http://at.marketwire.com/accesstracking/AccessTrackingLogServlet?PrId=1256959&ProfileId=051205&sourceType=1
PERTH, AUSTRALIA -- (Marketwired) -- 05/03/16 -- Centamin plc (LSE: CEY) (TSX: CEE)
Centamin plc ("Centamin" or the "Company")
(LSE: CEY; TSX:CEE)
Centamin plc Results for the Quarter ended 31 March 2016
Centamin plc ("Centamin" or the "Company") (LSE: CEY; TSX: CEE) is pleased to announce its unaudited results for the three
months ended 31 March 2016.
Operational Highlights
- Gold production of 125,268 ounces was a 6% increase on Q4 2015 and 16% higher than Q1 2015.
- Cash cost of production of US$603 per ounce and all-in sustaining costs (AISC) of US$758 per ounce.
- Unchanged 2016 annual guidance of 470,000 ounces at US$680 per ounce cash cost of production and US$900 per ounce AISC.
- Process plant throughput of 2.88Mt was 5% above the base case target rate of 11Mtpa, with scope over the coming quarters for
further throughput increases through ongoing optimisation.
- Open pit mining total material movement of 15.2Mt was a quarterly record with the full annualised rate of 66Mt reached, as
scheduled, for the expanded operation in March.
- Underground mining rates and average grades were above the forecast average for the full year.
- Continued positive results from underground exploration drilling at Sukari supports the potential for further resource and
reserve expansion.
- Exploration continues to support the potential for near-surface and high-grade economic mineralisation in Burkina Faso.
Encouraging results from initial drilling programmes in Côte d'Ivoire.
Financial Highlights
- EBITDA of US$67.5 million was up 42% on Q4 2015 and up 27% on Q1 2015.
- Basic earnings per share 3.56 US cents, up 3.75 US cents on Q4 2015 and up 1.06 US cents on Q1 2015.
- Centamin remains debt-free and un-hedged with cash, bullion on hand, gold sales receivable and available-for-sale financial
assets of US$275.7 million at 31 March 2016, up 19.5% on Q4 2015.
Legal Developments in Egypt
- The Supreme Administrative Court appeal and Diesel Fuel Oil court case are both still on-going. With the potential for the
legal process in Egypt to be lengthy, Centamin anticipates a number of hearings and adjournments before decisions are reached.
Any enforcement of the Administrative Court decision has been suspended pending the appeal ruling.
---------------------------------------------------------------------------- Q1 2016 Q4 2015 Q1 2015 ---------------------------------------------------------------------------- Gold produced ounces 125,268 117,644 108,233 Gold sold ounces 123,668 117,351 111,249 Cash cost of production US$/ounce 603 667 717 AISC US$/ounce 758 851 858 Average realised gold price US$/ounce 1,196 1,103 1,216 ---------------------------------------------------------------------------- Revenue US$'000 148,107 130,196 135,479 EBITDA US$'000 67,484 47,547 52,988 Profit/(loss) after tax US$'000 40,850 (2,081) 28,566 Basic EPS US cents 3.56 (0.19) 2.50 Cash generated from operations US$'000 60,482 53,410 56,643 ----------------------------------------------------------------------------
Notes to highlights
- Cash cost of production, AISC, EBITDA and cash, bullion on hand, gold sales receivables and available-for-sale financial
assets are non-GAAP measures and are defined at the end of the Financial Statements. AISC is defined by the World Gold Council,
the details of which can be found at www.gold.org.
- Basic EPS, EBITDA, AISC, cash cost of production includes an exceptional provision against prepayments, recorded since Q4
2012, to reflect the removal of fuel subsidies which occurred in January 2012 (see Notes 4 and 5 of the Financial Statements)
Andrew Pardey, CEO of Centamin, commented: "The first quarter marked a solid start to the year, with a 42% quarterly increase in
EBITDA to US$67.5 million driven by production at Sukari of 125,268 ounces of gold and a continued downward trend in costs. Cash
cost of production of US$603 per ounce and AISC of US$758 per ounce were a material reduction on the previous quarter and below our
full year guidance. Operationally, processing was a highlight and a key driver of the increase in gold output, with plant
throughput rising above our base forecast rate of 11Mt per annum as the optimisation programme continued. With quarterly production
rates expected to remain within the 450,000 to 500,000 ounces per annum range, our full year guidance remains unchanged at 470,000
ounces at US$680 per ounce cash cost of production and US$900 per ounce AISC. The key focus for the operation during the coming
quarters is on realising the potential for sustained productivity and cost improvements."
To view the full announcement please click the following link:
http://www.rns-pdf.londonstockexchange.com/rns/9440W_-2016-5-2.pdf
Centamin will host a conference call on Tuesday, 3rd May 2016 at 9.00am (London, UK time) to update investors and analysts on
its results. Participants may join the call by dialling one of the following three numbers, approximately 10 minutes before the
start of the call.
UK Toll Free: 0808 237 0040
International Toll number: +44 203 428 1542
Canada Toll free: 1866 404 5783
Participant code: 84900650#
A recording of the call will be available four hours after the completion of the call on:
UK Toll Free: 0808 237 0026
International Toll number: +44 20 3426 2807
Playback Code: 671356#
Via audio link at http://www.centamin.com/centamin/investors
CHIEF EXECUTIVE OFFICER'S REPORT
First quarter gold production of 125,268 ounces represented a 6% increase on the previous quarter. A comparable increase in gold
sales, together with an 8% rise in the average realised gold price and a 10% reduction in the cash cost of production to US$603 per
ounce, saw EBITDA increase by 42% on the previous quarter to US$67.5 million.
The quarterly reduction in unit cash cost of production was primarily a function of both the higher gold production and also an
8% decrease in mine production costs to US$71.6 million. The lower operating expenditure was achieved despite higher processing and
open pit mining rates, and reflects improved cost efficiencies in addition to a continued reduction in fuel prices.
Sukari's strong free cash flows and competitive returns were also highlighted by first quarter AISC of US$758 per ounce, below
our full year guidance of US$900 per ounce. In addition to the factors affecting the cash cost of production, there was a lower
quarterly expenditure on sustaining capital than is expected for the remainder of the year.
Centamin's balance sheet continued to build strength, ending the period with US$275.7 million of cash, bullion on hand, gold
sales receivable and available-for-sale financial assets. This marked an increase of US$45 million during the quarter, and followed
expenditure on exploration (excluding Sukari underground drilling) of US$12.0 million, supported by continued positive drill
results from West Africa. Centamin remains committed to its policy of being 100% exposed to the gold price through its un-hedged
position.
Safety remains a priority and therefore it is pleasing to note that during the period we reached our safety target of zero lost
time injuries.
Processing rates were 4% higher than the prior quarter and 5% above our base case 11Mtpa forecast rate as optimisation
continued. Recoveries of 88.6% were in line with both the previous quarter and our forecast for the full year. Work continues on
developing the potential to improve and sustain recoveries at the 90% level at increasing throughput rates.
The open pit delivered total material movement of 15,157kt, an increase of 10% on Q4 2015 due to improved fleet utilisation and
productivity. During March, mining reached the full annualised rate of 66 million tonnes as scheduled for the expanded operation
and higher quarterly mining rates are expected in the second quarter. Mined ore grades of 0.87g/t were below expected levels for
the full year as production focussed on lower grade sections of the ore body. Pit development has progressed according to the
current mine plan and grades mined and milled increased towards the reserve average by the end of the quarter, as expected.
The underground mine delivered 281kt of ore, a 6% decrease on Q4 2015, at an average grade of 7.77g/t (compared with 7.05g/t in
Q4 2015). The focus for the operation remains to consistently deliver ore at an average grade of at least 6g/t.
Production is forecast to remain in the 450,000 to 500,000 ounces per annum range and we maintain our full year guidance of
470,000 ounces at US$680 per ounce cash cost of production and US$900 per ounce AISC. With gold output now established at target
levels for the expanded Sukari operation, we remain focussed on realising further increases in productivity and cost efficiencies.
Whilst our forecasts remain unchanged, we continue to note that optimisation of the mining and processing operations is ongoing and
offers the potential in the coming quarters to deliver increased gold output and lower costs than this base case outlook.
Our exploration in Burkina Faso continues to build evidence of a number of potentially economic high-grade mineralised
structures, in addition to extensive areas of lower-grade mineralisation. We continue to test the potential for lateral and depth
extensions at these more advanced targets, with priority on the Wadaradoo and Napalapera prospect areas. In Côte d'Ivoire,
first-pass drilling over targets defined by geochemical and geophysical surveys has indicated the potential over a number of
prospects for laterally significant mineralisation.
Developments in the two litigation actions, Diesel Fuel Oil and Concession Agreement, are described in further detail in Note 7
to the financial statements. No final decision has been taken by the courts regarding the Diesel Fuel Oil case and the Company is
aware of the potential for delays in the Egyptian legal system. In respect of the Concession Agreement case, the Company continues
to believe that it has a strong legal position and, in addition, that it will ultimately benefit from law no 32 of 2014, which came
into force in April 2014 and which restricts the capacity for third parties to challenge any contractual agreement between the
Egyptian government and an investor. This law, whilst in force and ratified by the new parliament, is currently under review by the
Supreme Constitutional Court of Egypt. After a series of delays and adjournments, the Concession Agreement appeal has now been set
down for judgment on 24 May 2016. If the judgment is a final judgment, the Company expects it will be in its favour. However, it
has been advised that the Egyptian legal system allows for the possibility of an interim judgment staying the appeal until the
Supreme Constitutional Court has ruled on the validity of law no 32.
OPERATIONAL REVIEW
Sukari Gold Mine
Q1 2016 Q4 2015 Q1 2015 ---------------------------------------------------------------------------- OPEN PIT MINING Ore mined (1) ('000t) 2,405 2,229 2,562 Ore grade mined (Au g/t) 0.87 0.77 0.78 Ore grade milled (Au g/t) 0.83 0.75 0.95 Total material mined ('000t) 15,157 13,754 15,996 Strip ratio (waste/ore) 5.30 5.17 5.24 ---------------------------------------------------------------------------- UNDERGROUND MINING Ore mined from development ('000t) 145 151 129 Ore mined from stopes ('000t) 136 149 135 Ore grade mined (Au g/t) 7.77 7.05 6.01 ---------------------------------------------------------------------------- Ore processed ('000t) 2,876 2,758 2,478 Head grade (g/t) 1.49 1.47 1.48 Gold recovery (%) 88.5 88.5 88.3 Gold produced - dump leach (oz) 2,993 3,417 4,814 Gold produced - total (2) (oz) 125,268 117,644 108,233 ---------------------------------------------------------------------------- Cash cost of production(3) (4) (US$/oz) 603 667 717 Open pit mining 213 232 247 Underground mining 44 42 47 Processing 307 338 369 G&A 39 54 54 AISC(3) (4) (US$/oz) 758 851 858 ---------------------------------------------------------------------------- Gold sold (oz) 123,668 117,351 111,249 Average realised sales price (US$/oz) 1,196 1,103 1,216 ----------------------------------------------------------------------------
(1) Ore mined includes 0t delivered to the dump leach in Q1 2016 (217kt @ 0.52 g/t in Q1 2015).
(2) Gold produced is gold poured and does not include gold-in-circuit at period end.
(3) Cash cost of production exclude royalties, exploration and corporate administration expenditure. Cash cost of production and
AISC are non-GAAP financial performance measures with no standard meaning under GAAP. For further information and a detailed
reconciliation, please see "Non-GAAP Financial Measures" section below.
(4) Cash cost of production and AISC include an exceptional provision against prepayments to reflect the removal of fuel subsidies
which occurred in January 2012 (see notes 4 and 5 to the financial statements).
This information is provided by RNS
The company news service from the London Stock Exchange
RNS
Customer Services
0044-207797-4400
rns@londonstockexchange.com
http://www.rns.com