VANCOUVER, Nov. 7, 2017 /CNW/ - SSR Mining Inc. (NASDAQ: SSRM) (TSX: SSRM) ("SSR
Mining") reports consolidated financial results for the third quarter ended September 30, 2017.
Paul Benson, President and CEO said, "Operationally this was a solid quarter as our portfolio
generated cash from operations of over $30 million which, combined with the proceeds of a partial
sale of our interest in Pretium, lifted our cash balance to $424 million. With strong performance
through the first nine months, we remain on track to meet our corporate-level annual guidance. Through the quarter we hit
milestones important for future growth with the release of the Seabee PEA, the commencement of the Marigold equipment replacement
study and ongoing positive exploration results, all of which were highlighted at our inaugural investor day."
Third Quarter 2017 Highlights:
(All figures are in U.S. dollars unless otherwise noted
- Increased cash position: Quarter-end cash increased to $424.0 million, up $70.5 million over the previous quarter, marking this as the eighth consecutive quarter of increased cash.
- Solid operating cash flow: Cash generated by operating activities totaled $30.3
million for the quarter and $99.6 million year-to-date.
- Net Income: Attributable net income for the quarter was $1.1 million, or $0.01 per share, with adjusted net income totaling $4.4 million, or
$0.04 per share.
- Delivered Seabee mine expansion plan: Seabee PEA evaluates sustained milling rate of 1,050 tonnes per day for a
seven-year mine life with average 100,000 ounces of gold per year, a 29% increase from 2016 production, at lower cash costs
over the period from 2018 to 2023.
- Strong operating performance at Seabee: Sustained daily throughput and recovery rates generated solid gold
production, positioning Seabee to achieve previously improved annual production and cash costs guidance.
- Record quarterly material moved at Marigold: Mined over 20 million tonnes of material at $1.52 per tonne during the quarter with ore stacked increasing to over 7 million tonnes.
- Puna Operations exceeds expectations: The Pirquitas mill operated at a rate of approximately 5,000 tonnes per day,
with higher than expected grades resulting in production of 1.5 million ounces of silver during the quarter and 5.0 million
ounces year-to-date, surpassing the lower end of annual production guidance. The operation is on track to achieve annual cash
costs guidance.
Marigold mine, U.S.
|
Three months ended
|
Operating data
|
September 30
2017
|
June 30
2017
|
March 31
2017
|
December 31
2016
|
September 30
2016
|
Total material mined (kt)
|
20,311
|
17,985
|
16,736
|
19,559
|
19,558
|
Waste removed (kt)
|
13,149
|
11,075
|
11,062
|
13,123
|
14,741
|
Total ore stacked (kt)
|
7,162
|
6,910
|
5,674
|
6,436
|
4,817
|
Strip ratio
|
1.8
|
1.6
|
1.9
|
2.0
|
3.1
|
Mining costs ($/t mined)
|
1.52
|
1.67
|
1.65
|
1.52
|
1.48
|
Gold stacked grade (g/t)
|
0.31
|
0.31
|
0.42
|
0.48
|
0.42
|
Processing costs ($/t processed)
|
0.89
|
0.82
|
0.89
|
0.80
|
0.95
|
Gold recovery (%)
|
72.0
|
73.0
|
74.0
|
75.0
|
71.0
|
General and admin costs ($/t processed)
|
0.40
|
0.42
|
0.52
|
0.46
|
0.56
|
|
|
|
|
Gold produced (oz)
|
38,699
|
55,558
|
55,215
|
59,945
|
47,456
|
Gold sold (oz)
|
38,818
|
57,426
|
52,528
|
61,308
|
47,278
|
|
|
|
|
Realized gold price ($/oz) (1)
|
1,270
|
1,265
|
1,214
|
1,247
|
1,330
|
|
|
|
|
Cash costs ($/oz) (1)
|
684
|
632
|
585
|
585
|
636
|
AISC ($/oz) (1)
|
979
|
833
|
799
|
835
|
1,139
|
|
|
|
|
Financial data ($000s)
|
|
|
|
Revenue
|
49,395
|
72,451
|
63,762
|
77,047
|
62,831
|
Income from mine operations
|
11,189
|
21,373
|
21,327
|
28,648
|
23,156
|
Capital expenditures
|
3,855
|
5,272
|
3,043
|
3,271
|
8,310
|
Capitalized stripping
|
6,056
|
4,350
|
6,745
|
10,171
|
13,787
|
Exploration expenditures (2)
|
1,130
|
1,538
|
1,024
|
1,276
|
1,145
|
|
|
(1)
|
We report the non-GAAP financial measures of realized gold prices,
cash costs and all-in sustaining costs ("AISC") per payable ounce of gold sold to manage and evaluate operating
performance at the Marigold mine. For a better understanding and a reconciliation of these measures to cost of sales, as
shown in our consolidated statements of comprehensive income (loss), please refer to "Non-GAAP and Additional GAAP
Financial Measures" in section 12 of our management's discussion and analysis of the financial position and results of
operation for the three and nine months ended September 30, 2017 ("MD&A").
|
(2)
|
Includes capitalized and expensed exploration expenses.
|
Mine production
In the third quarter of 2017, the Marigold mine produced 38,699 ounces of gold, 30.3% less than the previous quarter due to
lower grades of ore stacked as we began mining the upper benches of the current phase of the Mackay pit. Additionally, within
these upper benches more clay ore was encountered than anticipated which negatively impacted the leaching cycle as the solution
pumping rate was decreased to eliminate ponding in certain low permeability areas on the pads.
A quarterly record of 20.3 million tonnes of material was mined in the third quarter of 2017, 13% more than the second quarter
of 2017, primarily due to planned shorter hauls for waste. Approximately 7.2 million tonnes of ore were delivered to the heap
leach pads at an average gold grade of 0.31 g/t. This compares to 6.9 million tonnes of ore delivered to the heap leach pads at a
gold grade of 0.31 g/t in the second quarter of 2017. The strip ratio was 1.8:1 for the quarter, a 13% increase compared to the
previous quarter.
Mine operating costs
Cash costs and AISC per payable ounce of gold sold are non-GAAP financial measures. Please see "Cautionary Note Regarding
Non-GAAP Measures".
Cash costs, which include all costs of inventory, refining costs and royalties, of $684 per
payable ounce of gold sold in the third quarter of 2017 was 8% higher than the previous quarter due to the higher cost per ounce
placed on the leach pads as a result of continued lower grades mined. Total mining costs of $1.52
per tonne were 9% lower in the third quarter versus the second quarter due to more material mined as a result of shorter planned
waste hauls and higher availability of loading equipment. Processing unit costs were 9% higher in the third quarter of 2017 than
in the second quarter of 2017 due to increased reagent consumption as a result of increased barren solution flow and higher
tonnes stacked. General and administrative unit costs were 5% lower in the third quarter of 2017 than in the second quarter due
to the increase in tonnes stacked but were comparable on an absolute basis.
AISC of $979 per payable ounce of gold sold in the third quarter of 2017 increased from
$833 in the second quarter of 2017 predominantly due to higher cash costs and higher capital
expenditures, partially offset by lower exploration expenditures, over fewer ounces sold.
Mine sales
A total of 38,818 ounces of gold were sold at an average price of $1,270 per ounce during the
third quarter of 2017, compared to 57,426 ounces of gold sold at comparable average price of $1,265
per ounce during the second quarter of 2017.
Exploration
Exploration activities continued with the objective of Mineral Reserve growth in proximity to, and within, existing open pits.
During the third quarter of 2017, we completed 13,167 meters of drilling in 39 reverse circulation ("RC") holes at the Mackay
Pit, East Basalt, Valmy, Red Dot and North Red Dot targets. Total RC drilling to the end of the
third quarter amounts to 38,752 meters in 138 RC holes.
On September 5, 2017, we published exploration drill results for the period from April 1, 2017 to July 31, 2017. Since that period we have received further
positive assay results that should contribute to Mineral Resource addition at Red Dot, including drillhole MRA6517, which
intersected 47.2 meters at a grade of 0.79 g/t gold.
In the third quarter of 2017, we also received results that indicate a higher grade zone exists 200 meters west of our current
Mineral Resource pit at Red Dot. At our North Red Dot target, drillhole MRA6512 intersected 50.3 meters at a grade of 0.95 g/t
gold within an area currently modeled as narrow lower grade mineralization.
See in this news release Table 1 for selected exploration results, Table 3 for drill results and Table 4 for a list of all
drillholes completed for the relevant period.
Seabee Gold Operation, Canada
|
Three months ended
|
Operating data
|
September 30
2017
|
June 30
2017
|
March 31
2017
|
December 31
2016
|
September 30
2016
|
Total ore milled (t)
|
84,315
|
84,469
|
72,394
|
84,526
|
82,756
|
Ore milled per day (t/day)
|
916
|
928
|
804
|
919
|
900
|
Gold mill feed grade (g/t)
|
7.03
|
7.97
|
9.22
|
7.40
|
7.40
|
Mining costs ($/t mined)
|
74
|
60
|
68
|
62
|
58
|
Processing costs ($/t processed)
|
22
|
20
|
23
|
19
|
19
|
Gold recovery (%)
|
97.2
|
97.3
|
97.7
|
97.0
|
96.5
|
General and admin costs ($/t
processed)
|
53
|
50
|
59
|
44
|
37
|
|
|
|
|
Gold produced (oz)
|
18,058
|
20,690
|
21,023
|
19,711
|
20,142
|
Gold sold (oz)
|
21,798
|
17,909
|
22,411
|
17,229
|
21,911
|
|
|
|
|
Realized gold price ($/oz) (1)
|
1,269
|
1,257
|
1,233
|
1,230
|
1,334
|
|
|
|
|
Cash costs ($/oz) (1, 3)
|
634
|
592
|
574
|
595
|
661
|
AISC ($/oz) (1, 3)
|
775
|
831
|
990
|
833
|
841
|
|
|
|
|
Financial data ($000s)
|
|
|
|
Revenue
|
27,652
|
22,502
|
27,609
|
21,175
|
29,214
|
Income from mine operations
|
3,643
|
4,083
|
4,995
|
2,864
|
4,126
|
Capital expenditures
|
799
|
711
|
4,760
|
1,010
|
579
|
Capitalized development
|
1,314
|
2,165
|
2,514
|
2,432
|
2,141
|
Exploration expenditures (2)
|
1,253
|
1,566
|
1,953
|
829
|
1,206
|
|
|
(1)
|
We report the non-GAAP financial measures of realized gold prices, cash
costs and AISC per payable ounce of gold sold to manage and evaluate operating performance at the Seabee Gold Operation.
For a better understanding and a reconciliation of these measures to cost of sales, as shown in our consolidated
statements of comprehensive income (loss), please refer to "Non-GAAP and Additional GAAP Financial Measures" in section
12 of our MD&A.
|
(2)
|
Includes capitalized and expensed exploration expenses.
|
(3)
|
The non-GAAP financial measures of cash costs per payable ounce of gold
sold and AISC per payable ounce of gold sold from the Seabee Gold Operation were adjusted to eliminate the adjustment of
inventory to fair value as at the date of our acquisition of the Seabee Gold Operation.
|
Mine production
In the third quarter of 2017, the Seabee Gold Operation produced 18,058 ounces of gold, a strong result considering several
operating interruptions.
During the third quarter, 84,315 tonnes of ore were milled at an average gold grade of 7.03 g/t. This compares to a total of
84,469 tonnes of ore at an average grade of 7.97 g/t in the second quarter. The Santoy mine supplied 85% of ore milled,
predominantly from long hole stopes. Underground mining activities at Santoy experienced operating interruptions during the third
quarter as a result of forest-fire-related power outages and smoke ingress.
The mill achieved an average throughput of 916 tonnes per day during the quarter, 1.3% lower than the previous quarter due to
a combination of scheduled crusher maintenance activities and forest-fire-related power outages.
Mine operating costs
Cash costs and AISC per payable ounce of gold sold are non-GAAP financial measures. Please see "Cautionary Note Regarding
Non-GAAP Measures".
Cash costs per payable ounce of gold sold, which include all costs of inventory, refining costs and royalties, were
$634 in the third quarter of 2017, higher than the $592 in the second
quarter of 2017. Costs per tonne mined were $74 in the third quarter of 2017, 23% higher than in
the previous quarter due to the stronger Canadian dollar and less operating costs capitalized to underground development.
Processing and general and administration unit costs were higher by 10% and 6%, respectively, in the third quarter of 2017
compared to the second quarter of 2017, mainly due to the stronger Canadian dollar. The mill feed grade was 12% lower in the
current quarter than in the preceding period with lower production resulting in higher cash costs in the period.
AISC per payable ounce of gold sold were $775 in the third quarter of 2017, lower than the
$831 in the second quarter of 2017, primarily due to a higher volume of ounces sold in the third
quarter of 2017, but also due to lower underground capital development. Exploration spending in the period decreased due to lower
planned drilling through the warmer months of the year.
Mine sales
A total of 21,798 ounces of gold were sold at an average price of $1,269 per ounce during the
third quarter of 2017, higher than gold production as bullion inventory accumulated in the previous quarter was sold in the third
quarter. Gold sales were 22% higher than the 17,909 ounces of gold sold at an average price of $1,257 per ounce in the second quarter of 2017.
Exploration
Mineral Resource conversion remained the main exploration objective in the third quarter of 2017. During the period, we
completed 13,218 meters of underground drilling and 2,592 meters of surface drilling. Underground drilling was active at the
Santoy and Seabee mines with the majority of expenditures at Santoy.
Drilling at Santoy Gap in the third quarter has yielded several intercepts that extend the limits of the Mineral Resources,
including 2.4 meters at a grade of 14.77 g/t gold in drillhole SUG-17-050 and 1.3 meters at a grade of 14.39 g/t gold in
drillhole SUG-17-047 within the Santoy Gap 9B vein. Similarly, step out drilling on the Santoy 8A vein returned 2.1 meters at a
grade of 24.00 g/t gold in drillhole SUG-17-923. Drilling at the 8A target transects the Santoy 8A Footwall structural horizon
and an intercept outside the Mineral Resource returned 2.5 meters at a grade of 17.31 g/t gold in drillhole JOY-17-770. One
notable intercept was returned from the Gap Hanging Wall target including 2.2 meters at a grade of 9.91 g/t gold in the eastern
sector, as reported in our news release dated September 5, 2017. Highlights of infill drilling are
reported in Table 2 of this news release and drillhole collars are reported in Table 5 of this news release for the relevant
period.
Greenfields exploration at the Seabee Gold Operation included the completion of a soils grid in the area of the
Santoy mine. The results show the down-ice dispersion of anomalous gold values associated with the Santoy shear zone. We have
identified two additional anomalous areas for follow up.
At the Fisher property, where we have an option agreement with Eagle Plains Resources Ltd. to acquire up to an 80% interest on
the adjacent 34,000 hectares south of the Santoy mine, we completed our field program of prospecting, mapping, a drone magnetic
survey and geochemical surveying of soil and till. Prospecting results confirm two new gold showings 1.5 kilometers and 8.0
kilometers south of the Santoy mine. As previously reported, due to wildfire conditions in and around the Fisher project area,
exploration activities were suspended in August 2017. Our first drill campaign is planned for the
first quarter of 2018.
Puna Operations, Argentina (75% interest)
(Amounts presented on a 100% basis unless otherwise stated)
|
Three months ended
|
Operating data
|
September 30
2017
|
June 30
2017
|
March 31
2017
|
December 31
2016
|
September 30
2016
|
Ore milled (kt)
|
461
|
446
|
449
|
476
|
455
|
Silver mill feed grade (g/t)
|
153
|
185
|
145
|
194
|
264
|
Processing costs ($/t milled)
|
11.92
|
12.94
|
13.66
|
14.17
|
14.78
|
Silver recovery (%)
|
67.8
|
73.5
|
72.6
|
74.5
|
79.0
|
General and admin costs ($/t milled)
|
4.81
|
5.00
|
5.22
|
6.19
|
5.84
|
|
|
|
|
Silver produced ('000 oz)
|
1,541
|
1,947
|
1,520
|
2,210
|
3,047
|
Silver produced (attributable) ('000 oz) (1)
|
1,156
|
1,777
|
1,520
|
2,210
|
3,047
|
Silver sold ('000 oz)
|
2,076
|
1,655
|
1,443
|
2,633
|
2,947
|
Silver sold (attributable) ('000 oz) (1)
|
1,557
|
1,473
|
1,443
|
2,633
|
2,947
|
|
|
|
|
Realized silver price ($/oz) (2)
|
16.77
|
17.31
|
17.35
|
17.14
|
19.64
|
|
|
|
|
Cash costs ($/oz) (2)
|
12.76
|
12.15
|
12.68
|
9.80
|
8.48
|
AISC ($/oz) (2)
|
13.56
|
12.78
|
14.82
|
11.47
|
9.87
|
|
|
|
|
Financial Data ($000s)
|
|
|
|
Revenue
|
28,958
|
22,029
|
26,534
|
29,095
|
51,336
|
Income (loss) from mine operations
|
7,690
|
4,006
|
13,767
|
(4,056
|
31,908
|
Capital expenditures
|
1,006
|
420
|
2,261
|
3,467
|
3,158
|
Exploration expenditures (3)
|
—
|
—
|
—
|
11
|
7
|
|
|
(1)
|
Attributable production and sales figures for the third quarter of 2017
are on 75% attributable basis. Attributable production and sales figures for the second quarter of 2017 represent 100%
for April and May 2017 and 75% for June 2017.
|
(2)
|
We report the non-GAAP financial measures of cash costs per payable
ounce of silver sold, realized silver prices and AISC to manage and evaluate operating performance at Puna
Operations. For a better understanding and a reconciliation of these measures to cost of sales, as shown in our
consolidated statements of comprehensive income (loss), please refer to "Non-GAAP and Additional GAAP Financial Measures"
in section 12 of our MD&A.
|
(3)
|
Does not include exploration or development of the Chinchillas
project.
|
Mine production
During the first nine months of 2017, the operation produced a total of 5.0 million ounces of silver, surpassing the lower end
of our 2017 production guidance as stockpile grades and metallurgical performance continued to exceed plan. In the third quarter
of 2017, silver production from stockpiles totaled 1.5 million ounces. Attributable share of silver production in the third
quarter was 1.2 million ounces.
Ore was milled at an average rate of 5,012 tonnes per day in the third quarter, similar to the previous quarter. Ore milled in
the third quarter of 2017 contained an average silver grade of 153 g/t, 17% lower than the 185 g/t reported in the second quarter
of 2017 as we continue to process lower grade stockpiles. The average silver recovery in the third quarter was 67.8%, lower than
the previous quarter as expected due to planned lower silver mill feed grade.
Mine operating costs
Cash costs and AISC per payable ounce of silver sold are non-GAAP financial measures. Please see "Cautionary Note Regarding
Non-GAAP Measures".
Cash costs, which include cost of inventory, treatment and refining costs and, if applicable, by-product credits, increased by
5% to $12.76 per payable ounce of silver sold in the third quarter of 2017 from $12.15 per payable ounce of silver sold in the second quarter of 2017, principally due to lower production
resulting from lower silver grades of the stockpiled ore processed. In the third quarter of 2017, the stockpile inventory costs
include approximately $5.20 per payable ounce of inventory costs that were previously incurred.
AISC of $13.56 per payable ounce of silver sold were 6% higher in the third quarter of 2017 than
the $12.78 per payable ounce of silver sold in the second quarter of 2017 due to higher cash costs
and higher sustaining capital expenditure per payable ounce of silver sold resulting from timing of maintenance activities.
Mine sales
We recognized sales of 2.1 million ounces of silver at an average price of $16.77 per ounce in
the third quarter of 2017, higher than the 1.7 million ounces at an average price of $17.31 per
ounce in the second quarter of 2017, as a result of sales of current period production and selling down inventory that
accumulated during the previous quarter. Attributable sales were 1.6 million ounces of silver in the third quarter of 2017,
marginally higher than the 1.5 million ounces in the previous quarter.
Chinchillas project, Argentina
Since the initiation of development activities in June 2017, project execution is well under way
with purchase commitments made on critical long lead equipment including a geodesic stockpile cover, tailings and reclaim water
pumps, piping, pre-fabricated electrical rooms and all mining and supporting mobile equipment.
Construction contracts have been issued for tender and, conditional upon receipts of permits, will be awarded in the fourth
quarter of 2017. These contracts include concrete and earthworks and general electromechanical installation at Pirquitas,
and infrastructure buildings at Chinchillas, including administration buildings, truck shop, diesel and explosives storage and
distribution systems. The pre-stripping operations plan has been completed with detailed mine planning ongoing by the Puna
Operations technical services team.
The project is awaiting environmental, operating and construction permit approvals, which are expected in the fourth quarter.
Project planning and execution, based on such permit expectations, supports first ore feed to the Pirquitas mill in the second
half of 2018.
Other Projects
SIB project, Canada
During the third quarter of 2017, we completed 9,336 meters of diamond drilling in 12 holes at the SIB exploration project
located near the high-grade, past-producing Eskay Creek mine in northwest British Columbia. We hold a three-year option to acquire up to a 60% undivided interest in the project and
have met the first year spending requirement of C$3.7 million.
The exploration target is precious metal enriched volcanogenic massive sulphides, and the SIB project boasts the only
mineralization similar to Eskay Creek in the district. At the SIB project, previous work has
defined a near surface zone of high grade gold-silver bearing massive sulphide mineralization. Our 2017 exploration program aims
to identify extensions to this precious metal enriched massive sulphide zone. All the drillholes of the program encountered the
targeted Salmon River formation geology over a strike length of at least 1,100 meters to a
maximum depth of 700 meters below surface. Polymetallic vein sulphides over 10 meters and pyritic vein breccia has been
intercepted in two holes in what are interpreted to be altered rocks footwall to the main targeted mafic to felsic volcanic
contact. These zones of mineralization have returned weakly anomalous base and precious metal values. Analytical results
are pending for seven of the twelve holes. Downhole geophysical surveys have been completed on all the drillholes.
Once all the assay results and geophysical interpretations have been received, we will review and determine our next steps for
the project.
Outlook
This section of the news release provides management's production and cost estimates. See "Cautionary Note Regarding
Forward-Looking Statements."
We expect our total production to be within our previously improved annual production guidance as a result of strong results
at the Seabee Gold Operation and Puna Operations, offset by lower production results at the Marigold mine. Production guidance at
Marigold has been reduced by 10,000 ounces and is now expected to be between 195,000 and 205,000 ounces of gold. This change
reflects third quarter gold production, lower pumping rates to the leach pads in the third and fourth quarters due to higher clay
content, and the subsequent fourth quarter incident at Marigold mine. Within the current phase of the Mackay pit, more ore tonnes
and gold ounces have been encountered, however, the majority of these incremental tonnes have been of a clay nature. Blending of
these clay ores with rock ores is required as they are loaded on the leach pads to improve permeability and rate of recovery and
this has been and will be an increased focus for the operation through the fourth quarter. While these incremental tonnes and
gold ounces encountered are longer term positive, these operating impacts have reduced near term production. Mining of higher
clay ore is expected through to the end of the first quarter of 2018.
Due to positive cost performance at all three operations throughout the year and enhanced production results at both the
Seabee Gold Operation and Puna Operations, we expect our corporate cash cost per payable ounce sold to remain within the
previously reduced guidance range.
As previously disclosed, the Marigold mine was shut down due to an incident on October 31, which
resulted in the fatality of two of our employees. The Mine Safety and Health Administration ("MSHA") is conducting an
investigation. MSHA has now removed restrictions allowing the restart of operations. After management site reviews, open pit
operations have resumed and are in sequential ramp up as crews return to the mine and complete incident and operational
briefings. Mine operations were fully or partially suspended for six days and the mine is expected to resume full operations over
the next several days.
Revised Operating Guidance
|
|
Marigold mine
|
Seabee Gold Operation
|
Puna Operations
(75% interest) (3)
|
Gold Production
|
oz
|
195,000 - 205,000
|
75,000 - 85,000
|
—
|
Silver Production
|
Moz
|
—
|
—
|
5.0 - 6.0
|
Cash Costs per Payable Ounce Sold (1)
|
$/oz
|
640 - 670
|
575 - 625
|
12.50 - 14.00
|
Capital Expenditures
|
$M
|
30
|
8
|
5
|
Capitalized Stripping / Capitalized
Development
|
$M
|
20
|
11
|
—
|
Exploration Expenditures (2)
|
$M
|
5
|
5
|
—
|
|
|
(1)
|
We report the non-GAAP financial measure of cash costs per payable ounce
of gold and silver sold to manage and evaluate operating performance at the Marigold mine, the Seabee Gold Operation and
Puna Operations. See "Cautionary Note Regarding Non-GAAP Measures".
|
(2)
|
Includes capitalized and expensed exploration expenses.
|
(3)
|
Shown on a 100% basis.
|
Consolidated Financial Summary
Selected Financial Data (1)
|
|
|
|
Three months ended September 30
|
Nine months ended September 30
|
|
2017
|
2016
|
2017
|
2016
|
|
$
|
$
|
$
|
$
|
Revenue
|
106,005
|
143,381
|
340,892
|
363,669
|
Income from mine operations
|
22,522
|
59,190
|
92,073
|
126,550
|
Operating income
|
10,393
|
50,248
|
81,395
|
89,099
|
Net income
|
1,821
|
38,042
|
54,616
|
52,825
|
Basic attributable income per share
|
0.01
|
0.32
|
0.45
|
0.54
|
Adjusted attributable income before
tax (2)
|
4,252
|
45,168
|
42,739
|
83,996
|
Adjusted attributable net income (2)
|
4,387
|
37,214
|
37,213
|
69,405
|
Adjusted basic attributable income
per share (2)
|
0.04
|
0.31
|
0.31
|
0.71
|
Cash generated by operating
activities
|
30,292
|
53,066
|
99,550
|
96,554
|
Cash generated by (used in)
investing activities
|
38,570
|
(10,581)
|
(5,861)
|
(19,222)
|
Cash generated by (used in)
financing activities
|
1,774
|
2,599
|
2,659
|
(11,400)
|
|
|
|
Financial Position
|
|
September 30,
2017
|
December 31,
2016
|
Cash and cash equivalents
|
|
424,025
|
327,127
|
Marketable securities
|
|
109,721
|
148,944
|
Current assets (including cash and
cash equivalents)
|
|
756,731
|
704,240
|
Current liabilities
|
|
72,654
|
144,306
|
Working capital (2)
|
|
684,077
|
559,934
|
Total assets
|
|
1,499,220
|
1,438,688
|
|
|
(1)
|
All values are presented in thousands of U.S. dollars, except per share
amounts.
|
(2)
|
We report non-GAAP measures including adjusted attributable income
before- and after-tax, adjusted basic attributable income per share attributable to our shareholders and working
capital to manage and evaluate our operating performance. Please see "Cautionary Note Regarding Non-GAAP
Measures".
|
Quarterly financial summary
As a result of lower sales and lower average prices for both gold and silver, consolidated quarterly revenue decreased by 26%
relative to the comparative quarter. We sold 18% less payable ounces of gold from the Marigold mine compared to the same quarter
of 2016 as Marigold production declined as expected due to lower grades of the pit phases mined through the third quarter of
2017. Seabee Gold Operation production was impacted by forest fires in the third quarter of 2017 which caused intermittent power
and mine operations interruptions. Despite this, sales were unchanged compared to the same quarter of 2016 due to selling down of
inventories. Due to the planned lower production from processing stockpiles at Puna Operations, 30% less ounces of silver were
sold relative to the comparative period in 2016.
Income from mine operations in the third quarter of 2017 generated a gross margin of 21%, lower than the 41% margin in the
third quarter of 2016. This was due to higher cost of sales at Puna Operations where we are processing stockpiles, and due to
higher unit costs at both the Marigold mine and the Seabee Gold Operation, as a result of lower grades and higher depreciation
and depletion, respectively, in addition to lower realized prices per ounce of gold and silver sold. Net income for the third
quarter of 2017 of $1.8 million was lower than the comparative quarter due to lower income from
mine operations and higher general and administrative and exploration expenses.
Cash generated by operating activities decreased to $30.3 million compared to $53.1 million in the third quarter of 2016. Lower production at the Marigold mine and Puna Operations resulted
in lower volumes of gold and silver sold at higher unit costs, which generated lower cash from operating activities. We generated
$38.6 million from investing activities in the third quarter of 2017 compared to $10.6 million used in the third quarter of 2016, mainly due to the sale of common shares of Pretium Resources
Inc. ("Pretium"). In the third quarter of 2017, our investment in property, plant and equipment was $16.2
million, compared to $28.0 million in the comparative quarter of 2016. The $11.8 million reduction was principally due to $7.7 million lower capitalized
stripping at Marigold and $3.2 million lower investment in plant and equipment, partially offset by
$0.8 million lower investment in underground development at the Seabee Gold Operation.
Year-to-date financial summary
The 6% decrease in revenue compared to the nine months of 2016 was due to 39% lower ounces of silver sold, as a result of
planned processing of lower grade stockpiles at Puna Operations, at comparable realized prices, partially offset by a 20%
increase in gold ounces sold, although at 2% lower prices. The increase in gold ounces sold was largely due to sales from the
Seabee Gold Operation, which we acquired in May 2016.
Income from mine operations in the nine months ended September 30, 2017, generated a gross
margin of 27%, lower than the 35% margin in the nine months ended September 30, 2016, as lower
precious metals prices, lower sales of silver, and higher cost of sales at the Marigold mine were only partially offset by lower
cost of sales at Puna Operations and the addition of the Seabee Gold Operation. In the nine months ended September 30, 2017, the resolution of our export duty claim in Argentina
resulted in a $4.3 million reduction to cost of sales. Net income for the first nine months of 2017
was also positively impacted by an impairment reversal of the Pirquitas plant of $24.4 million
resulting from its operating life extension following the formation of Puna Operations.
Cash generated by operating activities was $99.6 million, compared to $96.6 million in the nine months ended September 30, 2016. Higher volumes of gold
sold, albeit at slightly higher unit costs, generated higher cash from operating activities before interest and taxes. In the
nine months ended September 30, 2017, we paid $12.6 million of
principal and interest under the terms of the tax moratorium system in Argentina into which we
entered on March 31, 2017. We used $5.9 million in investing
activities in the nine months ended September 30, 2017, compared to $19.2
million in the comparative period of 2016. This was mainly due to the proceeds of $54.2
million from disposal of a portion of our common shares of Pretium, which was offset by the Chinchillas project option
exercise payment of $13.0 million in the current period compared to the receipt of $16.9 million of cash as part of the acquisition of the Seabee Gold Operation in the prior period. Investment
in plant and equipment was lower by $6.4 million and we invested less in capitalized stripping at
the Marigold mine by $5.3 million but more in underground development at the Seabee Gold Operation
by $3.1 million in the year to date than in the comparative period of 2016. In the nine months
ended September 30, 2016, we also repaid $17.6 million of bank
loans.
Corporate summary
Effective August 1, 2017, we changed our name to SSR Mining Inc. from Silver Standard Resources
Inc. to better reflect our business focus as a precious metals producer.
On September 7, 2017, we reported positive results of a Preliminary Economic Assessment ("PEA")
for the Seabee Gold Operation which provides a mine expansion scenario. The PEA contemplates near-term production growth, extends
production to 2024, expands operating margins and improves processing plant performance while requiring low capital investment.
We filed a technical report titled "NI 43-101 Technical Report for the Seabee Gold Operation, Saskatchewan, Canada" in support of the PEA, which is available on SEDAR at www.sedar.com and on our website. The PEA is preliminary in nature and includes Inferred Mineral Resources
that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be
categorized as Mineral Reserves, and there is no certainty that the PEA will be realized. Mineral Resources that are not Mineral
Reserves do not have demonstrated economic viability.
In the third quarter of 2017, we sold 6.4 million common shares of Pretium, realizing pre-tax cash proceeds
of C$67.5 million. Subsequent to the quarter end, we sold an additional 1.5 million Pretium shares, realizing pre-tax
cash proceeds of C$17.8 million. We currently hold 9.04 million common shares, representing
approximately 4.99% of Pretium.
Third Quarter 2017 Selected Drill Results
Table 1. Third Quarter 2017 Selected Drill Results at the Marigold mine, Nevada, U.S.
Hole ID
|
UTM-N
(Nad27
Zone11)
|
UTM-E
(Nad27
Zone11)
|
Elevation
(masl)
|
From
(meters)
|
To
(meters)
|
Width
(meters)
|
Gold
Grade
(g/ tonne)
|
Area
|
MRA6512
|
4508157
|
484800
|
1579
|
301.8
|
352.0
|
50.3
|
0.95
|
North Red
Dot
|
including
|
|
|
|
306.4
|
313.9
|
7.6
|
3.63
|
North Red
Dot
|
MRA6517
|
4507274
|
485067
|
1604
|
269.7
|
317.0
|
47.2
|
0.79
|
Red Dot
|
|
Note: See Table 3 and Table 4 in this news release for a list of all
drillholes completed for the period from August 1, 2017 to September 30, 2017.
|
Table 2. Third Quarter 2017 Selected Drill Results at the Seabee Gold Operation, Saskatchewan,
Canada.
Hole ID
|
From
(meters)
|
To
(meters)
|
Mine E
(midpoint)1
|
Mine N
(midpoint)1
|
Elevation
(midpoint)1
|
Gold
Grade
(g/ tonne)
|
Ture Width
(meters)
|
Area
|
SUG-17-046
|
188.4
|
191.0
|
3620.4
|
4982.4
|
-421.5
|
21.66
|
1.21
|
9C
|
SUG-17-048
|
185.0
|
196.6
|
3627.0
|
4969.4
|
-417.9
|
3.47
|
6.09
|
9A
|
SUG-17-049
|
142.9
|
148.4
|
3673.7
|
4992.2
|
-433.1
|
5.94
|
3.47
|
9C
|
SUG-17-050
|
132.5
|
136.0
|
3692.5
|
4997.4
|
-444.9
|
8.15
|
2.58
|
9C
|
SUG-17-052
|
229.1
|
231.0
|
3612.9
|
4921.1
|
-378.3
|
27.28
|
0.84
|
9A
|
SUG-17-922
|
317.4
|
320.7
|
4541.2
|
5181.4
|
-479.5
|
6.67
|
2.41
|
8A
|
SUG-17-923
|
468.4
|
473.3
|
4525.0
|
5325.2
|
-605.9
|
24.00
|
2.14
|
8A
|
|
Notes: Drillholes presented in this table have gram-meter value greater
than 15. See Table 5 in this news release for a list of all drillholes completed for the period from August 1, 2017
to September 30, 2017.
|
1 Midpoints of the intercept determined where mineralized
structure intersected.
|
2 Gold values cut to 75 g/t.
|
Sampling and Analytical Procedures
All drill samples in respect of the Marigold mine drilling program are sent for processing and analysis to the offices of
American Assay Laboratories, Inc. ("AAL") in Sparks, Nevada which is an ISO 17025 accredited
laboratory independent from SSR Mining. Fire assay is completed on a 30-gram sample (AAL method code FA-PB30-ICP) with an
Inductively Coupled Plasma ("ICP") finish after a two acid digestion. Samples with assay results greater than 10 g/t gold
are fire assayed on a 30-gram sample (AAL method code Grav Au30) with a gravimetric finish. We employ a rigorous Quality
Assurance/Quality Control ("QA/QC") program, which includes real-time assay quality monitoring through the regular insertion of
blanks, duplicates, and certified reference material, as well as reviewing laboratory-provided QA/QC data.
All drill samples in respect of the Seabee Gold Operation drilling program are assayed by our onsite non-accredited assay
laboratory, which is not independent from SSR Mining. Duplicate check assays are conducted at site as well as at TSL Laboratories
Inc. in Saskatoon, Saskatchewan, which is independent from SSR Mining. Results of the spot
checks were consistent with those reported. Sampling interval is established by minimum or maximum sampling lengths and
geological and/or structural criteria. Two hundred gram samples are pulverized until greater than 80 percent passes through 150
mesh screen. Thirty-gram pulp samples are then analyzed for gold by fire assay with gravimetric finish (0.01 grams per tonne
detection limit).
Qualified Persons
The scientific and technical information contained in this news release relating to the Marigold mine has been reviewed and
approved by Thomas Rice and James N. Carver, each of whom is a SME
Registered Member and a Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects
("NI 43-101"). Mr. Rice is our Technical Services Manager and Mr. Carver is our Chief Geologist at the Marigold mine. The
scientific and technical data contained in this news release relating to the Seabee Gold Operation has been reviewed and approved
by Cameron Chapman, P.Eng., and Jeffrey Kulas, P. Geo., each of
whom is a Qualified Person under NI 43-101. Mr. Chapman is our General Manager and Mr. Kulas is our Manager Geology, Mining
Operations at the Seabee Gold Operation. The scientific and technical information contained in this news release relating to Puna
Operations has been reviewed and approved by Bruce Butcher, P.Eng., and F.
Carl Edmunds, P. Geo., each of whom is a Qualified Person under NI 43-101. Mr. Butcher is our Director, Mine Planning and Mr. Edmunds is our Chief Geologist.
Management Discussion & Analysis and Conference Call
This news release should be read in conjunction with our unaudited condensed consolidated interim financial statements and our
MD&A as filed with the Canadian Securities Administrators and available at www.sedar.com or our website at www.ssrmining.com .
- Conference call and webcast: Wednesday, November 8, 2017, at 11:00
a.m. EST.
- The conference call will be archived and available on our website.
Audio replay will be available for two weeks by calling:
Toll-free in U.S. and Canada:
|
+1 (855) 669-9658, replay code 1719
|
All other callers:
|
+1 (412) 317-0088, replay code 1719
|
About SSR Mining
SSR Mining, formerly Silver Standard Resources Inc., is a Canadian-based precious metals producer with three operations,
including the Marigold gold mine in Nevada, U.S., the Seabee Gold Operation in Saskatchewan, Canada and the 75%-owned and operated Puna Operations joint venture in Jujuy, Argentina. We also have two feasibility stage projects and a portfolio of exploration properties in North
and South America. We are committed to delivering safe production through relentless emphasis on
Operational Excellence. We are also focused on growing production and Mineral Reserves through the exploration and acquisition of
assets for accretive growth, while maintaining financial strength.
For further information contact:
W. John DeCooman, Jr.
Vice President, Business Development and Strategy
SSR Mining Inc.
Vancouver, BC
Toll free: +1 (888) 338-0046
All others: +1 (604) 689-3846
E-Mail: invest@ssrmining.com
To receive SSR Mining's news releases by e-mail, please register using the SSR Mining website at www.ssrmining.com.
Table 3. Drill Results at the Marigold mine, Nevada, U.S for the Period from August 1, 2017 to September 30, 2017.
Hole ID
|
From (meters)
|
To (meters)
|
Width
(meters)
|
Gold Grade
(g/tonne)
|
Area
|
MR6496
|
173.7
|
259.1
|
85.3
|
0.28
|
Valmy
|
(including)
|
196.6
|
204.2
|
7.6
|
1.16
|
|
MRA6508
|
303.3
|
342.9
|
39.6
|
0.71
|
Mackay Pit
|
(including)
|
303.3
|
307.8
|
4.6
|
3.86
|
|
MRA6510
|
374.9
|
408.4
|
33.5
|
0.64
|
North Red Dot
|
(including)
|
405.4
|
408.4
|
3.0
|
5.75
|
|
MRA6512
|
301.8
|
352.0
|
50.3
|
0.95
|
North Red Dot
|
(including)
|
306.3
|
313.9
|
7.6
|
3.63
|
|
(including)
|
339.9
|
342.9
|
3.0
|
1.17
|
|
MR6515
|
172.2
|
210.3
|
38.1
|
0.71
|
Valmy
|
(including)
|
172.2
|
178.3
|
6.1
|
1.38
|
|
(including)
|
192.0
|
204.2
|
12.2
|
1.11
|
|
and
|
231.6
|
268.2
|
36.6
|
0.70
|
|
(including)
|
253.0
|
262.1
|
9.1
|
1.92
|
|
MR6517
|
269.7
|
317.0
|
47.2
|
0.79
|
Mackay Pit
|
(including)
|
274.3
|
281.9
|
7.6
|
3.26
|
|
MRA6523
|
262.1
|
283.5
|
21.3
|
1.85
|
Mackay Pit
|
(including)
|
263.7
|
278.9
|
15.2
|
2.51
|
|
MRA6526
|
243.8
|
259.1
|
15.2
|
1.55
|
Mackay Pit
|
(including)
|
245.4
|
256.0
|
10.7
|
2.07
|
|
MR6540
|
195.1
|
216.4
|
21.3
|
1.49
|
Valmy
|
(including)
|
195.1
|
204.2
|
9.1
|
2.97
|
|
|
Notes: Width in meters represents downhole intersected length, which may
or may not be a true thickness of the mineralization. Drillholes presented in this table have gram-meter value greater
than 20. The drillhole collars table (see Table 4) provides information if the drillhole has a Mineral Resource intercept
of six meters at 0.3 g/t gold. "Width" may not equal the difference between "From" and "To" due to rounding.
|
Table 4. Drillhole collars from the exploration drill programs at the Marigold mine, Nevada,
U.S. for the Period from August 1, 2017 to September 30,
2017.
HOLE ID
|
UTM-N
(Nad27
Zone11)
|
UTM-E
(Nad27
Zone11)
|
Elevation
(masl)
|
Azimuth
(deg.)
|
Dip
(deg.)
|
Length
(meters)
|
Area
|
MR6496
|
4504346
|
487089
|
1926
|
120
|
-89
|
367
|
Valmy
|
MRA6508
|
4507547
|
485065
|
1590
|
84
|
-69
|
343
|
Mackay Pit
|
MRA6509
|
4508072
|
484747
|
1586
|
87
|
-70
|
428
|
North Red Dot
|
MRA6510
|
4508035
|
484765
|
1589
|
90
|
-75
|
428
|
North Red Dot
|
MRA6511
|
4508127
|
484793
|
1580
|
90
|
-74
|
428
|
North Red Dot
|
MRA6512
|
4508157
|
484800
|
1579
|
91
|
-74
|
428
|
North Red Dot
|
MR6514
|
4504347
|
487140
|
1924
|
225
|
-90
|
396
|
Valmy
|
MR6515
|
4504348
|
487116
|
1925
|
127
|
-89
|
379
|
Valmy
|
MR6516
|
4504316
|
487085
|
1940
|
346
|
-90
|
386
|
Valmy
|
MR6517
|
4507274
|
485067
|
1604
|
64
|
-89
|
392
|
Mackay Pit
|
MRA6518
|
4508096
|
484835
|
1580
|
97
|
-75
|
367
|
North Red Dot
|
MRA6519
|
4503531
|
487799
|
2117
|
307
|
-71
|
274
|
Hollow Point
|
MRA6520
|
4503399
|
487444
|
2060
|
132
|
-70
|
386
|
Hollow Point
|
MRA6521
|
4503730
|
487774
|
2086
|
268
|
-51
|
221
|
Hollow Point
|
MRA6522
|
4503677
|
487777
|
2095
|
269
|
-49
|
325
|
Hollow Point
|
MRA6523
|
4507249
|
485061
|
1604
|
88
|
-56
|
383
|
Mackay Pit
|
MRA6524
|
4503799
|
487737
|
2075
|
265
|
-51
|
171
|
Hollow Point
|
MRA6525
|
4507274
|
485067
|
1604
|
86
|
-76
|
386
|
Mackay Pit
|
MRA6526
|
4507274
|
485068
|
1604
|
89
|
-51
|
367
|
Mackay Pit
|
MRA6529
|
4503674
|
487710
|
2093
|
269
|
-49
|
305
|
Hollow Point
|
MRA6530
|
4503585
|
487288
|
2030
|
270
|
-65
|
264
|
Hollow Point
|
MRA6532
|
4503312
|
487288
|
2048
|
265
|
-66
|
270
|
Hollow Point
|
MR6534
|
4504744
|
487111
|
1852
|
100
|
-89
|
215
|
Valmy
|
MRA6536
|
4507089
|
485327
|
1455
|
89
|
-54
|
123
|
Mackay Pit
|
MRA6537
|
4507029
|
485282
|
1455
|
90
|
-45
|
123
|
Mackay Pit
|
MR6539
|
4504861
|
487200
|
1859
|
220
|
-89
|
245
|
Valmy
|
MR6540
|
4504350
|
487233
|
1902
|
302
|
-90
|
322
|
Valmy
|
|
Note: The numerical gaps in the drillhole sequence result from
drillholes reported previously or drillholes expected to be drilled in later 2017.
|
Table 5. Drill Results at the Seabee Gold Operation, Saskatchewan, Canada for the Period from
August 1, 2017 to September 30, 2017.
Hole ID
|
From
(meters)
|
To
(meters)
|
Mine E
(midpoint)1
|
Mine N
(midpoint)1
|
Elevation
(midpoint)1
|
Gold
Grade
(g/t)2
|
True
Width
(meters)
|
Zone
|
SUG-17-043
|
150.8
|
155.6
|
3663.2
|
5003.4
|
-449.3
|
1.10
|
3.01
|
9C
|
|
161.4
|
162.5
|
3656.7
|
4999.0
|
-453.0
|
0.67
|
0.69
|
9B
|
SUG-17-044
|
146
|
148.2
|
3672.9
|
5009.1
|
-457.6
|
0.35
|
1.47
|
9C
|
|
152.3
|
157.8
|
3667.3
|
5005.1
|
-461.6
|
0.67
|
3.68
|
9B
|
SUG-17-045
|
138.3
|
141.9
|
3685.5
|
5012.8
|
-464.0
|
0.01
|
2.61
|
9C
|
|
144.9
|
147.9
|
3681.4
|
5009.6
|
-467.5
|
0.18
|
2.17
|
9B
|
|
159
|
161.9
|
3672.2
|
5002.3
|
-475.3
|
0.05
|
2.09
|
9A
|
SUG-17-046
|
188.4
|
191
|
3620.4
|
4982.4
|
-421.5
|
21.66
|
1.21
|
9C
|
|
198.2
|
201
|
3612.1
|
4977.4
|
-423.5
|
3.56
|
1.30
|
9B
|
SUG-17-047
|
216.8
|
220.7
|
3592.1
|
4968.0
|
-406.9
|
3.54
|
1.58
|
9C
|
|
258.7
|
262
|
3556.5
|
4947.2
|
-412.0
|
14.39
|
1.31
|
9B
|
SUG-17-048
|
171.8
|
172.8
|
3641.7
|
4980.1
|
-414.5
|
0.01
|
0.52
|
9C
|
|
171.8
|
172.8
|
3633.4
|
4974.1
|
-416.5
|
1.63
|
2.31
|
9B
|
|
185.0
|
196.6
|
3627.0
|
4969.4
|
-417.9
|
3.47
|
6.09
|
9A
|
SUG-17-049
|
142.9
|
148.4
|
3673.7
|
4992.2
|
-433.1
|
5.94
|
3.47
|
9C
|
|
153.1
|
155.5
|
3667.4
|
4986.9
|
-435.9
|
0.05
|
1.50
|
9B
|
SUG-17-050
|
132.5
|
136
|
3692.5
|
4997.4
|
-444.9
|
8.15
|
2.58
|
9C
|
|
144.7
|
148
|
3685.0
|
4989.7
|
-450.4
|
14.77
|
2.43
|
9B
|
SUG-17-051
|
184
|
187
|
3638.3
|
4959.4
|
-391.7
|
0.05
|
1.40
|
9C
|
|
202.5
|
203.3
|
3625.0
|
4948.2
|
-392.9
|
2.50
|
0.37
|
9B
|
SUG-17-052
|
183.8
|
189
|
3645.4
|
4950.3
|
-377.9
|
0.05
|
2.31
|
9C
|
|
220.5
|
221.8
|
3619.6
|
4927.1
|
-378.2
|
0.03
|
0.58
|
9B
|
|
229.1
|
231
|
3612.9
|
4921.1
|
-378.3
|
27.28
|
0.84
|
9A
|
SUG-17-053
|
205.5
|
209.1
|
3631.3
|
4936.5
|
-362.2
|
0.11
|
1.66
|
9C
|
|
263.3
|
266.6
|
3588.9
|
4897.6
|
-359.8
|
0.60
|
1.51
|
9A
|
SUG-17-054
|
229.1
|
238.1
|
3573.0
|
5033.1
|
-485.1
|
0.01
|
3.89
|
9C
|
|
280.6
|
281.7
|
3531.9
|
5023.0
|
-506.7
|
0.01
|
0.48
|
9A
|
SUG-17-302
|
340.8
|
351.6
|
4149.6
|
5269.2
|
-365.2
|
0.01
|
5.58
|
Gap HW
|
JOY-17-769
|
223.7
|
226.2
|
4776.9
|
5190.2
|
-184.8
|
4.36
|
2.46
|
Gap HW
|
|
413.3
|
416.8
|
4763.7
|
5070.0
|
-331.3
|
4.18
|
3.43
|
8A
|
|
422.2
|
427
|
4762.7
|
5063.8
|
-338.5
|
0.07
|
4.70
|
8A Footwall
|
JOY-17-770
|
411.5
|
414.6
|
4761.5
|
5048.3
|
-310.4
|
0.61
|
3.02
|
8A
|
|
418.9
|
421.5
|
4760.5
|
5043.3
|
-315.4
|
17.31
|
2.54
|
8A Footwall
|
JOY-17-771
|
411
|
417.9
|
4774.4
|
5047.5
|
-312
|
3.89
|
6.83
|
8A
|
|
420.9
|
424.7
|
4774.0
|
5041.5
|
-317.8
|
0.25
|
3.76
|
8A Footwall
|
SUG-17-920
|
286.6
|
291.3
|
4558.6
|
5154.7
|
-448.7
|
0.14
|
5.83
|
8A
|
|
304.8
|
307
|
4560.6
|
5152.4
|
-465.4
|
2.23
|
1.36
|
8A Footwall
|
SUG-17-921
|
380.3
|
390
|
4603.9
|
5244.8
|
-532.5
|
0.14
|
5.83
|
8A
|
SUG-17-922
|
317.4
|
320.7
|
4541.2
|
5181.4
|
-479.5
|
6.67
|
2.41
|
8A
|
|
327.7
|
330
|
4541.8
|
5181.1
|
-489.3
|
0.01
|
1.68
|
8A Footwall
|
SUG-17-923
|
468.4
|
473.3
|
4525.0
|
5325.2
|
-605.9
|
24.00
|
2.14
|
8A
|
|
Notes:
|
1 Midpoints of
the intercept determined where mineralized structure intersected.
|
2 Gold values cut
to 75 g/t.
|
Cautionary Note Regarding Forward-Looking Statements
This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking
statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively, "forward-looking
statements"). All statements, other than statements of historical fact, are forward-looking statements.
Generally, forward-looking statements can be identified by the use of words or phrases such as "expects," "anticipates,"
"plans," "projects," "estimates," "assumes," "intends," "strategy," "goals," "objectives," "potential," "believes," or variations
thereof, or stating that certain actions, events or results "may," "could," "would," "might" or "will" be taken, occur or be
achieved, or the negative of any of these terms or similar expressions. The forward-looking statements in this news release
relate to, among other things: future production of gold, silver and other metals; future costs of inventory, and cash costs,
total costs and AISC per payable ounce of gold, silver and other metals sold; expected achievement of our annual production and
cash costs guidance; expected exploration and development expenditures; the prices of gold, silver and other metals; expansion of
the Seabee Gold Operation based on the results of the PEA; the PEA representing production growth, improved margins and
processing plant performance and low capital investment; timing, amount and duration of future production of gold under the PEA;
our ability to discover new areas of mineralization, to expand Mineral Reserves and to convert Mineral Resources into Mineral
Reserves; the timing of awarding construction contracts for the Chinchillas project's supporting infrastructure; the timing of
receipt of permits for construction at the Chinchillas project; expected timing of construction of and ore delivery from the
Chinchillas project; the timing of commencement of drilling at the Fisher project; the expected duration of mining of higher clay
ore at the Mackay pit; the effects of laws, regulations and government policies affecting our operations or potential future
operations; our exposure to fluctuations in ARS and interest rates on the liability under the tax moratorium; the expected
devaluation of the Argentine peso; future successful development of our projects; the sufficiency of our current working capital,
anticipated operating cash flow or our ability to raise necessary funds; estimated production rates for gold, silver and other
metals produced by us; timing of production and the cash costs and total costs of production at the Marigold mine, the Seabee
Gold Operation and Puna Operations; the estimated cost of sustaining capital; ongoing or future development plans and capital
replacement, improvement or remediation programs; the estimates of expected or anticipated economic returns from our mining
projects, including future sales of metals, concentrate or other products produced by us; and our plans and expectations for our
properties and operations.
These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that
could cause actual events or results to differ from those expressed or implied, including, without limitation, the following:
uncertainty of production, development plans and cost estimates for the Marigold mine, the Seabee Gold Operation, Puna Operations
and our projects; our ability to replace Mineral Reserves; our ability to obtain necessary permits for the Chinchillas project;
commodity price fluctuations; political or economic instability and unexpected regulatory changes; currency and interest rate
fluctuations; the possibility of future losses; general economic conditions; fully realizing the value of our shareholdings in
Pretium and our other marketable securities, due to changes in price, liquidity or disposal cost of such marketable securities;
counterparty and market risks related to the sale of our concentrate and metals; uncertainty in the accuracy of Mineral Reserves
and Mineral Resources estimates and in our ability to extract mineralization profitably; differences in U.S. and Canadian
practices for reporting Mineral Reserves and Mineral Resources; lack of suitable infrastructure or damage to existing
infrastructure; future development risks, including start-up delays and cost overruns; our ability to obtain adequate financing
for further exploration and development programs and opportunities; uncertainty in acquiring additional commercially mineable
mineral rights; delays in obtaining or failure to obtain governmental permits, or non-compliance with our permits; our ability to
attract and retain qualified personnel and management; potential labour unrest, including labour actions by our unionized
employees at Puna Operations; the impact of governmental regulations, including health, safety and environmental regulations,
including increased costs and restrictions on operations due to compliance with such regulations; reclamation and closure
requirements for our mineral properties; failure to effectively manage our tailings facilities; social and economic changes
following closure of a mine may lead to adverse impacts and unrest; unpredictable risks and hazards related to the development
and operation of a mine or mineral property that are beyond our control; indigenous peoples' title claims and rights to
consultation and accommodation may affect our existing operations as well as development projects and future acquisitions;
assessments by taxation authorities in multiple jurisdictions; recoverability of VAT and significant delays in the collection
process in Argentina; claims and legal proceedings, including adverse rulings in litigation
against us and/or our directors or officers; compliance with anti-corruption laws and internal controls, and increased regulatory
compliance costs; complying with emerging climate change regulations and the impact of climate change, including extreme weather
conditions; fully realizing our interest in deferred consideration received in connection with recent divestitures; uncertainties
related to title to our mineral properties and the ability to obtain surface rights; the sufficiency of our insurance coverage;
civil disobedience in the countries where our mineral properties are located; operational safety and security risks; actions
required to be taken by us under human rights law; competition in the mining industry for mineral properties; our ability to
complete and successfully integrate an announced acquisition; an event of default under our convertible notes may significantly
reduce our liquidity and adversely affect our business; failure to meet covenants under our senior secured revolving credit
facility; conflicts of interest that could arise from certain of our directors' and officers' involvement with other natural
resource companies; information systems security threats; and those other various risks and uncertainties identified under the
heading "Risk Factors" in our most recent Annual Information Form filed with the Canadian securities regulatory authorities and
included in our most recent Annual Report on Form 40-F filed with the U.S. Securities and Exchange Commission ("SEC").
This list is not exhaustive of the factors that may affect any of our forward-looking statements. Our forward-looking
statements are based on what our management considers to be reasonable assumptions, beliefs, expectations and opinions based on
the information currently available to it. Assumptions have been made regarding, among other things, our ability to carry on our
exploration and development activities, our ability to meet our obligations under our property agreements, the timing and results
of drilling programs, the discovery of Mineral Resources and Mineral Reserves on our mineral properties, the timely receipt of
required approvals and permits, including those approvals and permits required for successful project permitting, construction
and operation of our projects, the price of the minerals we produce, the costs of operating and exploration expenditures, our
ability to operate in a safe, efficient and effective manner, our ability to obtain financing as and when required and on
reasonable terms and our ability to continue operating the Marigold mine, the Seabee Gold Operation and Puna Operations, the
factors identified in the PEA which may affect the Mineral Resource estimate, the Mineral Reserve estimate and the economic
analysis under the PEA, the capital and operating cost assumptions identified in the PEA, dilution and mining recovery
assumptions, assumptions regarding stockpiles, the success of mining, processing, exploration and development activities, the
accuracy of geological, mining and metallurgical estimates, no significant unanticipated operational or technical difficulties,
maintaining good relations with the communities surrounding the Marigold mine, the Seabee Gold Operation and Puna Operations, no
significant events or changes relating to regulatory, environmental, health and safety matters, certain tax matters and no
significant and continuing adverse changes in general economic conditions or conditions in the financial markets (including
commodity prices, foreign exchange rates and inflation rates). You are cautioned that the foregoing list is not exhaustive of all
factors and assumptions which may have been used. We cannot assure you that actual events, performance or results will be
consistent with these forward-looking statements, and management's assumptions may prove to be incorrect. Our forward-looking
statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof
and we do not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations
or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue
reliance on forward-looking statements.
Cautionary Note to U.S. Investors
This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards
in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance
with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public
disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ
significantly from the requirements of the SEC set out in SEC Industry Guide 7. Consequently, Mineral Reserves and Mineral
Resources information included in this news release is not comparable to similar information that would generally be disclosed by
domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC. Under SEC standards,
mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be
economically produced or extracted at the time the reserve determination is made. In addition, the SEC's disclosure standards
normally do not permit the inclusion of information concerning "Measured Mineral Resources," "Indicated Mineral Resources" or
"Inferred Mineral Resources" or other descriptions of the amount of mineralization in mineral deposits that do not constitute
"reserves" by U.S. standards in documents filed with the SEC. U.S. investors should understand that "Inferred Mineral Resources"
have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility.
Moreover, the requirements of NI 43-101 for identification of "reserves" are also not the same as those of the SEC, and reserves
reported by us in compliance with NI 43-101 may not qualify as "reserves" under SEC standards. Accordingly, information
concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in
accordance with U.S. standards.
Cautionary Note Regarding Non-GAAP Measures
This news release includes certain terms or performance measures commonly used in the mining industry that are not defined
under International Financial Reporting Standards ("IFRS"), including cash costs, total costs and AISC per payable ounce of
precious metals sold, realized metal prices, adjusted attributable income (loss) before tax, adjusted attributable income tax
(expense), adjusted net income (loss), adjusted attributable basic earnings (loss) per share and working capital. Non-GAAP
financial measures do not have any standardized meaning prescribed under IFRS and, therefore, they may not be comparable to
similar measures reported by other companies. We believe that, in addition to conventional measures prepared in accordance with
IFRS, certain investors use this information to evaluate our performance. The data presented is intended to provide additional
information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with
IFRS. These non-GAAP measures should be read in conjunction with our consolidated financial statements. Readers should refer to
"Non-GAAP and Additional GAAP Financial Measures" in section 12 of our MD&A, available under our corporate profile at
www.sedar.com or on our website at www.ssrmining.com, for a more detailed discussion of how we calculate such measures and for a reconciliation of
such measures to IFRS terms.
SOURCE SSR Mining Inc.
View original content: http://www.newswire.ca/en/releases/archive/November2017/07/c2720.html