VANCOUVER, Oct. 8, 2013 /CNW/ - Rathdowney Resources Ltd. ("Rathdowney" or the "Company") (TSXV: RTH) is pleased to report on additional studies of silver mineralization and
other activities at Project Olza, located 70 km northwest of Krakow in
southern Poland. Olza is a Mississippi Valley Type (MVT) Zinc
(dominant)-Lead-Silver project situated in the historic Silesian mining
district, the world's largest MVT district which has seen long term
production. The district has extensive infrastructure including power,
rail and other facilities to support mine development.
The focus on added potential from silver was driven by preliminary
metallurgical work (see Rathdowney News Release dated June 18, 2013)
which showed standard zinc and lead flotation conditions, without any
upgrading, produces optimum metallurgy and excellent recoveries to zinc
and lead concentrates with 83% recovery of silver to the zinc
concentrate.
During its drilling programs, Rathdowney's technical team recognized
that significant amounts of silver accompany zinc and lead in these MVT
deposits. From mid-2011 to early 2013, Rathdowney drilled two hundred
and twenty-three (223) holes in the central part of the Zawiercie and
Rokitno concessions, confirming the presence of substantial mineral
resources (21.2 million tonnes in the inferred category grading 7.42%
combined zinc and lead at a 2.0% zinc cutoff1) in this area as well as excellent potential for expansion.
Rathdowney's drilling also confirmed the presence of important
concentrations of silver in the deposit; some of the intersections with
key silver results are tabulated below. Full results were previously
disclosed in Company news releases in 2012 and 2013 (see news releases
and drill hole location maps posted on the Company website).
Drill Hole Number
|
From
(m)
|
To
(m)
|
Intercept
(m)
|
Zn+Pb*
%
|
Zn
%
|
Pb
%
|
Ag
g/t
|
OLZ-011
|
|
99.90
|
104.00
|
4.10
|
20.15
|
14.97
|
5.18
|
68.4
|
OLZ-014
|
|
98.00
|
101.40
|
3.40
|
11.47
|
11.22
|
0.25
|
51.0
|
OLZ-028
|
|
99.30
|
102.25
|
2.95
|
14.71
|
14.65
|
0.07
|
60.1
|
OLZ-029
|
|
98.75
|
102.00
|
3.25
|
15.10
|
15.08
|
0.01
|
56.4
|
OLZ-039
|
|
85.20
|
89.10
|
3.90
|
14.64
|
14.21
|
0.43
|
51.2
|
OLZ-089
|
|
117.55
|
118.90
|
1.35
|
7.45
|
7.36
|
0.09
|
80.2
|
OLZ-092
|
|
80.90
|
81.80
|
0.90
|
7.05
|
4.07
|
2.98
|
50.0
|
OLZ-102
|
|
134.90
|
141.35
|
6.45
|
16.86
|
9.30
|
7.56
|
57.8
|
OLZ-102
|
Incl
|
138.10
|
141.35
|
3.25
|
29.60
|
17.72
|
11.88
|
106.0
|
OLZ-154
|
|
79.05
|
81.25
|
2.20
|
11.50
|
7.89
|
3.61
|
72.4
|
OLZ-157
|
|
156.50
|
159.20
|
2.70
|
20.27
|
15.19
|
5.08
|
52.0
|
OLZ-161
|
|
136.82
|
140.20
|
3.38
|
15.44
|
14.71
|
0.73
|
94.2
|
OLZ-185
|
|
128.00
|
130.10
|
2.10
|
0.14
|
0.14
|
0.002
|
103.9
|
All diamond core holes were drilled vertically through the
sub-horizontal mineralized horizons
so intersections represent approximate true widths. *Figures may not
some due to rounding.
|
"Our drilling had shown that these MVT deposits host zinc, lead and
silver mineralization of significant grades and thicknesses; however,
the results are particularly compelling in light of the more recently
completed metallurgical studies," stated President and CEO John Barry.
"Importantly, the presence of silver, and our ability to recover it,
indicates the opportunity for economic enhancement of the currently
identified mineral resources. This provides an excellent basis to move
forward. Our site team is focused on project-data compilation and
assessment and planning for ongoing environmental and engineering and
community engagement activities to advance the project."
________________________
1 Individual grades are 5.8% zinc and 1.54% lead. For further details
see Rathdowney News Release dated September 11, 2012
"Project Olza is located in a brownfield setting, connected by rail to
the fully-integrated mining infrastructure at nearby Boleslaw that is
currently supplied by mines nearing the end of their operating life,"
added Barry. "These are key advantages for our project that provide a
major competitive advantage over the small group of junior companies
developing zinc-lead-silver deposits around the world. We plan to work
closely with our neighbours to explore synergies that provide the very
real opportunity to reduce the capital costs and to shorten the
permitting timeline."
About Rathdowney
Rathdowney Resources Ltd. is a mineral exploration company focused on
finding and developing the next generation of zinc-lead-silver
deposits. Rathdowney is associated with Hunter Dickinson Inc. ("HDI") a
diversified, global mine development company with a 25-year history of
mineral development success. From its head office in Vancouver, Canada,
HDI applies its unique strengths and capabilities to acquire, develop,
operate and monetize mineral properties that provide consistently
superior returns to shareholders.
The technical information in this release has been reviewed by Mark
Rebagliati, P.Eng, a Qualified Person as defined by NI 43-101.
John Barry
President & CEO
Sample preparation and analysis for Project Olza is done at ISO 17025:20
05 accredited Omac Laboratories Ltd. (Stewart Group/ALS Laboratory
Group) in Loughrea, Ireland. All samples are assayed for zinc, lead
and silver by HNO3, KCLO4 and HBr and the final solution in dilute Aqua Regia is determined by
Inductively Coupled Plasma-Optical Emission Spectroscopy (ICP‐OES)
finish. These three elements and 42 additional elements are also
determined for all samples by 4 acid digestion, followed by ICP‐OES
finish. As part of a comprehensive QA/QC program, one standard and one
replicate are inserted into the sample stream in each group of 20
samples, as well as one or more blanks in each analytical batch.
|
Neither the TSX Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.
This release includes certain statements that may be deemed
"forward-looking statements". All statements in this release, other
than statements of historical facts, that address exploration drilling,
exploitation activities and events or developments that the Company
expects, are forward looking statements. Although the Company believes
the expectations expressed in such forward-looking statements are based
on reasonable assumptions, such statements are not guarantees of future
performance and actual results or developments may differ materially
from those in the forward-looking statements. Factors that could cause
actual results to differ materially from those in forward-looking
statements include market prices, exploitation and exploration
successes, continuity of mineralization, uncertainties related to the
ability to obtain necessary permits, licenses and title and delays due
to third party opposition, changes in government policies regarding
mining and natural resource exploration and exploitation, continued
availability of capital and financing, and general economic, market or
business conditions. Investors are cautioned that any such statements
are not guarantees of future performance and actual results or
developments may differ materially from those projected in the
forward-looking statements. For more information on the Company,
investors should review the Company's continuous disclosure filings
that are available at www.sedar.com.
SOURCE Rathdowney Resources Ltd.