Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

POSITIVE DRILLING AND TRENCHING RESULTS FROM ITOGON GOLD PROJECT, PHILIPPINES

TIGER INTERNATIONAL RESOURCES, INC. (TGR.V) is pleased to provide the following update on activities at the Itogon gold project, Philippines.
 
The Itogon project is 100% held by Tiger International’s Philippine subsidiary Cordillera Tiger Gold Resources, Inc. (“Cordillera Tiger”) under an exploration permit granted by the Philippine government. 
 
ECR Minerals plc (“ECR”) of London, United Kingdom has the right to earn a 50% interest in the Itogon project and is currently the operator of the project, through Cordillera Tiger.  The text below is excerpted from a news release by ECR made June 18th, 2015.  A copy of the full ECR news release may be obtained from www.ecrminerals.com
 
- Excerpt begins -
 
HIGHLIGHTS
 
* Mineralised intervals from diamond drilling (apparent width) include:
4.4m at 2.12 g/t gold from surface in EDD004
7.5m at 0.89 g/t gold from 3.8m in EDD005
8.0m at 2.25 g/t gold from 77.0m in EDD005
10.6m at 1.03 g/t gold from surface in EDD006
5.0m at 1.38 g/t from 48.0m in EDD006
 
* Results from trenching include a mineralised interval (apparent width) of 42.0m at 2.54 g/t gold; trenching is continuing and further assay results are pending
 
* The diamond drilling and trenching results indicate the potential for an extensive supergene enriched oxide gold resource from surface in the main prospect area at the Itogon project
 
Discussion of Results
 
All diamond drill holes except EDD003 intersected near surface gold mineralisation, with intercepts including 4.4m at 2.12 g/t gold from surface in EDD004, 7.5m at 0.89 g/t gold from 3.8-11.3m and 2.9m at 1.55 g/t gold from 13.8-16.7m in EDD005, and 10.6m at 1.03 g/t gold from surface in EDD006. 
 
These intercepts represent part of a widespread supergene enriched oxide gold blanket.  ECR is presently undertaking an extensive trenching program (11 trenches/test pit lines), the results of which will provide additional data regarding the grade and distribution of this mineralisation.
 
To date, assay results have been received in respect of two trenches and include mineralised intervals of 12m at 0.43 g/t gold in TR08 and 42m at 2.54 g/t gold in TR09.  Further assay results are pending, including additional assays from TR09, which may mean that a longer mineralised interval in that trench is reported in due course.
 
Supergene intercepts from ECR’s April 2014 reverse circulation (RC) drilling programme, the results of which were announced in May 2014, included 30.0m at 1.63g/t gold from surface in ERC004 and 16.0m at 17.14g/t gold from 2.0m in ERC008.
 
Beneath the zone of supergene enrichment, five of the six diamond drill holes intercepted steeply dipping zones of gold mineralisation over apparent widths of between 2.0 and 8.0m, the most promising intercept being 8.0m at 2.25 g/t gold from 77.0-85.0 m in EDD005.  This suggests that drilling to date has only tested the uppermost parts of the epithermal system and not the main feeder structures.  This is significant as the high grade intercepts to date are associated with narrow, moderately silicified quartz veins, which indicates the potential for more strongly silicified feeder structures which may be associated with significant gold mineralisation.
 
The diamond drilling has also provided important structural information with respect to key controls on mineralisation.  Specifically, it appears that NE-SW trending structures may have exerted an important control on mineralisation, an observation consistent with the structural setting of other gold deposits in the district.
 
Overall, the grades reported from diamond drilling were lower than those from the Company’s earlier RC drilling programme.  Whilst core recovery was high in all diamond holes, the core was highly fractured.  As supergene gold often presents as flecks within oxidized fractures, the loss of high pressure diamond drilling fluids down the hole may have partly flushed the fractures in the drill core.  A petrological study is planned to consider this possibility.
 
Stephen Clayson, Chief Executive Officer of ECR, commented:
 
“With the benefit of the results reported today and further trenching results, when these become available, the Directors expect to be in a position to proceed with an initial, inferred category resource estimate to serve as a first quantification by ECR of the supergene enriched oxide gold mineralisation which occurs from surface in the main prospect area.  In aid of this objective, an aerial topographical survey of the main prospect area was completed earlier this month.
 
In addition, further exploration with a view to more fully testing the potential of deeper level feeder structures and the distribution of grade within the supergene zone is now being planned.”
 
 
Table 1:  Mineralised Intervals, January-April 2015 Diamond Drilling, Itogon Gold Project, Philippines
 
Hole ID From
(m)
To
(m)
Width
(m)
Gold (g/t)
EDD001 6.0 8.0 2.0 0.37
  152.0 154.0 2.0 0.39
         
EDD002 0.0 2.7 2.7 0.50
EDD002 74.0 78.0 4.0 1.21
inc. 74.0 76.0 2.0 2.01
         
EDD003 No significant intercepts
         
EDD004 0.0 4.4 4.4 2.12
inc. 3.0 3.9 0.9 8.27
         
EDD004 27.2 31.8 4.6 0.53
inc. 27.2 27.7 0.5 1.26
inc. 30.8 31.8 1.0 1.02
         
EDD004 38.1 40.2 2.1 0.49
         
EDD004 47.9 51.9 4.0 0.89
inc. 47.9 48.4 0.5 1.12
  49.6 50.2 0.6 2.61
         
EDD004 54.2 60.8 6.6 0.53
inc. 54.2 54.6 0.4 1.69
         
EDD005 3.8 11.3 7.5 0.89
inc. 4.8 6.0 1.2 1.56
inc. 6.0 7.0 1.0 2.38
         
EDD005 13.8 16.7 2.9 1.55
inc. 15.3 15.8 0.5 5.78
inc. 16.3 16.7 0.4 1.91
         
EDD005 67.0 73.0 6.0 0.34
         
EDD005 77.0 85.0 8.0 2.25
inc. 83.0 85.0 2.0 7.71
         
EDD005 89.0 94.0 5.0 0.51
         
EDD005 97.0 99.0 2.0 0.53
         
EDD006 0.0 10.6 10.6 1.03
inc. 2.6 3.0 0.4 1.89
inc. 4.7 5.1 0.4 1.23
inc. 6.5 7.0 0.5 1.01
inc. 7.4 7.8 0.4 1.80
inc. 8.6 9.0 0.4 2.25
inc. 9.0 9.4 0.4 3.45
inc. 9.4 9.8 0.4 1.98
inc. 9.8 10.6 0.8 1.30
         
EDD006 26.1 28.1 2.0 0.45
         
EDD006 31.7 35.7 4.0 0.64
         
EDD006 40.0 44.0 4.0 0.40
         
EDD006 48.0 53.0 5.0 1.38
inc. 50.0 51.0 1.0 1.19
inc. 52.0 53.0 1.0 4.88
         
EDD006 112.4 116.4 4.0 0.33
         
EDD006 124.9 131.9 7.0 0.83
inc. 125.9 126.4 0.5 2.54
inc. 126.4 126.9 0.5 1.31
inc. 130.9 131.4 0.5 1.05
 
 
Table 2:  Details of ECR Diamond Drill Holes,
Itogon Gold Project, Philippines
 
Hole
ID
Total Depth
(m)
Azimuth
(°)
Declination
(°)
RL
(m)
EDD001 206.3 45 -60 1347.4
EDD002 112.0 45 -60 1181.2
EDD003 121.2 45 -60 1203.9
EDD004 131.3 45 -60 1214.3
EDD005 100.0 45 -60 1194.6
EDD006 137.0 45 -50 1320.8
 
 
Table 3:  Mineralised Intervals, Trenches TR08-09 Itogon Gold Project, Philippines
 
Trench ID From
(m)
To
(m)
Width
(m)
Gold (g/t)
TR08 2.0 14.0 12.0 0.43
  24.0 26.0 2.0 0.66
         
TR09 0.0 42.0 42.0 2.54
inc. 2.0 3.0 1.0 5.32
  10.0 11.0 1.0 16.74
  28.0 29.0 1.0 42.29
  29.0 30.0 1.0 8.78
  34.0 35.0 1.0 4.51
  40.0 41.0 1.0 5.11
 
NB:
Mineralised intervals were calculated as weighted averages using a cut-off grade of 0.30 g/t gold and a maximum of 2.0m internal dilution.  As a result certain reported intervals contain discrete higher grade intervals that are separated by lower grade mineralisation.  In these cases the internal higher grade intervals are also reported.  No top cut has been applied in calculating mineralised intervals.  All widths given in this announcement are apparent width.
 
A map showing the location of the drill holes and trenches may be viewed at: http://www.ecrminerals.com/drill-holes-and-trenching-programme
 
QA/QC
 
A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and analysed by Intertek Testing Services Philippines, Inc. (“Intertek”), an internationally accredited independent analytical laboratory in Metro Manila.  Sampling was carried out under geological supervision.  Upon arrival at Intertek samples were sorted, dried (if necessary), crushed, split and pulverised.  The method of analysis for gold was fire assay (50g charge) with AAS finish.
 
QA/QC measures including the use of certified standards were implemented by ECR and separately by Intertek in relation to the analysis of the samples.  The assay data reported is considered acceptable in the context of these measures.  Assay values have been expressed in this news release as g/t gold but are received from Intertek expressed as ppm gold.  For the purposes hereof ppm gold and g/t can be considered equivalent.
 
The contents of this announcement have been reviewed by Dr Chris Wilson PhD, FAusIMM (CP), FSEG, a geologist with the consultancy Exploration Alliance, which has been engaged by ECR in connection with the Itogon project.
 
- Excerpt ends -
 
QUALIFIED PERSON
 
Dr Chris Wilson PhD, a Fellow (Chartered Professional - Geology) in good standing of The Australasian Institute of Mining and Metallurgy (“AusIMM”) and a Fellow of the Society of Economic Geologists (“SEG”), is responsible for the work programme being implemented on the Itogon project by ECR and has supervised the preparation of (and in doing so has verified) and approved all technical information contained in this news release.
 
Dr Wilson’s standing and membership designation with respect to AusIMM and the SEG, and the nature and extent of his experience which is relevant to the style of mineralisation and type of deposit under consideration at the Itogon project and to the activity which he is undertaking in relation thereto, enable him to qualify for the purposes of this news release as a Qualified Person as defined in Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects.  Dr Wilson, through Exploration Alliance SA, is an independent geological consultant to ECR and has no other relationship of any kind with ECR.  Dr Wilson has no relationship of any kind with Tiger International.
 
ABOUT TIGER INTERNATIONAL
 
Tiger International is a Canadian resource exploration and development company.  The Itogon gold project is located in an established gold mining district known as the Baguio Gold Belt on the island of Luzon in the north of the Philippines, and benefits from an extensive historical dataset. 
 
The Itogon project is 100% held by Tiger International’s Philippine subsidiary Cordillera Tiger Gold Resources, Inc. under an exploration permit granted by the Philippine government. 
 
ECR Minerals plc of London, United Kingdom has the right to earn a 50% interest in the Itogon project and is currently the operator of the project, through Tiger International’s Philippine subsidiary Cordillera Tiger.
 
FOR FURTHER INFORMATION PLEASE CONTACT:
 
Patric Barry, President, Tiger International Resources, at (949) 362.1600 or by email to 26981@att.net