TORONTO, ONTARIO--(Marketwired - March 29, 2017) - Torex Gold Resources Inc. (the "Company" or "Torex")
(TSX:TXG) is pleased to announce a, CIM Definition Standards compliant, mineral resource estimate for its Sub-Sill deposit of
324,000 Inferred gold ounces and 89,000 Indicated gold ounces, at a cut-off grade of 2.5g/t Au. The Inferred resource is
contained in 1.33 million tonnes at an average Au grade of 7.58 g/t. The Indicated resource is contained in 353,000 tonnes
at an average Au grade of 7.82 g/t. The Sub-Sill deposit is located in close proximity to the Company's ELG processing plant
in Southwest Mexico and remains open in several directions.
Fred Stanford, President and CEO of Torex stated: "The Sub-Sill provides the potential to offer a material increase in the
near-term ounces produced through the ELG processing plant as a result of the high grade and the rapid advance of the planned 600
meter access ramp. The ramp is now less than 170 meters (4 m/d advance rate) from the anticipated contact with the skarn
rocks that host the Sub-Sill deposit. Mine planning is underway and the mine design effort will seek to pull production of
the highest-grade tonnes to as early in the mine plan as possible. It is worth noting that in the resource estimate there
are 147,000 Au ounces in 260,000 Inferred tonnes averaging 17.45 g/t Au, and 45,000 Au ounces in 90,000 Indicated tonnes
averaging 15.98 g/t Au." He added, "The Sub-Sill deposit also has the potential to increase in size. It remains open in
all directions, including at depth. The deposit, as currently defined, covers an area of approximately 22,000
m2. The prospective area to test for expansions of the deposit covers an area of approximately 1,000,000
m2, with additional potential at depth. In early Q2/17, the next phase of the Sub-Sill exploration diamond drill
program will begin. 15,000 meters of drilling are included in the program with an expectation that it will be completed over
the following 6 months. One objective of the drill program is increasing the drill density in 1,000,000 of the Inferred
tonnes to that required for the potential to upgrade to the Indicated confidence level. The drill program will also test the
deeper magnetic target, a patterned step-out drilling of an area of 90,000 m2, and a few distant step-out holes to
test the extents of the prospective area. Results from this program will be released as they are received and
interpreted."
|
Table 1.1 Sub-Sill Underground Resource |
Mineral Resource Statement, Sub-Sill Underground |
|
|
Tonnes
(Mt) |
Au Grade
(g/t) |
Ag Grade
(g/t) |
Cu Grade
(%) |
Contained
Au
(oz) |
Contained
Ag
(oz) |
Sub Sill |
|
|
|
|
|
|
Indicated |
0.35 |
7.82 |
6.25 |
0.27 |
89,000 |
71,000 |
Inferred |
1.33 |
7.58 |
11.46 |
0.60 |
324,000 |
490,000 |
Notes to accompany Sub Sill Underground Mineral Resource Table |
|
1. The estimate was prepared by Mark. P. Hertel, RM SME, an employee of MPH Consulting, who is a "Qualified
Person" under NI 43-101. |
2. The estimate has an effective date of February 24, 2017. |
3. Mineral Resources are classified in accordance with the 2014 CIM Definition Standards for Mineral
Resources and Mineral Reserves and the 2003 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice
Guidelines. |
4. Mineral Resources are reported above a 2.5 g/t Au cut-off grade. |
5. Mineral Resources are reported as undiluted; grades are contained grades. |
6. Sub Sill Resources contained within the conceptual pit shell have been removed from the El Limón Open Pit
Resources. |
7. Mineral Resources are reported using a long-term gold price of US$1380/oz, and silver price of
US$21.00/oz. |
8. The assumed mining method is from underground. |
9. Recoveries gold 87% and silver 25%. |
10. Rounding as required by reporting guidelines may result in apparent summation differences between
tonnes, grade, and contained metal content. |
|
Table 1.2 Sub-Sill Indicated Resource sensitivity to cut-off grade (base case
highlighted) |
Sub-Sill Indicated Resource |
|
Cutoff Au
(g/t) |
Tonnes
(Mt) |
Au Grade
(g/t) |
Ag Grade
(g/t) |
Cu Grade
(%) |
Contained
Au
(oz) |
Contained
Ag
(oz) |
2.00 |
0.42 |
6.94 |
5.73 |
0.25 |
93,000 |
77,000 |
2.50 |
0.35 |
7.82 |
6.25 |
0.27 |
89,000 |
71,000 |
5.00 |
0.21 |
10.88 |
8.23 |
0.37 |
72,000 |
55,000 |
10.00 |
0.09 |
15.98 |
10.23 |
0.49 |
45,000 |
29,000 |
|
Table 1.3 Sub-Sill Inferred Resource sensitivity to cut-off grade (base case
highlighted) |
Sub-Sill Inferred Resource |
|
Cutoff Au
(g/t) |
Tonnes
(Mt) |
Au Grade
(g/t) |
Ag Grade
(g/t) |
Cu Grade
(%) |
Contained
Au
(oz) |
Contained
Ag
(oz) |
2.00 |
1.56 |
6.79 |
10.54 |
0.54 |
341,000 |
528,000 |
2.50 |
1.33 |
7.58 |
11.46 |
0.60 |
324,000 |
490,000 |
5.00 |
0.77 |
10.50 |
13.71 |
0.79 |
260,000 |
339,000 |
10.00 |
0.26 |
17.45 |
16.21 |
0.93 |
147,000 |
136,000 |
The mineral resource estimates set out above have been prepared by Mr. Mark P. Hertel, who is a Qualified Person under NI
43-101.
Please refer to Figure 1 for a resource area map, Figure 2 for a long section of the prospect area and Figure 3 for a
representation of the access ramp underground development.
To view Figures 1-3, click on the following link: http://media3.marketwire.com/docs/1090087m.pdf
Sub-Sill Geology
The Sub-Sill deposit occurs at the south end of the El Limon deposit in the Mesozoic carbonate-rich Morelos Platform, which
has been intruded by Paleocene granodiorite stocks, sills and dikes. Skarn-hosted gold mineralization is developed along the
contacts of the intrusive rocks and the enclosing carbonate-rich sedimentary rocks. Gold mineralization at El Limon is
hosted in skarn developed in the Cuautla and Morelos formations immediately above a large granodiorite sill. At the Sub-Sill
area, multiple skarn zones have been recognized along the base of the granodiorite sill. The sill has a complex shape and is
interpreted to consist of two or more sills that emanate from the main body of granodiorite. The best developed skarn zones
at the base of the sill generally strike NE-SW and dip about 45° to the northwest. They host multiple horizons with high
grade gold mineralization that vary in strike length from approximately 50 meters up to 200 meters, with apparent widths varying
from 2 meters to 27 meters. The overall skarn body in the Sub-Sill area has a N-S to NE-SW trend that appears to connect to
previously recognized skarn and gold mineralization at the Limon Sur deposit 200 meters to the SW.
Mineralization at the Sub-Sill deposit is primarily gold, associated with variable contents of silver and copper. Gold occurs
in variably sulfidized pyrrhotite enriched skarn, while silver and copper mineralization is primarily determined by the degree of
sulfidation of the host skarn. Mineralization is associated with retrograde alteration characterized by amphibole, calcite and
quartz, with lessor amounts of chlorite ± epidote, affecting pyroxene-garnet exoskarn and granodiorite-related endoskarn. Locally
mineralization occurs in narrow lenses of massive sulfides.
Mineral Resource Estimate Methodology
Within the Sub-Sill project 44 drill holes (9,269 meters) support the mineral resource estimate. Assays were composited
into 2.5 meter lengths for estimation into 2.5 meter cubic blocks. MineSight® a commercially-available geologic modeling and mine
planning software package, was used to produce a three-dimensional block model. Specific gravity (SG) was assigned by rock
type from 107 wax immersion density determinations. Gold, silver and copper grades, within the Sub-Sill resource model, were
estimated using grade domains, defined from Probability Assigned Constrained Kriging (PACK) and lithologic codes. Ordinary
kriging was used to interpolate grade. Mineral Resources take into account geologic, mining, and processing constraints.
Mineral Resources are classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves
and the 2003 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines.
QA/QC and Qualified Persons
At the Morelos Gold Project, all of the El Limon Sub-Sill target analytical work is performed by SGS de Mexico S.A. de C.V.
("SGS") in Durango, Mexico and at SGS Mineral Services in Vancouver, British Columbia, Canada and ALS Chemex de Mexico S.A. de
C.V.
Sample preparation is done at SGS sample preparation laboratory in Durango, Mexico. The gold analyses (fire assay with an
atomic absorption or gravimetric finish) are completed at SGS analytical laboratory in Durango, Mexico and multi-element
geochemical analyses are Copper Sequential Leaching are completed at their analytical facilities in Vancouver, British Columbia,
Canada. Check assays samples are analyzed at ALS Chemex Vancouver, BC, Canada. SGS and ALS Chemex are independent of the
Company.
The Company has a Quality Assurance/Quality Control ("QA/QC") program in place that includes 5% of each of the certified
reference materials, blanks and field duplicates. 10% of pulp samples are analyzed at a second laboratory as part of the QA/QC
program to ensure the batch to batch relative bias remains constant and that absolute accuracy at anomalous to near cut-off
grades is measured and acceptable. The QA/QC program as designed has been approved by Bureau Veritas and is currently overseen by
Carlo Nasi, Chief Mine Geologist for the Morelos Gold Project.
The scientific and technical data contained in this news release pertaining to the Morelos Project has been reviewed and
approved by Mr. Mark P. Hertel, RM, SME, who is a Qualified Person under NI 43-101. Mr. Hertel is a Registered Member of the
Society for Mining, Metallurgy & Exploration, has experience relevant to the style of mineralization under consideration and is
an independent consultant, employed by MPH Consulting. Mr. Hertel has verified the data disclosed, including sampling,
analytical, and test data underlying the drill results and he consents to the inclusion in this release of said data in the form
and context in which it appears.
Additional information on the El Limon deposit and analytical labs is available in the Company's most recent annual
information form filed on SEDAR at www.sedar.com and the Company's website at
www.torexgold.com.
Step Out Drilling Program to Test Extension of the Sub-Sill Mineralization
The Company plans to conduct a drill program consisting of infill and step out drilling which will upgrade inferred resources,
test the extents and target the prospect areas to the north, south, west, east and at depth of the known resources. The
program is expected to start in Q2/17 and continue over six months. See Figure 1 for a plan view highlighting the resource and
prospect areas and Figure 2 for a long section of the prospect area.
The infill portion of the program consists of 7,100m on a 17.5mx17.5m drill spacing with a goal to upgrade 1,000,000 tonnes of
inferred resource to the indicated category.
The step out drilling consists of 6,500m on a 70mx70m drill spacing. The purpose of this program is to test the prospective
areas to the north, south, west and east of the known resource, in successive lines.
The step out drilling will also include 1,450m of drilling near the extents of the prospective area and at depth, to test the
high magnetic anomaly. The purpose of this drilling is to test prospective areas on trend with the known resource and at
depth.
About Torex
Torex is an emerging intermediate gold producer based in Canada, engaged in the exploration, development and operation of its
100% owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometers
southwest of Mexico City. Within this property, Torex has the El Limón Guajes Mine, which announced commercial production in
March of 2016 and the Media Luna Project, which is in an early stage of development and for which the Company issued a
preliminary economic assessment (PEA) in 2015. The property remains 75% unexplored.
CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS
This press release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable
Canadian securities legislation. Notwithstanding the Company's efforts, there can be no guarantee that the Company will not face
unforeseen delays or disruptions. Forward-looking information includes, without limitation, information with respect to
mineral resource estimates, the material increase in near term production, mine design, the potential increase in the size of the
Sub-Sill deposit, and the initial drill program at the Sub Sill prospecting area. Generally, forward-looking information can be
identified by the use of terminology such as "plans", "expects", "estimates", "intends", "anticipates", "believes" or variations
of such words, or statements that certain actions, events or results "may", "could", "would", "might", "will be taken", "occur"
or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that
may cause the Company's actual results, level of activity, performance or achievements to be materially different from those
expressed or implied by such forward-looking information, including, without limitation, risks related to the inability to
realize resource estimates at anticipated recovery levels or at all, assumptions underlying resource estimates being incorrect,
and those risk factors identified in the Company's annual information form and management's discussion and analysis.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light
of its experience and perception of trends, current conditions and expected developments, and other factors that management
believes are relevant and reasonable in the circumstances at the date such statements are made. Although the Company has
attempted to identify important factors that could cause actual results to differ materially from those contained in
forward-looking information, there may be other factors that cause results not to be as anticipated. There can be no assurance
that such information will prove to be accurate, as actual results and future events could differ materially from those
anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company
does not undertake to update any forward-looking information, except in accordance with applicable securities laws.