Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Tosca Mining to Drill Carol Copper Project, Sonora, Mexico


Tosca Mining to Drill Carol Copper Project, Sonora, Mexico

Vancouver, British Columbia CANADA, April 09, 2014 /FSC/ - Tosca Mining Corp.(TSQ-TSX-V;TSMNF-OTCBB;TQ41-FSE) announces that it has entered into a contract with Layne De Mexico SA de SV, to undertake a drill program on its Carol Copper project, Sonora, Mexico. Site preparation is now underway with drilling expected to commence by the end of April.

The initial drill program will consist of 5 to 7 HQ size holes totaling 500-700 metres. The planned drilling will investigate the continuity, extent and morphology of near surface skarn mineralization occurring within a shallowly dipping metasedimentary sequence, as well as possible porphyry-style mineralization  The Piedras Verdes porphyry copper deposit, Mexico's third largest copper producer, is located 4 km SW of the Carol Property.

The drill program is the first ever to be conducted on the property. It will focus on the Balde Sur area where 12 trenches previously excavated at widely separate locations within an area measuring approximately 1000 metres by 500 metres encountered significant Cu-Ag Zn- Au skarn-type mineralization.

Recently Tosca reopened select portions of two of these trenches, BS-06 and BS-08, to validate past results in preparation for a proposed drill program. Continuous chip-channel sampling, conducted at one-metre intervals, has confirmed the presence of significant mineralization in both trenches as shown in the attached table.

-***-

---------------------------------------------------------------

Trench      Width (m)               Average Grade
---------------------------------------------------------------
---------------------------------------------------------------

                        Cu (%)    Ag (g/t)  Zn (%)    Au (g/t)
----------- ----------- --------- --------- --------- ---------

BS - 06     8.0         1.06      22.5      11.87     0.26
----------- ----------- --------- --------- --------- ---------

BS - 08     11.0        0.38      22.4      0.48      0.08
----------- ----------- --------- --------- --------- ---------

And         8.0         0.48      16.5      0.62      0.07
----------- ----------- --------- --------- --------- ---------

-****-


Additionally, two grab samples taken from historic workings located in the immediate vicinity of trench BS-06 (one to the south and one to the north) returned significant high-grade results as shown in the attached table.

-***-

------------------------------------------------------------------

Sample         Width (m)               Average Grade
------------------------------------------------------------------
------------------------------------------------------------------

                           Cu (%)    Ag (g/t)  Zn (%)    Au (g/t)
-------------- ----------- --------- --------- --------- ---------

BS - 06 N      Grab        7.00      94.3      34.00     0.61
-------------- ----------- --------- --------- --------- ---------

BS - 06 S      Grab        3.70      30.3      19.00     0.67
-------------- ----------- --------- --------- --------- ---------

-****-


The company also wishes to annouce a non-brokered private placement offering of up to six million units at a price of 6 cents per unit for gross proceeds of up to $360,000. Under the terms of the offering, each unit will consist of one common share in the capital of the company and one non-transferable common share purchase warrant.  Each warrant will entitle the holder to purchase one additional share of the company for a period of two years from the date of issue, at a price of 8 cents in year one and 10 cents in year two. Finders' fees may be payable. The private placement and finders' fees are subject to regulatory approval.

Proceeds from the placement will be utilized for ongoing work on the Carol copper project located in Sonora, Mexico, and for general working capital.

Ian Foreman, PGeo, is the qualified person, as defined by NI 43-101, for the Carol project and is responsible for the technical information in this news release.

On behalf of the Board of Directors,
"Ron Shenton"

For more information:
Brian Roberts
(604) 687-6562
info@toscamining.com


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Statements in this press release, other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.

To view this press release as a PDF, please click on the following link
http://www.fscwire.com/sites/default/files/news_release_pdf/tosca04092014.pdf



Source: TOSCA Mining Cor. (TSX-V TSQ)
Maximum News Dissemination by FSCwire. http://www.fscwire.com


Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today