Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Rockhaven Intersects Multiple Vein Structures Around Eastern BRX Zone, Klaza Project, Yukon

V.RK

Rockhaven Intersects Multiple Vein Structures Around Eastern BRX Zone, Klaza Project, Yukon



Vancouver, British Columbia (FSCwire) - Rockhaven Resources Ltd. (TSX-V:RK) (“Rockhaven”) is pleased to announce additional results from the 2015 diamond drill program at its 100%-owned and road-accessible Klaza property, located in the Dawson Range Gold Belt of southern Yukon.  The new assay results are from holes that tested precious metal bearing structures located in the southeastern portion of the drill area.

 

The eight diamond drill holes described in this release are from the east part of the BRX Zone and adjacent portions of the AEX, Pika and unnamed subsidiary structures.  The majority of the mineralized veins cut by these holes are not included in the current mineral resource.  Highlights from the drill holes are as follows:

 

  • 4.08 g/t gold and 63.5 g/t silver over 2.41 m - Hole 240

 

  • 3.56 g/t gold and 30.0 g/t silver over 2.66 m - Hole 242

 

  • 6.01 g/t gold and 192 g/t silver over 1.75 m - Hole 244

 

  • 14.85 g/t gold and 101 g/t silver over 0.51 m - Hole 245

 

  • 26.90 g/t gold and 576 g/t silver and 8.50% lead over 0.42 m - Hole 248

 

  • 3.08 g/t gold and 17.2 g/t silver over 3.41 m - Hole 252

 

“The veins in the southeastern part of the drill area at Klaza are relatively closely-spaced, which suggests potential for bulk tonnage mining,” stated Matt Turner, CEO of Rockhaven.  “These intercepts better define the geological model in this part of the deposit and should allow us to bring this mineralization into the mineral resource.”

 

The following table lists all of the significant intercepts from the announced holes.

 

Drill Hole

Zone ID

From

(m)

To

(m)

Interval

(m)+

Gold (g/t)

Silver (g/t)

Lead

(%)

Zinc

(%)

 

 

 

 

 

 

 

 

 

KL-15-240

Eastern BRX

35.05

36.05

1.00

3.41

2.26

0.005

0.009

incl.

46.90

51.60

4.70

1.24

8.54

0.103

0.194

and incl.

47.58

48.18

0.60

6.85

14.1

0.086

0.180

and incl.

51.18

51.60

0.42

2.11

41.6

0.294

0.115

and

69.33

69.83

0.50

1.72

30.7

0.101

1.185

and

Pika

107.40

110.63

3.23

3.22

48.2

0.053

0.026

incl.

107.40

109.81

2.41

4.08

63.5

0.070

0.030

and incl.

109.21

109.81

0.60

10.95

115

0.210

0.064

and

sub.

155.77

157.58

1.81

2.02

0.87

0.004

0.023

 

 

 

 

 

 

 

 

 

KL-15-242

Eastern BRX

44.81

47.85

3.04

1.01

85.0

0.601

1.606

incl.

47.23

47.85

0.62

2.46

156

0.279

0.858

and

sub.

81.93

82.44

0.51

0.68

168

0.341

0.968

and

Pika

166.25

168.91

2.66

3.56

30.0

0.080

0.384

incl.

168.41

168.91

0.50

7.57

50.4

0.086

0.395

and

sub.

174.82

178.34

3.52

1.55

12.3

0.039

0.071

incl.

176.98

177.73

0.75

4.90

28.5

0.088

0.151

and

190.95

191.50

0.55

3.98

16.2

0.242

0.407

 

 

 

 

 

 

 

 

 

KL-15-244

Eastern BRX

71.02

71.96

0.94

3.11

91.2

1.941

4.556

and

sub.

99.89

102.23

2.34

0.87

3.92

0.044

0.207

and

Upper Pika

130.57

135.28

4.71

1.07

7.14

0.026

0.041

incl.

132.83

133.30

0.47

7.54

49.3

0.129

0.231

and

Lower Pika

196.84

198.59

1.75

6.01

192

0.853

1.581

incl.

196.84

197.68

0.84

11.55

396

1.765

3.280

 

 

 

 

 

 

 

 

 

KL-15-245

sub.

105.44

105.90

0.46

2.77

837

1.305

2.530

and

137.03

137.42

0.39

0.80

259

0.602

0.489

and

Eastern BRX

151.87

152.98

1.11

1.35

18.1

0.144

0.559

and

157.37

157.73

0.36

1.05

234

0.303

1.045

and

161.42

166.93

5.51

2.21

21.4

0.192

0.244

incl.

161.42

161.83

0.41

7.45

129

0.521

0.456

and incl.

166.42

166.93

0.51

14.85

101

1.420

1.960

and

sub.

188.50

188.80

0.30

11.05

8.26

0.003

0.023

and

193.34

194.88

1.54

1.06

0.81

0.002

0.005

and

198.01

200.09

2.08

1.29

4.34

0.045

0.044

and

Upper Pika

205.00

206.35

1.35

4.06

19.0

0.024

0.076

incl.

205.00

205.58

0.58

8.47

42.1

0.044

0.146

and

Pika

263.46

263.77

0.31

1.01

43.0

0.019

0.010

and

265.09

266.17

1.08

1.67

66.8

0.101

0.148

incl.

265.75

266.17

0.42

3.50

168

0.237

0.366

 

 

 

 

 

 

 

 

 

KL-15-248

sub.

63.69

64.59

0.90

4.27

98.1

0.553

0.814

and

73.45

76.25

2.80

3.25

40.5

0.426

0.855

incl.

75.37

76.25

0.88

8.79

110

1.040

2.250

and

AEX

97.32

97.74

0.42

26.90

576

8.500

3.550

and

sub.

121.80

123.21

1.41

3.33

38.6

0.242

0.191

incl.

121.80

122.15

0.35

12.80

45.4

0.108

0.218

and

148.44

149.25

0.81

1.30

4.52

0.072

0.106

and

159.93

160.63

0.70

1.61

34

0.536

2.400

and

165.76

167.18

1.42

1.07

12.2

0.048

0.072

and

201.83

202.87

1.04

2.15

10.8

0.085

0.172

and

209.13

209.84

0.71

2.66

21.7

0.116

0.209

and

Eastern BRX

214.65

216.65

2.00

4.45

15.3

0.046

0.050

incl.

216.35

216.65

0.30

14.10

62.7

0.245

0.252

and

228.82

234.50

5.68

1.65

6.44

0.040

0.026

incl.

228.82

230.30

1.48

1.00

10.9

0.020

0.028

and incl.

233.67

234.50

0.83

9.24

19.4

0.215

0.090

and

Upper Pika

272.48

273.22

0.74

4.68

5.3

0.019

0.021

incl.

272.89

273.22

0.33

8.17

8.29

0.027

0.014

 

 

 

 

 

 

 

 

 

KL-15-250

sub.

19.55

19.89

0.34

11.25

489

12.400

8.260

and

AEX

25.92

26.24

0.32

2.91

78

0.118

0.250

and

sub.

53.95

55.04

1.09

1.89

34.6

0.294

1.304

incl.

54.74

55.04

0.30

5.59

99.7

0.876

3.930

and

112.07

115.03

2.96

1.00

10.0

0.117

0.148

incl.

112.07

112.53

0.46

2.15

14.2

0.536

0.476

and incl.

113.89

114.71

0.82

2.02

24.9

0.063

0.110

and

Eastern BRX

133.43

137.50

4.07

1.10

18.4

0.180

0.272

incl.

Eastern BRX

136.87

137.50

0.63

4.50

51.4

0.316

0.212

and

sub.

168.27

168.78

0.51

1.82

6.74

0.015

0.110

and

186.45

186.82

0.37

5.99

27.7

0.060

0.959

and

Upper Pika

218.66

219.00

0.34

1.60

6.89

0.099

0.278

and

220.80

222.01

1.21

1.16

8.36

0.007

0.014

and

225.54

227.97

2.43

1.58

5.2

0.027

0.013

 

 

 

 

 

 

 

 

 

KL-15-252

AEX

113.53

113.87

0.34

1.37

10.3

0.148

0.258

and

sub.

132.71

135.53

2.82

0.98

16.0

0.116

0.239

incl.

134.51

135.53

1.02

2.09

29.1

0.104

0.146

and

149.36

149.67

0.31

2.77

405

0.769

0.719

and

158.74

159.04

0.30

2.11

18.8

0.104

0.120

and

160.17

161.11

0.94

1.08

13.6

0.057

0.104

and

Eastern BRX

198.00

198.57

0.57

1.61

39.3

0.178

0.214

and

Eastern BRX

206.57

207.24

0.67

1.09

44.5

0.041

0.052

and

Upper Pika

289.95

293.36

3.41

3.08

17.2

0.030

0.048

incl.

289.95

290.55

0.60

10.50

26.2

0.057

0.031

and incl.

292.96

293.36

0.40

10.40

104

0.152

0.217

 
 

+ Represents the diamond drill hole sample length.  True widths are estimated to be approximately 80-90% of the interval.

Sub. represents unnamed subsidiary structures that parallel the named zones.

KL-15-246 was collared in front of the Eastern BRX Zone and encountered only weak mineralization within the Pika Zone.

 

The 2015 field program at Klaza is now complete with 13,738 m drilled in 56 holes.  Drilling was focused on expanding the current mineral resource and providing key geotechnical and environmental data to further advance the project.  Maps and sections can be viewed at the Rockhaven’s website at www.rockhavenresources.com.  Additional results will be released on a target by target basis once assays are received, compiled and evaluated.

 

All analyses for rock and core samples from the 2015 program were performed by ALS Minerals with sample preparation in Whitehorse and assays and geochemical analyses in North Vancouver.  Core samples were routinely analyzed for gold by fire assay followed by atomic absorption (Au-AA24) and 48 other elements by inductively coupled plasma-mass spectrometry (ME-MS61).  Samples that exceeded the detection limits of the routine methods were assayed for silver, copper, lead and zinc by inductively coupled plasma-atomic emission spectroscopy (Ag/Cu/Pb/Zn - OG62) and gold by gravimetric analysis (Au-GRA22).  Rigorous procedures were in place regarding sample collection, chain of custody and data entry.  Certified assay standards, coarse reject duplicates, field duplicates and blanks were routinely inserted into the sample stream to ensure integrity of the assay process.  All of the results reported have passed the QAQC screening.

 

The 2015 program was managed by Archer, Cathro & Associates (1981) Limited (Archer Cathro).  Technical information in this news release has been approved by Matthew R. Dumala, P.Eng., a geological engineer with Archer Cathro and qualified person for the purpose of National Instrument 43-101.

 

About the Klaza Project and Rockhaven

 

The road accessible Klaza project hosts a recently announced inferred mineral resource estimate that includes 7,040,000 tonnes containing 948,348 oz gold, 21,780,313 oz silver, 121,060,093 lbs lead and 144,340,881 lbs zinc at an average grade of 4.19 g/t gold, 96.23 g/t silver, 0.78% lead and 0.93% zinc using a 1.5 g/t gold cut-off (see Klaza Property Amended Technical Report dated June 19, 2015 which can be viewed at www.sedar.com under the Rockhaven profile or on the Rockhaven website).

 

Rockhaven Resources Ltd. is a well-funded company focused on growth through exploration of its Klaza project.  For additional information concerning Rockhaven Resources Ltd. or its various exploration projects please visit Rockhaven’s website at www.rockhavenresources.com or contact:

 

Matthew Turner, CEO and Director

Rockhaven Resources Ltd.

T:604-688-2568

mturner@rockhavenresources.com

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/rockhaven09012015.pdf

Source: Rockhaven Resources Ltd. (TSX Venture:RK) http://www.rockhavenresources.com/s/Home.asp

 

Maximum News Dissemination by FSCwire. http://www.fscwire.com

 

Copyright © 2015 Filing Services Canada Inc.







Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today