEC, 2009)
|
|
|
(in-situ content of 1.6 billion lbs. Cu and 30 million lbs. Mo)
|
Panoro is very well positioned to continue advancing the exploration at
the Antilla and Cotabambas Projects. The Company completed a $15
million financing in March 2013 and is planning to continue its
exploration activities, updating the resource estimates for both
projects in 2013 and commencing Preliminary Economic Assessments.
Additional drill results will be announced as they are received from
the ongoing exploration at Cotabambas Cu/Au/Ag Project.
Panoro's significant portfolio of properties is located primarily in the
south-eastern region of Peru. This region contains a number of
important copper and copper/gold deposits including Xstrata's Las
Bambas and Antapaccay Copper Projects and the Tintaya Copper Mine. In
September 2010, Xstrata announced US$5.7 billion of investment to
develop the Las Bambas and Antapaccay projects. The region also
includes First Quantum Minerals' Haquira Copper Project, HudBay
Minerals' Constancia Copper Project and Southern Copper's Los Chancas
Copper Project.
Luis Vela, a P. Geo Qualified Person under National Instrument 43-101,
has reviewed and approved the scientific and technical information in
this press release.
On behalf of the Board of Panoro Minerals Ltd.
Luquman Shaheen, M.B.A., P.Eng., P.E.
President & CEO
This release was prepared by management of the Company who takes full
responsibility for its contents. Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
SOURCE: Panoro Minerals Ltd.