TORONTO, ONTARIO--(Marketwired - July 28, 2016) - YAMANA GOLD INC. (TSX:YRI)(NYSE:AUY) ("Yamana" or "the
Company") is herein reporting its financial and operational results for the second quarter 2016, including total gold production
of 313,086 ounces, revenue of $466.5 million, net earnings(1) of $32.9 million or $0.03 per share, and adjusted
earnings(1,2) of $5.4 million or $0.01 per share. Additional highlights are provided below.
In addition, the Company is herein providing an exploration update for its 50% owned Odyssey deposit, which is located east of
the main open pit at Canadian Malartic. The exploration program at Odyssey continues to return positive results and an
Inferred Mineral Resource for the Odyssey North zone is expected by year end 2016. The Company expects to provide an
exploration update with further details in the coming weeks on several of its properties, in particular, Chapada, Jacobina,
Gualcamayo and C1 Santa Luz.
OPERATIONAL HIGHLIGHTS
- Total gold production of 313,086 ounces at by-product cash costs(2) and all-in sustaining costs
("AISC")(2) per ounce of $664 and $964, respectively.
- Silver production of approximately 1.8 million ounces at co-product cash costs and AISC per ounce of $8.50 and $12.31,
respectively.
- Copper production of 23.2 million pounds at co-product cash costs and AISC per pound of $1.80 and $2.43, respectively.
FINANCIAL HIGHLIGHTS
- Revenue of $466.5 million, an increase of $11.5 million compared to the second quarter of 2015 due to increased gold sales,
partly offset by lower silver and copper production and significantly lower realized copper price.
- Net earnings(1) of $32.9 million or $0.03 per share, an increase of $39.9 million or $0.04 per share compared to
the second quarter of 2015.
- Adjusted earnings(1,2) of $5.4 million or $0.01 per share, an increase of $13.7 million or $0.02 per share
compared to the second quarter of 2015.
- Mine operating earnings of $63.7 million, an increase of $7.5 million compared to the second quarter of 2015.
- Cash flows from operating activities after net change in working capital(3) of $202.0 million, an increase of
$78.6 million compared to the second quarter of 2015.
- Cash flows from operating activities before net change in working capital(2,3) of $202.0 million, an increase of
$52.7 million compared to the second quarter of 2015.
- Net free cash flow(2) of $37.4 million, an increase of $15.2 million compared to the second quarter of
2015.
- General and administrative expenses of $23.6 million, a decrease of $6.2 million compared to the second quarter of
2015.
(All amounts are expressed in United States dollars unless otherwise indicated.)
1. |
From continuing operations attributable to Yamana equity holders. |
2. |
Refers to a non-GAAP measure. Reconciliation of non-GAAP measures are available at
www.yamana.com/Q22016. |
3. |
Includes a $56.0 million payment on the metal purchase agreement with Altius. |
Key operating and financial statistics for the second quarter 2016 are outlined in the following tables:
KEY STATISTICS
|
Three Months
Ending Jun 30th |
|
Six Months
Ending Jun 30th |
|
(In millions of United States Dollars except for shares and per share amounts, unaudited) |
2016 |
|
2015 |
|
2016 |
|
2015 |
|
Net earnings/(loss) from continuing operations |
32.9 |
|
(7.0 |
) |
71.4 |
|
(142.3 |
) |
Per share |
0.03 |
|
(0.01 |
) |
0.08 |
|
(0.15 |
) |
Adjusted earnings/(loss) from continuing operations |
5.4 |
|
(8.3 |
) |
34.3 |
|
(45.8 |
) |
Per share |
0.01 |
|
(0.01 |
) |
0.04 |
|
(0.05 |
) |
Revenue |
466.5 |
|
455.0 |
|
896.8 |
|
913.0 |
|
Cost of sales excluding depletion, depreciation and amortization |
(283.5 |
) |
(274.5 |
) |
(516.3 |
) |
(556.8 |
) |
Depletion, depreciation and amortization |
(119.3 |
) |
(124.3 |
) |
(226.8 |
) |
(262.2 |
) |
Mine operating earnings |
63.7 |
|
56.2 |
|
153.7 |
|
94.0 |
|
General and administrative expenses |
(23.6 |
) |
(29.8 |
) |
(45.4 |
) |
(56.9 |
) |
Cash flow from operating activities from continuing operations |
202.0 |
|
123.4 |
|
325.0 |
|
137.8 |
|
Per share |
0.21 |
|
0.13 |
|
0.34 |
|
0.15 |
|
Cash flow from operating activities before net change in working capital |
202.0 |
|
149.3 |
|
330.5 |
|
245.3 |
|
Average realized gold price per ounce |
1,267 |
|
1,195 |
|
1,229 |
|
1,206 |
|
Average realized silver price per ounce |
16.82 |
|
16.28 |
|
15.85 |
|
16.51 |
|
Average realized copper price per pound |
2.12 |
|
2.75 |
|
2.12 |
|
2.70 |
|
PRODUCTION SUMMARY - FINANCIAL AND OPERATING SUMMARY
|
Three Months
Ending Jun 30th |
Six Months
Ending Jun 30th |
|
2016 |
2015 |
2016 |
2015 |
Gold produced |
313,086 |
293,707 |
621,146 |
592,814 |
Gold sold |
312,356 |
292,181 |
612,234 |
588,348 |
Silver produced (millions of ounces) |
1.79 |
2.37 |
3.72 |
4.85 |
Silver sold (millions of ounces) |
1.78 |
2.33 |
3.67 |
4.77 |
Copper produced - Chapada (millions of pounds) |
23.2 |
33.6 |
49.0 |
60.5 |
Copper sold - Chapada (millions of pounds) |
26.0 |
31.5 |
48.7 |
58.2 |
|
|
|
|
|
|
Three Months
Ending Jun 30th |
Six Months
Ending Jun 30th |
Gold |
2016 |
2015 |
2016 |
2015 |
Cash costs per ounce |
$664 |
$577 |
$627 |
$615 |
Co-product cash costs per ounce |
$699 |
$705 |
$652 |
$702 |
All-in sustaining costs per ounce |
$964 |
$860 |
$884 |
$875 |
All-in sustaining costs per ounce, co-product basis |
$949 |
$941 |
$868 |
$919 |
Silver |
2016 |
2015 |
2016 |
2015 |
Cash costs per ounce |
$7.98 |
$7.14 |
$7.70 |
$7.30 |
Co-product cash costs per ounce |
$8.50 |
$9.30 |
$8.09 |
$8.68 |
All-in sustaining costs per ounce |
$12.31 |
$11.71 |
$11.45 |
$11.35 |
All-in sustaining costs per ounce, co-product basis |
$12.08 |
$13.12 |
$11.22 |
$12.06 |
Copper |
2016 |
2015 |
2016 |
2015 |
Cash costs per pound of copper - Chapada |
$1.80 |
$1.40 |
$1.66 |
$1.58 |
All-in sustaining costs per pound of copper - Chapada |
$2.43 |
$1.69 |
$2.12 |
$1.89 |
PRODUCTION BREAKDOWN
|
Three Months
Ending Jun 30th |
Six Months
Ending Jun 30th |
Gold Ounces |
2016 |
2015 |
2016 |
2015 |
Chapada |
17,299 |
30,172 |
38,338 |
52,532 |
El Peñón |
54,123 |
55,404 |
110,570 |
115,931 |
Canadian Malartic (50%) |
72,502 |
68,441 |
146,115 |
136,334 |
Gualcamayo |
40,264 |
37,558 |
76,867 |
83,734 |
Mercedes |
22,948 |
19,306 |
47,252 |
43,576 |
Minera Florida |
24,211 |
26,298 |
49,923 |
54,411 |
Jacobina |
29,002 |
21,318 |
58,972 |
39,908 |
Pilar |
22,806 |
21,237 |
44,654 |
40,390 |
Fazenda Brasiliero |
16,873 |
13,974 |
35,397 |
25,998 |
RDM (i) |
13,058 |
- |
13,058 |
- |
Continuing Operations |
313,086 |
293,708 |
621,146 |
592,814 |
Ernesto/Pau-a-Pique |
- |
- |
- |
460 |
TOTAL |
313,086 |
293,708 |
621,146 |
593,274 |
|
|
|
|
|
|
Three Months
Ending Jun 30th |
Six Months
Ending Jun 30th |
Silver Ounces |
2016 |
2015 |
2016 |
2015 |
Chapada |
52,642 |
72,978 |
112,157 |
134,920 |
El Peñón |
1,522,242 |
2,028,975 |
3,130,479 |
4,194,176 |
Mercedes |
103,262 |
78,932 |
227,883 |
192,371 |
Minera Florida |
112,760 |
191,162 |
247,036 |
333,489 |
TOTAL |
1,790,906 |
2,372,047 |
3,717,555 |
4,854,956 |
(i) For the period from acquisition on April 29, 2016 to June 30, 2016. |
OUTLOOK AND STRATEGY
Since its inception, the Company has taken a portfolio approach to managing its business in which every mine and asset in its
portfolio is evaluated based on production, costs, potential and planned returns. In general, the Company looks at a balance
among variables including size and scale, cost, location and opportunity for development and improvement. In addition, the
Company evaluates the amount of management time required by a given asset compared to its inherent value, potential and
opportunities associated with the asset.
The Company continues to focus on operational execution, namely tracking or exceeding operational guidance, as it advances
efforts to create further value within its portfolio including the ramp up of RDM towards expected steady-state production in
early 2017, and development of C1 Santa Luz towards production in 2018 and Cerro Moro earlier that year. The Company is targeting
continuous production growth, and will continue to evaluate opportunities for optimizations and other operational improvements
across its portfolio to further increase its production profile. The Company will pursue these and other organic production
growth opportunities, the latter including Canadian Malartic developments such as Odyssey, the Monument Bay project, Kirkland
Lake opportunities and the Deep Carbonates project at Gualcamayo. Additionally, the Company will pursue internal initiatives to
surface value from dormant assets including Agua Rica, Jeronimo, La Pepa, Suyai and Don Sixto, all of which have well-defined
delineated mineral reserves and/or mineral resources.
Second quarter operational performance was in line with expectations for all mines except for Chapada. At Chapada, several
factors impacted production including a mechanical failure with its in-pit gyratory crusher and weather related issues which made
access to higher grade ores more difficult. Mine management believed throughout the quarter that the operation would be able to
compensate for the disabled in-pit crusher while it was under repair by mining higher grade, softer ores. These softer ores could
be processed directly at the plant, bypassing the in-pit crusher which creates more efficient management for harder and lower
grade ores. However, those higher grade, softer ores required significantly more development work, the access to which was
meaningfully delayed because of restrictions created by the adverse weather. Exacerbating the issue, the in-pit crusher was idled
further, as operational management developed and initiated a plan to repair and improve reliability, with the intent of avoiding
similar issues in the future. The in-pit crusher is now operating as expected. In order to further optimize the in-pit crusher's
performance, management is planning to replace the mantle and concave during the next planned maintenance shutdown, scheduled
during the fourth quarter.
As a result of the production shortfall in the second quarter, production at Chapada is now expected to be 110 million pounds
of copper and 106,000 ounces of gold in 2016. While the size and scale of Chapada implies that now at full operation, more
production is possible, the Company believes the foregoing is a reasonable baseline level of production for 2016. Production
expectations for Chapada remain unchanged for 2017 and 2018.
On a consolidated basis, the Company continues to be well positioned to deliver on gold and silver production guidance for the
full year, based on current assumptions, as other mines have exceeded and continue to exceed expectations. Additionally, second
half production for all metals, as customary, is expected to be higher than first half production.
Cash costs were impacted by the anomalous events at Chapada during the quarter and by foreign exchange rates. Given the
strengthening of local currencies, primarily the Brazilian Real, Canadian Dollar and Chilean Peso, as compared to the Company's
budgeted assumptions in early 2016, cash costs have increased in the second quarter compared to the first quarter. Some of the
cost increases in the second quarter were foreseeable although the local currency strengthened more than anticipated which
increased costs more than expected. The impact from Reais denominated expenditures is partially mitigated as a hedge against the
variability of the United States Dollar was executed during the quarter. The Company entered into zero-cost collar contracts
totaling 510.0 million Reais with average call and put strike prices of 3.40 and 4.13 respectively.
The Company's cost structure has been impacted by certain local currencies strengthening against budgeted assumptions. The
Company also notes that both spot and analyst consensus foreign exchange rates for the remainder of the year are stronger than
the Company's budgeted assumptions, noted below. Based on actual year-to-date results, the current business plan that includes
the revised expectations for Chapada, and using a range of current spot and analyst consensus foreign exchange rates for the
remainder of the year, revised cost guidance is as follows:
REVISED 2016 CONSOLIDATED CO-PRODUCT CASH COST AND CO-PRODUCT AISC GUIDANCE
2016 |
Gold |
Silver |
Copper |
|
Consolidated co-product cash costs (per oz.) (i) |
$635-$675 |
$8.50-$9.00 |
$1.55-$1.75 |
|
Consolidated co-product AISC (per oz.) (i) |
$880-$920 |
$12.00-$12.50 |
$1.95-$2.15 |
2015 |
|
|
|
|
Consolidated co-product cash costs (per oz.) |
$662 |
$8.28 |
$1.46 |
|
Consolidated co-product AISC (per oz.) |
$868 |
$11.35 |
$1.77 |
(i) Based on updated spot foreign exchange rate assumptions per below. |
|
2016 Foreign Exchange Rate Assumptions |
Spot |
Analyst Consensus |
Original Budget |
USD-CAD |
1.30 |
1.32 |
1.35 |
USD-BRL |
3.25 |
3.45 |
4.20 |
USD-ARG |
15.00 |
15.50 |
15.00 |
USD-CLP |
660.00 |
680.00 |
725.00 |
USD-MXN |
18.50 |
18.70 |
17.00 |
The Company remains committed to balance sheet and cost improvements. Efforts to decrease net debt by at least $300
million by the end of 2017 continue. The debt maturity profile remains very manageable and well positioned, especially in the
short- to medium-term with a total of $113 million scheduled debt payments by the end of 2017. The Company continues to target a
Net Debt/EBITDA ratio of between 1.5 to 2.0 times, which it believes to be prudent financial policy and planning.
The Company expects to achieve its target debt levels through organic generation of cash flow from the growing production
profile in the second half of the year, underpinned by higher prevailing gold prices that have improved to an average of $1,260
per ounce during quarter. Further improvements in the gold price, as evidenced during July of 2016 with the average monthly price
in excess of $1,335 per ounce, will advance and accelerate these goals. The following table provides a summary of Net Free Cash
Flow during the period:
|
Three Months
Ending Jun 30th |
|
Six Months
Ending Jun 30th |
|
(In millions of United States Dollars) |
2016 |
|
2015 |
|
2016 |
|
2015 |
|
Cash flows from operating activities of continuing operations |
$202.0 |
|
$123.4 |
|
$325.0 |
|
$137.8 |
|
|
Less: Advance payments on metal purchase agreement |
(56.0 |
) |
0 |
|
(64.0 |
) |
0 |
|
|
Less: Non-discretionary items |
|
|
|
|
|
|
|
|
|
|
Sustaining capital expenditures |
(76.8 |
) |
(64.3 |
) |
(126.5 |
) |
(114.4 |
) |
|
|
Interest and finance expenses paid |
(31.8 |
) |
(36.5 |
) |
(48.8 |
) |
(54.9 |
) |
Net free cash flow |
$37.4 |
|
$22.6 |
|
$85.7 |
|
$(31.5 |
) |
Net Free Cash Flow increased by over 68% compared to the same quarter of 2015 and is expected to increase in the second half
of the year, strengthening the balance sheet and reducing net debt. This will position the Company for the anticipated increase
in expansionary capital as a result of the construction expenditures budgeted for Cerro Moro, in 2017. In 2018, the expected
commissioning of Cerro Morro will start to add to the operating and free cash flows of the Company.
SECOND QUARTER FINANCIAL AND OPERATIONAL RESULTS
Financial results for the three months ended June 30, 2016
Net earnings from continuing operations attributable to Yamana equity-holders for the three months ended June 30, 2016 were
$32.9 million or $0.03 per share basic and diluted, compared to net loss of $7.0 million or $0.01 per share basic and diluted for
the three months ended June 30, 2015. Earnings for the period were higher due to higher gold sales and prices, partly offset by
lower sales of silver and copper, lower realized metal prices for copper and due to lower depletion, depreciation and
amortization ("DDA").
Adjusted earnings (a non-GAAP measure, see Section 13) from continuing operations were $5.4 million or $$0.01 per share for
the three months ended June 30, 2016, compared to adjusted loss of $8.3 million or $0.01 per share for the same period of 2015.
Mine operating earnings for the three months ended June 30, 2016 were $63.7 million, compared to $56.2 million for the same
period in 2015.
Income tax recovery for the three months ended June 30, 2016 was $32.9 million, compared to an income tax recovery of $25.1
million for the same period in 2015. Income tax recovery for the period includes a $38.8 million unrealized foreign exchange gain
in tax.
Revenue for the three months ended June 30, 2016 was $466.5 million, compared to $455.0 million in the same period of 2015
resulting from increased gold sales, by lower silver and copper sales, and a significantly lower price for copper. Revenue for
the second quarter was generated from the sale of 312,356 ounces of gold, 1.8 million ounces of silver and 26.0 million pounds of
copper. This compares to sales of 292,181 ounces of gold, 2.3 million ounces of silver and 31.5 million pounds of copper for the
three months ended June 30, 2015.
The average realized price of gold for the quarter was $1,267 per ounce compared to $1,195 per ounce for the same quarter in
2015, or 6% higher and the average realized silver price was $16.82 per ounce compared to $16.28 per ounce for the same quarter
in 2015, or 3% higher. The average realized price of copper was $2.12 per pound compared to the $2.75 per pound for the second
quarter in 2015, or 23% lower.
Cost of sales excluding depletion, depreciation and amortization for the three months ended June 30, 2016 was $283.5 million,
compared to $274.5 million for the same period in 2015. Cost of sales excluding DDA for the second quarter was higher than that
of the same period in 2015 reflecting increased volume of gold sales, partly offset by lower silver and copper sales volume and
the devaluation of foreign currencies of countries in which the Company operates.
DDA expense for the three months ended June 30, 2016 was $119.3 million, compared to $124.3 million for the same period of
2015. DDA expense was lower than the comparative period due to lower silver and copper sales volume and reflecting lower asset
book values due to the impairment charges recorded in the fourth quarter of 2015, a portion of which related to producing
properties. This is partly offset by higher gold production and the DDA associated with the newly acquired RDM mine.
Other expenses and income include general and administrative, exploration and evaluation, other expenses and net finance
expense totalling $63.7 million for the three months ended June 30, 2016, compared to $88.3 million for the same period in
2015:
- General and administrative expenses were $23.6 million, 20% lower compared to $29.8 million for the same period in 2015.
Results reflect the cost containment initiatives undertaken by the Company.
- Exploration and evaluation expenses were $5.3 million, compared to $4.0 million for the same period in 2015. Higher
exploration and evaluation expenses, relative to 2015, are the result of higher district exploration with an end goal of
mineral reserve and mineral resource expansion, particularly at El Peñón.
- Other expenses were $6.2 million, compared to $10.0 million for the same period of 2015. Other expenses in 2015 include an
equity loss from associate of $6.6 million with no current period comparative balance. Additionally, other expenses in the
current period also reflect a mark-to-market loss on the DSUs following the increase in share price, offset by a mark-to-market
gain on the warrants received as part of the Sandstorm metal sales agreement.
- Net finance expense was $28.6 million, compared to net finance expense of $44.5 million for the same period in 2015. Lower
net finance expense is mainly due to a predominately non-cash unrealized foreign exchange loss of $9.7 million, compared to a
loss of $22.3 million for the comparative period in 2015 and lower interest expense on long-term debt.
Operating Results for the three months ended June 30, 2016
Gold production for the second quarter of 2016 was higher than the comparative period in 2015, higher than the first quarter
of 2016 and in line with expectations at all mines except at Chapada. At Chapada, several factors impacted production including a
mechanical failure with its in-pit gyratory crusher which is now repaired and weather related issues that made access to higher
grade ores more difficult.
Gold
Second quarter production was 313,086 ounces of gold, higher by 7%, compared to 293,707 ounces of gold produced in the second
quarter of 2015. Individual mine quarterly results represent increases over the second quarter of 2015 including an increase of
36% at Jacobina, 19% at Mercedes, 7% at Gualcamayo, 6% at Canadian Malartic, 7% at Pilar and 21% at Fazenda Brasileiro, in
addition to the 13,058 ounces from the recently acquired RDM. These increases were partly offset by decreases at Chapada of 43%
and Minera Florida of 8%.
Notable increases in production from the previous quarter in 2016 include increases of 10% at Gualcamayo and 4% at Pilar.
Cash costs from continuing operations for the second quarter of 2016 averaged $664 per ounce of gold, compared to $577 per
ounce of gold in the second quarter of 2015. Cash costs were 15% higher than the comparative period in 2015 due to lower
by-product copper credit as a result of significantly lower copper prices and lower quantities sold, partly offset by higher gold
production and the devaluation of local currencies. Co-product cash costs from continuing operations for the second quarter were
$699 per ounce of gold, compared to $705 per ounce of gold for the second quarter of 2015, representing a 1% decrease.
All-in sustaining costs from continuing operations ("AISC") were $964 per ounce of gold, higher by 12% compared to $860 per
ounce of gold in the second quarter of 2015. On a co-product basis, AISC from continuing operations were $949 per ounce of gold
for the second quarter, compared to $941 per ounce of gold for the second quarter of 2015, representing a 1% increase. AISC
increased, compared to the first quarter of 2016, due to higher anticipated sustaining capital expenditures and mine development,
in line with plans, and the appreciation of certain currencies in the jurisdictions in which the Company operates. AISC were
higher than co-product AISC due to a decrease in copper margins and the planned higher sustaining capital expenditures associated
with copper, both of which negatively impacted by-product credits. The decrease in copper margins was a result of lower prices
and the additional costs related to the anomalous second quarter production and costs at Chapada.
Silver
Second quarter silver production was 1.8 million ounces, compared to the 2.4 million ounces in the same quarter of 2015. Mine
sequencing at certain locations continues to extract from areas with lower silver grades. Production was in line with
expectations for silver. Continuing improvements at Mercedes also resulted in higher than expected silver production which was
31% higher, compared to the second quarter of 2015.
Cash costs for the second quarter of 2016 were $7.98 per ounce of silver, representing an increase over the $7.14 per ounce of
silver in the second quarter of 2015. However, cash costs on a co-product basis for the second quarter were $8.50 per ounce of
silver, compared to $9.30 per ounce of silver in the second quarter of 2015 or 9% lower. Co-product cash costs per ounce of
silver were also 10% lower during the quarter, compared with the first quarter of 2016. Cash costs for silver were lower due to
the lower cost allocation to silver based on the relative production contribution between gold and silver during the period at El
Peñón and Minera Florida.
Copper
Total copper production for the second quarter of 2016 was 23.2 million pounds, compared to 33.6 million pounds for the same
period of 2015 impacted by the poor weather conditions and the unplanned shutdown of the primary gyratory crusher during the
quarter at Chapada.
Co-product cash costs per pound of copper were $1.80 per pound from the Chapada mine, compared to $1.40 per pound of copper in
the first quarter of 2015, representing a 29% increase.
Chapada, Brazil
At Chapada, several factors impacted production including a mechanical failure with its in-pit gyratory crusher and weather
related issues which made access to higher grade ores more difficult. Mine management believed throughout the quarter that the
operation would be able to compensate for the disabled in-pit crusher while it was under repair by mining higher grade, softer
ores. These softer ores could be processed directly at the plant, bypassing the in-pit crusher which creates more efficient
management for harder and lower grade ores and is less effective with softer, oxidized ore with a higher moisture content.
However, those higher grade, softer ores required significantly more development work, the access to which was meaningfully
delayed because of restrictions created by the adverse weather. Exacerbating the issue, the in-pit crusher was idled
further, as operational management initiated a plan to repair and improve its performance, with the intent of avoiding similar
issues in the future. The in-pit crusher is now operating as expected. In order to further optimize the in-pit crusher's
performance, operational management is planning to replace the mantle and concave during the next planned maintenance shutdown,
scheduled during the fourth quarter. Development work is progressing normally.
Chapada produced 17,299 ounces of gold and 52,642 ounces of silver for the second quarter of 2016, compared to 30,172 ounces
of gold and 72,978 ounces of silver in the second quarter of 2015. Co-product cash costs were $521 per ounce of gold and $3.81
per ounce of silver in the second quarter of 2016, compared to $324 per ounce of gold and $2.97 per ounce of silver in the second
quarter of 2015.
Changes to the flotation circuit including modifications to the flow chart were completed in the second quarter as planned and
are expected to improve recoveries for copper and gold to more than 78% and 56%, respectively for the second half of the year.
During July, recoveries had a steady increase over the second quarter, and trended up from the first half the year level of 74.2%
and 51.8% respectively. In the last two weeks of July, average recoveries for copper and gold were 83% and 56% respectively.
Operation of the primary gyratory crusher is now normalized, resulting in the processing of higher grade ore and decreasing
reliance on stockpiles. As a result of the production shortfall in the second quarter, the crushing circuit back to nameplate
capacity and the positive impacts of initiatives to improve recoveries, full year 2016 production at Chapada is now expected to
be at or above 106,000 ounces of gold and 110 million pounds of copper. As the Company begins to see the improvements in the
operation of the gyratory crusher and benefits from planned recovery improvements, there is a possibility that the mine may
perform over and above this nominal guidance Production expectations and guidance for 2017 and 2018 remain unchanged.
Due to the aforementioned remediations and improvements that have occurred early in the third quarter, the items that affected
production for the period are not expected to continue or impact the production for the upcoming years.
The Company continues to advance plans for a study at Suruca, which updates historical technical work to current economic
inputs, which is expected to be completed in the first half of 2017, with start-up of production targeted now for the first
quarter of 2019, rather than 2021. Suruca is expected to add additional gold production at Chapada in the range of 45,000 to
60,000 ounces per year.
Cash costs and all-in sustaining cash costs for the second quarter, compared to the same quarter of 2015 were impacted by the
lower production and higher waste movement costs. Cash costs were also impacted by lower by-product copper credit as a result of
significantly lower copper prices and lower quantities sold.
Chapada produced 38,338 ounces of gold and 112,157 ounces of silver in the first half of 2016, compared to 52,532 ounces of
gold and 134,920 ounces of silver in the same period of 2015. Cash costs were $47 per ounce of gold and negative $9.73
per ounce of silver in the first half of 2016, compared to negative $606 per ounce of gold and negative $46.1
per ounce of silver in the same period of 2015.
Copper production was 23.2 million pounds in the second quarter of 2016, compared to production of 33.6 million pounds of
copper in the same quarter of 2015. Co-product cash costs for copper were $1.80 per pound in the second quarter of 2016, compared
to $1.40 per pound in the same quarter in 2015. For the first half of the year, copper production was 49.0 million pounds,
compared to production of 60.5 million pounds of copper in the same period of 2015. Co-product cash costs for copper were $1.66
per pound in the first half of 2016, compared to $1.58 per pound in the same period in 2015.
El Peñón, Chile
El Peñón continues to be positioned to meet production guidance for the full year as it focuses on improving operational
efficiency and near mine exploration, despite unanticipated poor ground conditions at Orito and lower grades in narrow vein areas
which resulted in lower production at El Peñón during the second quarter. Lower gold production in the second quarter, compared
to the second quarter of 2015 was caused by lower throughput, partly offset by higher recovery. Lower silver production, compared
to the second quarter of 2015 was anticipated due to lower planned feed grade. Compared to the first quarter of 2016, production
for both gold and silver was lower due to the aforementioned delay in ore production from the stopes of Orito.
Mine development increased significantly compared to the first quarter, in line with the mine plan, as additional metres were
needed to support production from narrow vein areas. Mine development metres improvements continued with an over 13% increase
compared to the base line at the beginning of the year. Other improvement initiatives in the mine continue to advance, including
a review of the mining method and mineral reserves with the objective of improving ore recovery and dilution in the narrow veins
areas.
El Peñón produced 54,123 ounces of gold and 1.5 million ounces of silver in the second quarter of 2016, compared to 55,404
ounces of gold and 2.0 million ounces of silver in the same period of 2015. Cash costs were $686 per ounce of gold and $8.54 per
ounce of silver in the second quarter of 2016, compared to $658 per ounce of gold and $9.21 per ounce of silver in second quarter
of 2015.
Cash costs for gold were impacted by lower production, compared to the second quarter of 2015, offset by cost reductions
implemented and the devaluation of the Chilean Peso. Cash costs for silver were lower due to the lower cost allocation to silver
based on the relative production contribution between gold and silver during the period.
El Peñón produced 110,570 ounces of gold and 3.1 million ounces of silver in the first half of 2016, compared to 115,931
ounces of gold and 4.2 million ounces of silver in the same period of 2015. Cash costs were $635 per ounce of gold and $8.10 per
ounce of silver in the first half of 2016, compared to $626 per ounce of gold and $8.56 per ounce of silver in same period of
2015.
Canadian Malartic (50% interest), Canada
At Canadian Malartic, second quarter production results met expectations and continue to position the operation to deliver on
full year guidance. Second quarter production exceeded the second quarter of 2015 by 6%, resulting from higher throughput as the
mill averaged 55,481 tonnes per day, which is a quarterly record. Total mill throughput in the first half of the year was also a
record totalling, 9,809,278 tonnes (at 100%), mainly attributable to the optimization of planned maintenance shutdowns. Slightly
lower feed grade compared to the second quarter of 2015 is due to mining less tonnes from the higher grade north zone. Mining
from the higher grade north zone is expected to increase during the third quarter in line with the mining sequence.
In the second quarter of 2016, Canadian Malartic produced 72,502 ounces of gold on a 50%-basis, compared to 68,441 ounces of
gold in the second quarter of 2015. Cash costs were $621 per ounce of gold in the second quarter, compared to $609 per ounce in
the second quarter of 2015.
Cash costs in the second quarter were 2% higher than the second quarter of 2015 resulting from higher contractor costs, partly
offset by higher production and the devaluation of the Canadian Dollar.
Canadian Malartic produced 146,115 ounces of gold on a 50%-basis at cash costs of $589 per ounce in the first half of 2016,
compared to 136,334 ounces of gold at cash costs of $621 for the same period of 2015.
Canadian Malartic is continuing to evaluate opportunities with a focus on cost and production improvements within the mine and
processing plant. In order to increase mining from the higher-grade north zone, a new remote shovel was commissioned at the end
of the second quarter, and has since provided more operational stability with higher grade ore from the north zone. As at the end
of July, 2016, feed grade has averaged 1.05 g/t and it is expected to be at this level for the remainder of the year. In addition
to optimizing planned maintenance shutdowns, a new secondary crusher configuration for increased SAG capacity and process
improvements at the main crusher contributed to the record year-to-date throughput performance. The Company is also continuing to
evaluate opportunities to optimize the returns from this cornerstone asset, including the opportunities available from the
Odyssey project.
Gualcamayo, Argentina
Gualcamayo continued its strong performance in the second quarter and exceeded expectations, well positioning it to meeting
both annual production expectations and costs targets. Increased production is expected to continue in the following periods,
according to plan, due to higher grades in the second half of the year and supported by higher throughput from the build-up of
ore inventory placed on the leach pad and the ramp-up of the sub-level caving in the underground mine, which is progressing into
higher grade areas. Production increased quarter-over-quarter as expected and was higher than the second quarter of 2015 by 7%,
due to higher throughput and recoveries from inventories, partly offset by lower feed grades, in line with mine sequencing and as
a result of the unexpected rain, snow and fog during the second quarter.
In the second quarter of 2016, Gualcamayo produced 40,264 ounces of gold, compared to 37,558 ounces of gold in the same
quarter of 2015. Cash costs were $828 per ounce of gold in the second quarter of 2016, compared to $818 per ounce of gold in the
second quarter of 2015.
Cash costs were slightly higher in the second quarter of 2016, compared to the second quarter of 2015, due to local
inflationary pressures on manpower related costs and camp services partly offset by the devaluation of the Argentinian Peso and
reductions in external mine contractors. Cash cost were higher than the first quarter of 2016, due to higher consumption rate of
reagents to improve recoveries.
Gualcamayo produced 76,867 ounces of gold in the first half of 2016, compared to 83,734 ounces of gold in the same period of
2015. Cash costs were $814 per ounce of gold in the first half of 2016, compared to $783 per ounce of gold in the same period of
2015.
The Deep Carbonates project is a potential large scale, bulk tonnage underground operation beneath the current QDD pit limits
with recoverable gold currently estimated at more than 1.1 million ounces. The project has advanced with the detailed review of a
number of mining method alternatives to improve the capital spend profile as well as seeking to identify an economically viable
arsenic abatement process. The mining consultants have completed their optimization work on three throughput scenarios, and the
work of the Arsenic specialist has also been completed. The development of the economic model is progressing using the outputs
received from the aforementioned technical review process. The mineralization is open in almost every direction and continued
exploration is expected to improve the project economics. The results of the aforementioned work will be evaluated during the
course of 2016, whereupon a decision will be made as to whether to advance to a more detailed phase of study later in the
year.
Mercedes, Mexico
Mercedes continued to deliver improved performance during the second quarter of 2016, resulting from the revised mine plan
along with operational improvements and revisions to the mine's cost structure. Mercedes is also exploring initiatives that are
expected to positively impact the mining rate. At the processing plant, Mercedes began commissioning an oxygen injection system
targeting to increase recoveries for gold by 1% and silver by 4%, beginning in the fourth quarter. With a continued focus on
business optimization and operating efficiencies, Mercedes is well positioned to continue delivering on expectations in the
second half of 2016.
In the second quarter of 2016, Mercedes produced 22,948 ounces of gold and 103,262 ounces of silver, compared to 19,306 ounces
of gold and 78,932 ounces of silver in the same quarter of 2015. Cash costs were $720 per ounce of gold and $9.05 per ounce of
silver in the second quarter of 2016, compared to $1,033 per ounce of gold and $14.56 per ounce of silver in the same quarter of
2015.
Gold and silver production in the second quarter were higher, compared to the second quarter of 2015 by 19% and 31%,
respectively. Increased production was due to significantly higher gold and silver grades and impacted positively by higher
recoveries. Second quarter production is lower than the first quarter of 2016, consistent with the mine plan.
Lower cash costs compared to the second quarter 2015 are attributed to the devaluation of the local currency and the benefits
from the cost control initiatives, in addition to higher grades and recoveries.
Mercedes produced 47,252 ounces of gold and 227,883 ounces of silver in the first half of 2016, compared to 43,576 ounces of
gold and 192,371 ounces of silver in the same period of 2015. Cash costs were $676 per ounce of gold and $8.61 per ounce of
silver in the first half of 2016, compared to $925 per ounce of gold and $12.58 per ounce of silver in the same period of
2015.
Minera Florida, Chile
At Minera Florida, gold and silver production were in line with plan and production is expected to increase over the remainder
of 2016. Higher production is expected in the second half of the year from higher planned throughput at both plants, reducing
overall costs.
Lower gold production, compared to the second quarter of 2015, was due to lower throughput partly offset by higher grade.
Silver production was also impacted by lower throughput in addition to feed grades and recoveries. Minera Florida experienced
severe weather in the beginning of the second quarter impacting production and ore haulage at the mine and the tailings
reprocessing facilities.
In the second quarter of 2016, Minera Florida produced 24,211 ounces of gold and 112,760 ounces of silver, compared to 26,298
ounces of gold and 191,162 ounces of silver in the same quarter of 2015. Cash costs were $785 per ounce of gold and $9.70 per
ounce of silver in the second quarter of 2016, compared to $748 per ounce of gold and $10.45 per ounce of silver in the same
quarter of 2015.
Higher cash costs for gold compared to the second quarter of 2015 was due to lower production, partly offset by cost reduction
initiatives and the depreciation of the Chilean Peso. Cash costs for silver were lower due to the lower cost allocation to silver
based on the relative production contribution between gold and silver during the period.
Minera Florida produced 49,923 ounces of gold and 247,036 ounces of silver in the first half of 2016, compared to 54,411
ounces of gold and 333,489 ounces of silver in the same period of 2015. Cash costs were $758 per ounce of gold and $9.67 per
ounce of silver in the first of 2016, compared to $739 per ounce of gold and $10.11 per ounce of silver in the same period of
2015.
Progress on reducing down time in the underground mine, in addition to the initiatives relating to the processing plant to
improve metal recoveries continued during the second quarter with the results of these efforts expected to be realized in the
second half of the year.
Jacobina, Brazil
Jacobina continued to exceed expectations in the second quarter with further improvements in production and costs. Consistent
with the mine plan, development and production from higher grade areas continued to advance. Jacobina is well positioned to meet
or exceed annual production expectations given the flexibility available to increase throughput and grade.
In the second quarter of 2016, Jacobina produced 29,002 ounces of gold, compared to 21,318 ounces of gold in the same quarter
of 2015. Cash costs were $714 per ounce of gold in the second quarter of 2016, compared to $988 per ounce of gold in the second
quarter of 2015.
Production in the second quarter of 2016 exceeded the second quarter of 2015 by 36% as the mine benefited from higher
throughout and feed grade. Cash costs in the second quarter were lower compared to the second quarter of 2015 by 28%, due to
higher production and the devaluation of the Brazilian Real, which also positively impacted the AISC.
Jacobina produced 58,972 ounces of gold in the first half of 2016, compared to 39,908 ounces of gold in the same period of
2015. Cash costs were $626 per ounce of gold in the first half of 2016, compared to $980 per ounce of gold in the same period of
2015.
Pilar, Brazil
Pilar had another record quarter for production in the second quarter of 2016, producing 22,806 ounces of gold, which is 7%
higher than the 21,237 ounces in the same period of 2015 and higher than the previous record in the first quarter of 2016. Higher
production was the result of the contribution of production from Maria Lazarus, which commenced production in August 2015, and
higher feed grades and recoveries. Pilar is on track to meet production guidance of 85,000 to 90,000 ounces in 2016.
Cash costs were $679 per ounce of gold in the second quarter of 2016, compared to $772 per ounce of gold in the second quarter
of 2015. Cash costs were favourably impacted by the higher production, feed grade and recoveries.
Pilar produced 44,654 ounces of gold in the first half of 2016, compared to 40,390 ounces of gold in the same period of 2015.
Cash costs were $656 per ounce of gold in the first half of 2016, compared to $804 per ounce of gold in the same period of
2015.
Fazenda Brasileiro, Brazil
At Fazenda Brasileiro, in the second quarter production was 21% higher and cash costs were 11% lower compared to the second
quarter of 2015. Fazenda Brasileiro produced a total of 16,873 ounces of gold, compared to 13,974 ounces of gold in the same
quarter of 2015. Cash costs were $726 per ounce of gold in the second quarter, compared to $820 per ounce of gold in the second
quarter of 2015. Improved production and cash costs in the quarter were the result of increased throughput, feed grades and
recoveries. Fazenda Brasileiro is on track to meet production guidance of 63,000 to 68,000 ounces in 2016.
Fazenda Brasileiro produced 35,397 ounces of gold in the first half of 2016, compared to 25,998 ounces of gold in the same
period of 2015. Cash costs were $627 per ounce of gold in the first half of 2016, compared to $824 per ounce of gold in the same
period of 2015.
Riacho dos Machados ("RDM"), Brazil
RDM is an open-pit gold mine with a CIL processing plant located in Minas Gerais State, Brazil. The project was acquired by
the Company through the acquisition of MRDM on April 29, 2016. Production from the closing date of the acquisition of April 29,
2016 to June 30, 2016 was 13,058 ounces of gold and co-product cash costs were $807 per ounce.
The Company believes that there is good potential to refine and improve the current RDM mining operation. Studies are
currently underway to fully explore opportunities for optimization of the asset. Among the efforts toward that optimization, a
water storage facility is planned to be built this year to allow for consistent and sustained production at RDM as the primary
constraint to full scale mine and plant operation is limited water availability. Current production is expected to be
approximately 55,000 ounces in 2016, with the portion attributable to the Company expected to be approximately 30,000 ounces.
The Company has two potential sources for obtaining water in 2017 and beyond. The first of which is the temporary pumping of
water from a nearby creek during the rainy season to existing water storage areas in the tailing impoundment to satisfy 2017
requirements, and the second is the construction of the permanent water dam and reservoir. The Company is advancing both options
concurrently and is considering the postponement of the construction of the water dam into 2017, which would defer required
capital of construction in 2016, thereby improving the cash flow of RDM for 2016. With the resolution of past water shortfalls,
production is expected to increase to an annual average of 100,000 ounces per year.
RDM increases the Company's production profile in a mining-friendly jurisdiction and is expected to contribute to cash flow
and net free cash flow. The acquisition provides mineral reserve growth and a mineral resource base with additional growth
potential. Updated future guidance will be provided early in 2017.
CONSTRUCTION AND DEVELOPMENT
Cerro Moro, Argentina
Cerro Moro is a high grade gold and silver deposit, currently in the development stage and with expected planned production in
early 2018. At which time, Cerro Moro will begin having a positive impact on the Company's cash flow.
Following the formal decision to proceed with the construction of Cerro Moro in 2015 and the updated project parameters with
respect to timing and capital investment, the 2016 work program includes the ramp-up of site construction activities, the
continuation of detailed engineering, as well as the advancement of underground mining in order to gain a better understanding of
in-situ mining conditions. The Company is controlling planned expenditures, which for 2016 are expected to be approximately $53
million leaving $224 million in total for 2017 and 2018, with the majority of the spend predominantly in 2017, which continues to
reflect the previously reported execution schedule. This approach allows for further exploration drilling in order to increase
the size of the Cerro Moro mineral resources, in addition to improving the current mineral resource categorization. The Company
believes that the Cerro Moro project also offers significant opportunities for the conversion of mineral resources into mineral
reserves and for further discoveries on the property. This will serve to significantly improve the returns and value from this
high grade project.
The Cerro Moro project contains a number of high grade epithermal gold and silver deposits, some of which will be mined via
open pit and some via underground mining. The feasibility study is based on annual production in the first three years of
approximately 150,000 ounces of gold and 7.2 million ounces of silver, with annual production averaging approximately 130,000
ounces of gold and 6.4 million ounces of silver over an initial 6 year mine life at a throughput of 1,000 tonnes per day. The
concentrator will consist of a standard crushing, grinding and flotation circuit with a counter current decantation and a Merrill
Crowe circuit included.
During the second quarter, the Company continued to show good progress on its development objectives. The Company has
completed 325 metres of total planned underground development for 2016 of 617 metres, which positions the Company ahead of
schedule providing additional time to develop the competency for underground mining in the local workforce. Ramp-up of site
construction continues safely with bulk earthworks nearing completion and the concrete contractor having mobilized to site.
Consistent with the base-line plan, detailed engineering progress is 73% complete and advancing to a target of 85% by the end of
the year. This increases the comfort level on the construction process and details related to the plant eliminating ambiguities
in construction schedule and potential delays. Procurement progress is also tracking well, upgrade of existing mine truck
facility advanced, and phase 2 construction camp installation as well as tailings dam design were concluded.
CANADIAN MALARTIC ODYSSEY EXPLORATION UPDATE
The Odyssey deposit is located approximately 1.5 kilometres east of the current limit of the Canadian Malartic open pit in
northwestern Quebec. The Canadian Malartic property is owned and operated by the Canadian Malartic General Partnership, in
which Yamana and Agnico Eagle Limited ("Agnico Eagle") each have an indirect 50% ownership interest. The Odyssey target
represents an entirely new mineralized structure that was not previously considered in the valuation when Canadian Malartic was
acquired.
Since the asset was acquired in June 2014, drilling and geologic understanding of the Odyssey deposit have advanced and
continue to support the potential of the deposit. The Odyssey deposit appears to have similarities to Agnico Eagle's Goldex
deposit in terms of grade and potential amenability to underground bulk mining. Additional drilling and economic studies are
on-going to better assess these opportunities.
An initial 2016 budget of C$8.0 million (on a 100% basis) was approved to conduct approximately 60,000 metres of drilling to
infill and expand the known mineralized zones on the Odyssey deposit. A supplemental budget increase of C$5.5 million (on a
100% basis) was recently approved, which will expand the total 2016 program to approximately 95,000 metres of core. To the
end of June, 53,417 metres in 57 holes have been completed, with nine core rigs currently active on site.
Odyssey Overview
The Odyssey zone is composed of multiple mineralized bodies spatially associated with a porphyritic intrusion, "Porphyry 12",
close to the contact of the Pontiac Group sediments and the Piché Group of volcanic rocks. They are grouped into two
elongated zones-the Odyssey North and Odyssey South zones-that strike east-southeast and dip steeply south. Odyssey North
has been traced from a depth of 600 to 1,300 metres below surface along a strike length of approximately 1.5
kilometres. Odyssey South has a strike length of 0.5 kilometres, and has been located between approximately 200 and 550
metres depth.
Gold occurs preferentially along lithological contacts but also within the porphyry. The Odyssey mineralization appears
to be controlled by structures associated with the Sladen Fault or its splay. The gold mineralization is associated with an
alteration halo of feldspar-hematite-sericite and local silica with 1-3% disseminated pyrite. Grades are in the range of 1.5
to 3.0 g/t gold, but higher grades are observed locally as coarse visible gold within quartz veins, stockwork and silicified
breccia zones.
Selected drill results and hole coordinates from 2014 to 2016 Odyssey drilling are highlighted in the tables
below. Drill hole collars are also shown on the Odyssey Deposit Local Geology Map. All intercepts reported for the
Odyssey project show capped grades over estimated true widths, based on a preliminary geological interpretation that is being
updated as new information becomes available with further drilling.
Recent exploration drill results from the Odyssey North and Odyssey South zones are presented in Table 1 below.
Table 1:
Drill hole |
Location |
From
(metres) |
To
(metres) |
Depth
of
midpoint
below
surface
(metres) |
Estimated
true
width
(metres) |
Gold
grade
(g/t)
(uncapped) |
Gold
grade
(g/t)
(capped)
* |
ODY11-2404*** |
North |
1,223.0 |
1,333.2 |
1,136 |
78.1 |
3.66 |
3.06 |
ODY14-2480 |
South |
546.0 |
587.7 |
480 |
41.1 |
2.55 |
2.55 |
ODY14-2480*** |
North |
1,111.0 |
1,124.5 |
936 |
10.6 |
4.64 |
4.64 |
ODY14-2480A |
North |
1,056.0 |
1,065.9 |
838 |
8.6 |
2.46 |
2.46 |
ODY14-2482*** |
North |
1,163.4 |
1,169.3 |
996 |
4.7 |
9.61 |
9.61 |
ODY14-2483*** |
North |
1,170.0 |
1,212.5 |
988 |
33.0 |
2.37 |
2.37 |
ODY14-2486*** |
North |
1,205.5 |
1,224.1 |
959 |
16.8 |
2.29 |
2.29 |
ODY14-2491BExt |
South |
518.9 |
533.8 |
471 |
14.6 |
5.44 |
5.44 |
and |
North |
1,165.7 |
1,185.0 |
1,034 |
13.6 |
1.60 |
1.60 |
ODY14-2492Ext |
North |
1,188.2 |
1,211.0 |
988 |
18.3 |
5.22 |
5.04 |
including |
|
1,196.6 |
1,204.7 |
|
6.5 |
10.22 |
9.73 |
ODY14-2493Ext |
North |
1,261.5 |
1,281.2 |
1,151 |
13.4 |
3.81 |
3.81 |
ODY15- 2494Ext |
North |
1,298.9 |
1,324.0 |
1,213 |
15.6 |
3.31 |
3.31 |
including |
|
1,308.4 |
1,315.8 |
|
4.6 |
6.92 |
6.92 |
ODY15-2495 |
South |
520.6 |
537.8 |
449 |
17.3 |
2.73 |
2.73 |
ODY15-2498 |
South Contact |
367.9 |
384.0 |
272 |
12.3 |
2.50 |
2.50 |
ODY15-2500 |
North |
1,148.5 |
1,157.8 |
998 |
7.3 |
2.16 |
2.16 |
ODY15-5003 |
South Contact |
344.8 |
360.4 |
292 |
13.4 |
2.28 |
2.28 |
ODY15-5004 |
North |
1,309.0 |
1,334.0 |
1,139 |
18.4 |
2.13 |
2.13 |
including |
|
1,319.5 |
1,328.2 |
|
6.4 |
3.73 |
3.73 |
ODY15-5007 |
North |
1,359.0 |
1,377.0 |
1,104 |
14.8 |
2.22 |
2.22 |
including |
|
1,368.9 |
1,375.5 |
|
5.4 |
4.62 |
4.62 |
ODY15-5008 |
South |
436.9 |
452.9 |
340 |
15.8 |
3.36 |
3.36 |
including |
|
436.9 |
445.4 |
|
8.4 |
4.62 |
4.62 |
ODY15-5010 |
North |
1,222.9 |
1,232.8 |
1,000 |
7.8 |
2.55 |
2.55 |
ODY15-5023 |
South |
529.0 |
547.5 |
410 |
17.5 |
1.63 |
1.63 |
ODY15-5024 |
North |
1,153.0 |
1,166.2 |
899 |
11.2 |
5.12 |
5.12 |
ODY15-5025 |
North |
1,129.3 |
1,144.5 |
936 |
12.2 |
2.25 |
2.25 |
ODY15-5026 |
South |
463.5 |
474.8 |
316 |
11.3** |
3.52 |
3.52 |
including |
|
466.0 |
474.8 |
|
8.8** |
4.13 |
4.13 |
ODY15-5029 |
North |
1,036.2 |
1,042.6 |
781 |
5.6 |
2.83 |
2.83 |
ODY16-5033 |
South |
473.9 |
491.5 |
427 |
17.6 |
1.50 |
1.50 |
ODY16-5039 |
North |
1,355.5 |
1,398.3 |
1138 |
33.5 |
2.63 |
2.63 |
including |
|
1,380.8 |
1,393.6 |
|
10.0 |
4.63 |
4.63 |
ODY16-5040A |
North |
1,236.8 |
1,268.0 |
1,018 |
27.7 |
1.93 |
1.93 |
including |
|
1,258.4 |
1,268.0 |
|
8.5 |
3.50 |
3.50 |
ODY16-5042 |
North |
995.5 |
1019.5 |
822 |
18.4 |
1.11 |
1.11 |
ODY16-5043 |
North |
1,380.0 |
1,388.0 |
1,236 |
5.4 |
3.40 |
3.40 |
ODY16-5044 |
North |
1,404.2 |
1,417.8 |
1,299 |
8.6 |
1.95 |
1.95 |
ODY16-5051 |
North |
1,260.2 |
1,285.5 |
1,135 |
17.8 |
1.76 |
1.76 |
ODY16-5054 |
North |
1,312.5 |
1,366.8 |
1,234 |
33.2 |
1.54 |
1.54 |
* |
Holes at the Odyssey deposit use a capping factor of 20 g/t gold. |
** |
True thickness not determined; these values are core length. |
*** |
Drill-hole results previously reported by former owners. Some were previously reported with different
grades and thicknesses. |
A local geology map is presented in Figure 1: http://media3.marketwire.com/docs/1064139fig1.pdf.
Odyssey North Zone
Three main mineralized areas have been outlined in the Odyssey North zone. The estimated true thickness of the
mineralized bodies varies from 5.0 to 35.0 metres, with local wider intercepts. Grades generally ranging from 1.5 to 3.0 g/t
gold. Additional drilling is currently underway to better define areas where mineralization appears to be more consistent
and displays better continuity.
Intercepts in the western, shallower part of the zone include hole ODY14-2482 that intersected 9.61 g/t gold over 4.7 metres
at 996 metres depth. Approximately 200 metres to the west, hole ODY14-2483 that intersected 2.37 g/t gold over 33.0 metres
at 988 metres depth. Other intercepts in this region were in holes ODY14-2480, ODY15-5024 and ODY16-5040A.
The central part of the zone is somewhat deeper. Intercepts in this area include hole extension ODY14-2492Ext that
intersected 5.04 g/t gold over 18.3 metres at 988 metres depth, including 9.73 g/t gold over 6.5 metres. Approximately 200
metres below this, hole extension ODY14-2493Ext intersected 3.81 g/t gold over 13.4 metres at 1,151 metres depth.
Intercepts in the deepest, eastern part of the zone include hole ODY16-5039 that intersected 2.63 g/t gold over 33.5 metres at
1,171 metres depth, including 4.63 g/t gold over 10.0 metres. Approximately 100 metres west of this, hole ODY16-5054
intersected 1.54 g/t gold over 33.2 metres at 1,234 metres depth. Other intercepts in this region are in holes ODY14-2494Ext
and ODY15-5004.
Odyssey South Zone
The Odyssey South zone is located at the southern contact of the upper portion of Porphyry 12, at depths varying from 200 to
550 metres. It ranges from 5.0 to 15.0 metres thick with grades from 1.5 to 5.0 g/t gold. It remains open to the east
along the south contact near the apex of the porphyry.
The Odyssey South zone extends eastward as shown by hole ODY14-2491BExt which intersected 5.44 g/t gold over 14.6 metres at a
depth of 471.0 metres. Approximately 300 metres east of this hole, ODY15-5008 returned 3.36 g/t gold over an estimated
thickness of 15.8 metres at 340.0 metres depth.
Second half 2016 Plans at Odyssey
Drilling will continue at the Odyssey deposit in the second half of 2016, with nine core rigs currently on site and a total of
approximately 41,500 metres planned. An initial Inferred Mineral Resource estimate for the Odyssey North zone is expected as
of year-end 2016.
SECOND QUARTER 2016 CONFERENCE CALL INFORMATION
The Company will host a conference call and webcast to discuss second quarter 2016 results on July 29, 2016 at 9:00 a.m.
ET.
Toll Free (North America): |
1-866-223-7781 |
Toronto Local and International: |
416-340-2218 |
Webcast: |
http://www.yamana.com/
|
|
|
Conference Call Replay: |
|
|
|
Toll Free (North America): |
1-800-408-3053 |
Toronto Local and International: |
905-694-9451 |
Passcode: |
1170048 |
The conference call replay will be available from 12:00 p.m. ET on July 29, 2016 until 11:59 p.m. ET on August 12, 2016.
For further information on the conference call or webcast, please contact the Investor Relations Department at investor@yamana.com or visit www.yamana.com.
Qualified Person
William Wulftange, P.Geo., Senior Vice President, Exploration for Yamana Gold Inc. has reviewed and confirmed the scientific
and technical information related to the Odyssey deposit contained within this news release and serves as the Qualified Person as
defined in National Instrument 43-101. He has also reviewed and verified that the technical information related to the
Odyssey deposit contained in this news release is accurate.
ABOUT YAMANA
Yamana is a Canadian-based gold producer with significant gold production, gold development stage properties, exploration
properties, and land positions throughout the Americas including Brazil, Argentina, Chile, Mexico and Canada. Yamana plans to
continue to build on this base through existing operating mine expansions, throughput increases, development of new mines, the
advancement of its exploration properties and, at times, by targeting other gold consolidation opportunities with a primary focus
in the Americas.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This news release contains or incorporates by reference
"forward-looking statements" and "forward-looking information" under applicable Canadian securities legislation within the
meaning of the United States Private Securities Litigation Reform Act of 1995. Forward-looking information includes, but is not
limited to information with respect to continued drilling at the Odyssey deposit, the Company's strategy, plans or future
financial or operating performance, the outcome of the legal matters involving the damages assessments and any related
enforcement proceedings. Forward-looking statements are characterized by words such as "plan," "expect", "budget", "target",
"project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions
"may" or "will" occur. Forward-looking statements are based on the opinions, assumptions and estimates of management considered
reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other
known and unknown factors that could cause actual events or results to differ materially from those projected in the
forward-looking statements.
These factors include the Company's expectations in connection with the production and exploration, development and expansion
plans at the Company's projects discussed herein being met, the impact of proposed optimizations at the Company's projects, the
impact of the proposed new mining law in Brazil, the new Chilean tax reform package, and the impact of general business and
economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and
liabilities based on projected future conditions, fluctuating metal prices (such as gold, copper, silver and zinc), currency
exchange rates (such as the Brazilian real, the Chilean peso, the Argentine peso and the Mexican peso versus the United States
dollar), the impact of inflation, possible variations in ore grade or recovery rates, changes in the Company's hedging program,
changes in accounting policies, changes in Mineral Resources and Mineral Reserves, risks related to asset disposition, risks
related to metal purchase agreements, risks related to acquisitions, changes in project parameters as plans continue to be
refined, changes in project development, construction, production and commissioning time frames, unanticipated costs and
expenses, higher prices for fuel, steel, power, labour and other consumables contributing to higher costs and general risks of
the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, final
pricing for concentrate sales, unanticipated results of future studies, seasonality and unanticipated weather changes, costs and
timing of the development of new deposits, success of exploration activities, permitting timelines, government regulation and the
risk of government expropriation or nationalization of mining operations, risks related to relying on local advisors and
consultants in foreign jurisdictions, environmental risks, unanticipated reclamation expenses, risks relating to joint venture
operations, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending and
outstanding litigation and labour disputes, risks related to enforcing legal rights in foreign jurisdictions, as well as those
risk factors discussed or referred to herein and in the Company's Annual Information Form filed with the securities regulatory
authorities in all provinces of Canada and available at www.sedar.com, and the
Company's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission. Although the
Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from
those described in forward-looking statements, there may be other factors that cause actions, events or results not to be
anticipated, estimated or intended.
There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking
statements if circumstances or management's estimates, assumptions or opinions should change, except as required by applicable
law. The reader is cautioned not to place undue reliance on forward-looking statements. The forward-looking information contained
herein is presented for the purpose of assisting investors in understanding the Company's expected financial and operational
performance and results as at and for the periods ended on the dates presented in the Company's plans and objectives and may not
be appropriate for other purposes.
NON-GAAP AND ADDITIONAL MEASURES
The Company has included certain non-GAAP measures including Cash costs per ounce of gold, Cash costs per ounce of silver,
Co-product cash costs per ounce of gold, Co-product cash costs per ounce of silver, Co-product cash
costs per pound of copper, All-in sustaining costs per ounce of gold, All-in sustaining costs per ounce of silver, All-in
sustaining co-product costs per ounce of gold, All-in sustaining co-product costs per ounce of silver, Adjusted earnings or loss,
Adjusted earnings or loss per share, Adjusted Operating Cash Flows, Net debt and Net free cash flow, to supplement its
Condensed Consolidated Interim Financial Statements, which are presented in accordance with IFRS. The term IFRS and
generally accepted accounting principles ("GAAP") are used interchangeably throughout this press release.
The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an
improved ability to evaluate the underlying performance of the Company. Non-GAAP measures do not have any standardized
meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The
data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of
performance prepared in accordance with IFRS. Management's determination of the components of non-GAAP and additional
measures are evaluated on a periodic basis influenced by new items and transactions, a review of investor uses and new
regulations as applicable. Any changes in to the measures are dully noted and retrospectively applied as applicable.
CASH COSTS AND ALL-IN SUSTAINING COSTS
For definitions and descriptions, refer to Section 14 of the Company's Annual Management Discussion and Analysis for the
year ended December 31, 2015.
Beginning January 1, 2016, the Company revised its definition of cash costs to include, in addition to mine site direct costs,
all previously un-allocated general and administrative expenses related to the mine site. Additionally, the Company has
excluded the impact from Alumbrera, the results of which are now considered negligible for performance measurement
purposes. Comparative balances have been restated accordingly to conform to the change in presentation adopted in the
current period.
ADJUSTED EARNINGS OR LOSS AND ADJUSTED EARNINGS OR LOSS PER SHARE
The Company uses the financial measures "Adjusted Earnings or Loss" and "Adjusted Earnings or Loss per share" to supplement
information in its Consolidated Annual Financial Statements. The Company believes that in addition to conventional measures
prepared in accordance with IFRS, the Company and certain investors and analysts use this information to evaluate the Company's
performance. The presentation of adjusted measures are not meant to be a substitute for Net Earnings or Loss or Net Earnings or
Loss per share presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS
measures. Adjusted Earnings or Loss and Adjusted Earnings or Loss per share are calculated as net earnings excluding
non-recurring items, items not related to or having a disproportionate effect on results for a particular periods and/or not
directly related to the core mining business such as (a) share-based payments and other compensation, (b) unrealized
foreign exchange (gains) losses related to revaluation of deferred income tax asset and liability on non-monetary items,
(c) unrealized foreign exchange (gains) losses related to other items, (d) unrealized (gains) losses on derivatives,
(e) impairment losses and reversals on mineral interests and other assets, (f) deferred income tax expense (recovery)
on the translation of foreign currency inter-corporate debt, (g) mark-to-market (gains)/losses on available-for-sale
securities and other assets, (h) one-time tax adjustments to historical deferred income tax balances relating to changes in
enacted tax rates, (i) reorganization costs, (j) non-recurring provisions, (k) (gains)/losses on sale of assets, (l) any other
non-recurring adjustments and the tax impact of any of these adjustments calculated at the statutory effective rate for the same
jurisdiction as the adjustment. Non-recurring adjustments from unusual events or circumstances are reviewed from time to
time based on materiality and the nature of the event or circumstance. Earnings adjustments for the comparative period reflect
both continuing and discontinued operations.
The terms "Adjusted Earnings or Loss" and "Adjusted Earnings or Loss per share" do not have a standardized meaning prescribed
by IFRS, and therefore the Company's definitions are unlikely to be comparable to similar measures presented by other
companies. Management uses these measures for internal valuation of the core mining performance for the period and to assist
with planning and forecasting of future operations. Management believes that the presentation of Adjusted Earnings or Loss and
Adjusted Earnings or Loss per share provide useful information to investors because they exclude non-recurring items, items not
related to or not indicative of current or future period's results and/or not directly related to the core mining business and
are a better indication of the Company's profitability from operations as evaluated by internal management and the board of
directors. The items excluded from the computation of Adjusted Earnings or Loss and Adjusted Earnings or Loss per share,
which are otherwise included in the determination of Net Earnings or Loss and Net Earnings or Loss per share prepared in
accordance with IFRS, are items that the Company does not consider to be meaningful in evaluating the Company's past financial
performance or the future prospects and may hinder a comparison of its period-to-period profitability.
Reconciliations of Adjusted Earnings to Net Earnings are provided in Section 5.1: Overview of Financial
Results of the MD&A for the three months ended June 30, 2016.
ADJUSTED OPERATING CASH FLOWS
For definitions and descriptions, refer to Section 14 of the Company's Annual Management Discussion and Analysis for the
year ended December 31, 2015.
Reconciliations of Adjusted Operating Cash Flows are provided in Section 5.1: Overview of Financial
Results of the MD&A for the three months ended June 30, 2016.
NET DEBT
The Company uses the financial measure "Net Debt" to supplement information in its Consolidated Financial Statements. The
Company believes that in addition to conventional measures prepared in accordance with IFRS, the Company and certain investors
and analysts use this information to evaluate the Company's performance. The presentation of Net Debt is not meant to be a
substitute for the debt information presented in accordance with IFRS, but rather should be evaluated in conjunction with such
IFRS measures. Net Debt is calculated as the sum of the current and non-current portions of long-term debt net of the cash
and cash equivalent balance as at the balance sheet date.
NET FREE CASH FLOW
The Company uses the financial measure "Net Free Cash Flow" to supplement information in its Consolidated Financial
Statements. The Company believes that in addition to conventional measures prepared in accordance with IFRS, the Company and
certain investors and analysts use this information to evaluate the Company's performance. The presentation of Net Free Cash
Flow is not meant to be a substitute for the cash flow information presented in accordance with IFRS, but rather should be
evaluated in conjunction with such IFRS measures. Other companies may define and calculate Net Free Cash Flow
differently. Net Free Cash Flow is calculated as cash flows from operating activities of continuing operations adjusted for
Advance payments pursuant to metal purchase agreements, non-discretionary expenditures from sustaining capital expenditures and
interest and financing expenses paid related to the current period. Reconciliations of Net Free Cash Flow are provided in
Section 3, Outlook and Strategy of the MD&A for the three months ended June 30, 2016.
ADDITIONAL MEASURES
The Company uses other financial measures the presentation of which is not meant to be a substitute for other subtotals or
totals presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. The
following other financial measures are used:
- Gross margin excluding depletion, depreciation and amortization - represents the amount of revenue in excess of
cost of sales excluding depletion, depreciation and amortization.
- Mine operating earnings - represents the amount of revenue in excess of cost of sales excluding depletion,
depreciation and amortization and depletion, depreciation and amortization.
- Operating earnings - represents the amount of earnings before net finance income/expense and income tax
recovery/expense.
- Cash flows from operating activities before net change in working capital - excludes the movement from
period-to-period in working capital items including trade and other receivables, other assets, inventories, trade and other
payables.
- Depletion, depreciation and amortization ("DDA") per ounce of gold and silver, and per pound of copper - is a
unitary measure of DD&A, based on ounces of gold and silver, and pound of copper sold to supplement the Company's
disclosure with respect to the performance of each of the operation mines.
- Realized price - is calculated based on total gross revenue divided by the total ounces sold which excludes
from sales, as applicable: unrealized gains and losses on non-hedge derivative contracts; unrealized mark-to-market gains and
losses on provisional pricing from copper and gold sales contracts; sales attributable to metal purchase arrangements;
treatment and refining charges; and export duties.
The terms described above do not have a standardized meaning prescribed by IFRS, and therefore the Company's definitions are
unlikely to be comparable to similar measures presented by other companies. The Company's management believes that their
presentation provides useful information to investors because gross margin excluding depletion, depreciation and amortization
excludes the non-cash operating cost item (i.e. depreciation, depletion and amortization), cash flows from operating activities
before net change in working capital excludes the movement in working capital items, mine operating earnings excludes expenses
not directly associate with commercial production and operating earnings excludes finance and tax related expenses and
income/recoveries. These, in management's view, provide useful information of the Company's cash flows from operating
activities and are considered to be meaningful in evaluating the Company's past financial performance or the future
prospects.