Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Kaminak Reports Over 90% Gold Recovery From 23 of 26 Column Leach Tests on Coffee Oxide Material at Various Crush Sizes

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 4, 2015) - Kaminak Gold Corporation (TSX VENTURE:KAM) today announced results of the comprehensive metallurgical test work program at the Coffee Gold Project, Yukon, that will provide process input data for the Feasibility Study scheduled for completion in early 2016. The primary objectives of the metallurgical program were to confirm the previous excellent metallurgical test results, expand the testing to all currently known potential mine areas identified, and determine optimal gold recoveries and crush sizes for the Feasibility Study.

Highlights from this work include:

• Column leach gold recoveries for bulk surface trench oxide samples for the Latte Deposit 6" crushed material averaged 88.5% (2 tests) and for the Supremo Deposit 6" crushed material averaged 87% (2 tests).

• Column leach gold recoveries for bulk surface trench oxide samples for Latte 2" and Latte 1/2" crushed material averaged 93.5% (4 tests), and for Supremo 2" and Supremo 1/2" crushed material averaged 94.5% (4 tests), with very little difference between the 2" and 1/2' crush sizes.

• Column leach gold recoveries for oxide core composites for Latte 2" and Latte 1/2" crushed material averaged 94.2% (4 tests), and for Supremo 2" and Supremo 1/2" crushed material averaged 94.0% (4 tests), again with very little difference between the 2" and 1/2' crush sizes.

• Column leach gold recoveries for oxide core composites for the Double Double Deposit 2" and Double Double 1/2" crushed material averaged 95% (2 tests), and for the Kona Deposit 2" and Kona 1/2" crushed material averaged 89.5% (2 tests).

• Agglomeration was not required for any of the column tests and low reagent consumption was reported. 

• All of the column leach tests at the 0.5 inch size were performed at a temperature of 4 degrees Centigrade to simulate cold climate leaching. Column leach test work was conducted by Kappes, Cassiday and Associates, industry leading experts in heap leach processing.

• Supporting images associated with this metallurgical test work program may be viewed by clicking here.

Fred Lightner, Kaminak Director of Mine Development, stated: "This latest round of metallurgical test work strongly confirms previous testing. The volume of test work now completed on oxide has consistently produced high gold recoveries demonstrating the remarkable amenability of the Coffee deposits to the heap leach process. Crush size and recoveries from all facies, including oxide, upper and mid transitional materials, will be further evaluated in conjunction with the results of the 2015 infill drilling and the updated block models. This analysis will then determine the final decision around crush size to be incorporated into the feasibility study due out in early 2016."

2014-2015 Coffee Gold Project Metallurgical Test Work Program

Results of the column leach tests conducted by Kappes, Cassiday and Associates ("KCA") are detailed below in Table 1 and 2. It should be noted that 3 different crush sizes were tested on the bulk samples: 6" refers to a sample 100% passing 175 mm or approximately 80% passing 150 mm, 2" refers to a sample 100% passing 62.5 mm or approximately 80% passing 50 mm and 0.5 inch refers to a sample 100% passing 16 mm or approximately 80% passing 12.5 mm.

All column leach test work reported no percolation problems; therefore, the use of cement agglomeration was not required. All of the column leach tests at the 16 mm sizes (0.5 inch) were performed at a temperature of 4 degrees Centigrade to simulate cold climate leaching. The 175mm (6 inch) and 62.5mm (2 inch) crush columns were too large to be contained in the refrigerator and were leached at ambient lab temperature. Previous work has shown only a minor (-1%) gold recovery difference between ambient and cold climate leaching.

Table 1 Column Leach Test Results - Bulk Surface Oxide Samples

Column Sample
Description
and Location
Ambient Temp
°C*
Crush Size,
inches
Calculated
Head Grade
g/t Au
Extracted
Grade
g/t Au
Gold Recovery
%
Days of
Leach
Consumption
NaCN
kg/t
Addition
Hydrated Lime
kg/t
Latte - 583150mE Trench 22.0 6 1.241 1.143 92% 68 0.40 0.99
Latte - 583150mE Trench 22.0 2 1.364 1.253 92% 46 0.50 1.01
Latte - 583150mE Trench 4.0 0.5 1.196 1.110 93% 46 0.54 1.00
                 
Latte - 583350mE Trench 22.0 6 1.144 0.971 85% 68 0.41 0.99
Latte - 583350mE Trench 22.0 2 0.890 0.829 93% 46 0.55 1.01
Latte - 583350mE Trench 4.0 0.5 0.970 0.929 96% 46 0.55 0.98
                 
Latte Mine Block** 4.0 0.5 9.541 9.069 95% 67 0.58 0.99
Supremo Mine Block** 4.0 0.5 5.551 5.457 98% 67 0.68 0.99
                 
Supremo T2-T4 Composite 22.0 6 2.098 1.935 92% 67 0.53 1.49
Supremo T2-T4 Composite 22.0 2 2.053 1.914 93% 67 0.96 1.51
Supremo T2-T4 Composite 4.0 0.5 1.902 1.844 97% 67 0.59 1.49
                 
Supremo T3 Composite 22.0 6 2.855 2.353 82%*** 67 0.46 1.51
Supremo T3 Composite 22.0 2 2.280 2.120 93% 67 0.72 1.59
Supremo T3 Composite 4.0 0.5 2.256 2.153 95% 67 0.29 1.51

* The 2 inch and 6 inch crush columns were too large to be contained in the refrigerator and were leached at ambient lab temperature (22°C).

** The Latte and Supremo mine block samples were bulk samples taken at a continuous section of selected higher grade trench locations without any dilution intervals. Latte Mine Block was taken from the 583150mE Trench and Supremo Mine Block was taken from the 6974000mN Trench (T4).

*** The assay screen analysis of the tailings from this test indicated that 53 % of the gold lost to the tailings was contained in plus 100mm (4 inch) size fractions due to an assay of those fractions that was abnormally high. The plus 4 inch tailings assayed 1.48 g/t Au while the plus 4 inch head assay for the same sample was only 0.21 g/t Au. Due to the coarse particle size assaying accuracy is compromised.

Table 2 Column Leach Test Results - Drill Core Composites Oxide Samples

Column Sample
Description and Location
Ambient
Temp
°C
Crush Size,
inches
Calculated
Head Grade
g/t Au
Extracted
Grade
g/t Au
Gold Recovery
%
Days of
Leach
Consumption
NaCN
kg/t
Addition
Hydrated
Lime
kg/t
Latte Oxide West 22.0 2 1.172 1.113 95% 45 0.48 1.52
Latte Oxide West 4.0 0.5 1.222 1.064 95% 45 0.17 1.53
                 
Latte Oxide East 22.0 2 1.034 0.961 93% 81 0.87 1.53
Latte Oxide East 4.0 0.5 0.962 0.906 94% 81 0.30 1.52
                 
Supremo Oxide West 22.0 2 1.306 1.171 90% 67 0.49 1.51
Supremo Oxide West 4.0 0.5 1.276 1.215 95% 67 0.84 1.50
                 
Supremo Oxide East 22.0 2 1.668 1.590 95% 67 0.74 1.53
Supremo Oxide East 4.0 0.5 1.782 1.707 96% 67 0.32 1.49
                 
Kona Oxide 22.0 2 1.415 1.245 88% 81 0.82 1.56
Kona Oxide 4.0 0.5 1.360 1.242 91% 81 0.37 2.06
                 
Double Double Oxide 22.0 2 4.330 4.099 95% 81 0.87 1.56
Double Double Oxide 4.0 0.5 2.988 2.849 95% 81 0.32 2.02

Leach Kinetics of Latte and Supremo Samples

As experienced in earlier test work, the leaching kinetics of all samples was very rapid. Although the finer crush sizes do illustrate somewhat faster leaching, even the 6 inch crush samples leach extremely quickly. For illustration purposes, please view the supporting images associated with this metallurgical test work program by clicking here.

Comparative Bottle Roll Test Work

Results from bottle roll test work undertaken on splits of the same composites utilized for column leaching are detailed below in Table 3. By using a fine grind, recoveries were not substantially increased over the column leach tests, indicating that heap leaching will most probably be economically more attractive than agitation leaching (given the lower capital and operating costs typically associated with heap leaching).

Table 3 Results of Bottle Roll Leach Tests

Description Calculated
Head Grade
g/t Au
Extracted
Grade
g/t Au
Avg.
Tails
g/t Au
Gold
Recovery
%
Consumption
NaCN,
kg/t
Addition
Ca(OH)
2,
kg/t
Latte - 583150mE Trench 1.063 0.930 0.133 87% 0.02 2.25
Latte - 583150mE Trench 1.078 1.018 0.060 94% 0.18 3.00
Latte - 583350mE Trench 0.919 0.856 0.063 93% <0.01 2.25
Latte - 583350mE Trench 0.868 0.830 0.038 96% 0.08 3.00
Latte Mine Block 8.884 8.357 0.527 94% 0.08 3.50
Latte Oxide West 1.125 1.067 0.058 95% 0.08 2.50
Latte Oxide East 0.980 0.927 0.053 95% 0.06 2.50
             
Supremo Mine Block 5.020 4.912 0.108 98% 0.03 2.75
Supremo T2-T4 Composite 1.664 1.620 0.045 97% <0.01 3.00
Supremo T3 Composite 2.399 2.322 0.077 97% 0.13 2.00
Supremo Oxide West 1.242 1.189 0.053 96% 0.02 2.00
Supremo Oxide East 1.777 1.717 0.06 97% 0.10 1.75
             
Kona Oxide 1.234 1.113 0.121 90% 0.31 2.50
             
Double Double Oxide 2.635 2.527 0.108 96% 0.15 2.50

Core Sample Selection for the 2014 - 2015 Metallurgical Test Program

All of the samples used for the core sample portion of column leach tests were composited from drill core consisting of a wide distribution of different drill holes and individual intervals to give a representative sample of each deposit area. Details of the metallurgical test work composite selection are provided in Table 4.

Table 4 Metallurgical Core Composite Selection

Sample Description No. of Core Drill Holes No. of Individual Drill Intervals
Latte Oxide West 5 67
Latte Oxide East 8 56
     
Supremo Oxide West 13 73
Supremo Oxide East 12 97
     
Kona Oxide 11 52
Double Double Oxide 7 67

QA / QC

Kaminak's disclosure of metallurgical data in this press release has been reviewed and approved by Fred Lightner, P.E., Director or Mine Development to Kaminak Gold Corporation, who serves as a Qualified Person under the definition of National Instrument 43-101. Disclosure of additional technical or scientific information in this press release has been reviewed and approved by Tim Smith, P.Geo., Vice President Exploration of Kaminak Gold Corporation, who serves as a Qualified Person under the definition of National Instrument 43-101.

On behalf of the Board of Directors of Kaminak

Eira Thomas, President and CEO, Kaminak Gold Corporation

For further information about Kaminak Gold Corporation or this news release, please visit our website at www.kaminak.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Concerning Forward-Looking Statements

Certain disclosures in this release, including management's assessment of the future potential of the Coffee Project, costs and timings for completion of the Coffee Project feasibliity study and future exploration programs, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Kaminak's operations as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements, including risks as to the completion of the plans and projects. Readers are cautioned not to place undue reliance on forward-looking statements. Except as required by law, Kaminak expressly disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future event or otherwise.

The Company has not made a production decision, and the Company's strategic plan to develop a stand-alone heap leach operation is subject to the results of its Feasibility Study. Further, if and when the Company makes any production decision, it will disclose the basis of such decision in accordance with the requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

Kaminak Gold Corporation
Tony Reda
Vice President of Corporate Development
Direct: 604.646.4534 or Toll Free: 1.844.646.4520
info@kaminak.com
www.kaminak.com

Tags:


Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today