Atalaya Mining plc (AIM:ATYM, TSX:AYM), the European mining and development company, announces its operations update for the
three months ended June 30, 2017.
PROYECTO RIOTINTO
|
|
Second Quarter |
|
First Quarter |
|
Full year forecast |
|
2017 |
|
2016 |
|
2017 |
|
2017 |
Ore mined |
|
(M tonnes) |
|
2.3 |
|
1.3 |
|
2.3 |
|
9.5 - 9.8 |
Waste mined |
|
(M tonnes) |
|
4.6 |
|
3.8 |
|
4.3 |
|
18.1 - 18.2 |
Ore milled |
|
(M tonnes) |
|
2.2 |
|
1.3 |
|
2.2 |
|
9.5 |
Cu grade |
|
(%) |
|
0.49 |
|
0.44 |
|
0.48 |
|
0.49 - 0.51 |
Cu recovery |
|
(%) |
|
85.09 |
|
79.80 |
|
84.63 |
|
79 - 82 |
Cu production |
|
(tonnes) |
|
9,058 |
|
4,442 |
|
8,805 |
|
34,000 - 40,000 |
|
|
|
|
|
|
|
|
|
|
|
Production results at Proyecto Riotinto have improved compared to the previous quarter and were in line with targets for the
quarter ended June 30, 2017. The operation reports throughput rate of 2.2 million tonnes of ore processed, similar to the
previous quarter with an improvement in the recovery rate to a record of 85.09%. The overall tonnage processed was affected
negatively by the replacement of one of the main transformers to improve energy efficiencies. Full year forecasts for copper
production remain as previously guided at 34,000 - 40,000 tonnes.
Mining operations are running at an increasing rate quarter-on-quarter, as a result of adjusted drilling and blasting
parameters. On a combined basis, ore, waste and marginal ore amounted to 2.8 Mm3 in Q2 2017 versus 2.5 Mm3
in Q1 2017. The mining contractor has launched a replacement programme for the mining fleet. New loaders and trucks are expected
to be delivered to site over the next two quarters in anticipation of a potential increase in mining rates. Additionally,
modifications to the primary milling circuit, which includes a pebble crusher in closed circuit with the primary mill, have
already reported better milling efficiencies.
The Company continues to implement initiatives to reduce operating costs of the mine such as adding additional rougher
flotation capacity in order to increase plant recoveries and installing a partial plastic lining to parts of the tailings pond to
improve water recycle management.