BWR receives aeromagnetic interpretation and satellite image of its Little Stull Lake Project, Manitoba
TORONTO, ONTARIO--(Marketwired - Nov. 9, 2017) - BWR Exploration Inc. (TSX VENTURE:BWR) ("BWR") is pleased to
provide an exploration update, including an initial interpretation of recent airborne survey results on its Little Stull Lake
Gold Project, located in Northeastern Manitoba. In addition, BWR has received a high resolution satellite image of the project
area. The aeromagnetic survey is a precise map of the entire property, while the satellite image provides a baseline pairing and
precise topographic base.
As previously announced (August 14, 2017), BWR completed an aeromagnetic geophysical survey over its 20 mining claims and two
Mineral Exploration Licenses. BWR's land package covers an aggregate of 388 square kilometers of favorable exploration terrain,
tying up most of the Manitoba portion of the Wolf Bay Shear Zone ("WBSZ") that has been likened to the Abitibi Greenstone belt of
Northeastern Ontario and Northwestern Quebec. The eastern portion of the airborne survey was designed to focus on the historical
drilled area referred to as the West Zone, located within Mineral Exploration License ("MEL") 1026A with high density (125 m
spacing) flight-line airborne coverage over a 14 kilometer strike length. The western portion of the survey covered MEL 426A with
less dense (250m spacing) flight line coverage, sufficient for reconnaissance level exploration. The survey once filed with
the Manitoba Ministry of Growth and Trade (Mineral division), fulfills the first-year exploration expenditure commitments on the
MEL's. The flying was scheduled to minimize impacts on traditional activities in the area.
In general terms, the aeromagnetic survey has mapped a complex, banded magnetic unit in the southeast portion of the survey
near Little Stull Lake in the vicinity of the historically drilled gold mineralized zones. The total field magnetic anomalies are
consistent with a steeply dipping volcanic assemblage, trending in a roughly NW-SE direction, aligned with the WBSZ. The
assemblage appears as series of lineaments, one of which appears to be related to the known gold mineralization. Further
processing of the magnetic data in the vicinity of the gold zones implies a relationship between the magnetic signature and gold
mineralization, however the intensity of the magnetic unit wanes in the mineralized zone. It is felt that this may be a result of
magnetite depletion, which may be part of the gold emplacement model. (see link to image: https://bwrexploration.com/press-releases)
The results of the aeromagnetic survey coupled with the high resolution satellite image are being used to plan future
exploration work within the two MEL's, with a focus on the 6 kilometers that cover the historical drilled areas. The high
resolution (0.5m/pixel) satellite image covering MEL 1026A captured the Kistigan Lake / Little Stull Lake area during two
satellite flyovers in August, 2017. The image clearly defines various geographic features in the area including: historical drill
sites, drill access trails, clearings by previous operators, trenched areas, outcroppings, as well as the recently refurbished
12-man exploration camp. As the project advances, this high-resolution image will be used for base line studies (environmental
and TEK). Historical exploration data is currently being superimposed onto the satellite image base map and corrected for
positioning, this is a key exercise to resolve positional discrepancies between the various eras of exploration at Little Stull
Lake prior to the commencement of diamond drilling by BWR.
BWR is currently planning and preparing for its next exploration program that will focus on the historically drilled "West
Zone". Exploration will be initially designed to replicate selected holes as needed to validate historical drill results,
prior to incorporating the historical data into BWR's maiden inferred resource estimate. Historical holes drilled by Westmin
Resources and others in the period 1985-2007 returned significant intersections of gold mineralization as highlighted in the NI
43-101 report that has been filed on the project. (see December 22, 2016 SEDAR filing entitled "NI-43-101 Technical Report on the
Little Stull Lake Gold Project, NE Manitoba" as prepared by Patrick N. Chance, M.Sc., P.Eng. dated December 2, 2016).
The scientific and technical content of this press release has been reviewed, prepared and approved by Mr. Neil Novak, P.Geo.,
President and CEO who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral
Projects.
BWR Exploration Inc. is a public company focused on exploring for base and precious metals, with its flagship Little Stull
Lake Gold Project in NE Manitoba along with other exploration projects in Northern Ontario, and Northern Quebec, Canada.
Management of BWR includes an accomplished group of exploration/mining specialists with many decades of operational experience in
the junior resource sector. There are currently 55,727,461 shares issued in BWR.
This press release may contain forward-looking statements. Such forward-looking statements involve known and unknown
risks, uncertainties and other factors which may cause the actual results, performance or achievements of BWR Exploration Inc. to
be materially different from actual future results and achievements expressed or implied by such forward-looking statements.
Readers are cautioned not to place undue reliance on these forward-looking statements which speak only as of the date the
statements were made, except as required by law. BWR Exploration Inc. undertakes no responsibility to publicly update or revise
any forward-looking statements. These risks and uncertainties include: the uncertainty of receiving the interpreted airborne
survey results or that actual results obtained by BWR in the future may differ materially from the historical results described
in this press release, which historical results have not been verified by BWR. In addition, readers of this press release
should review the risks and uncertainties that are described in the quarterly and annual reports and in the documents submitted
to the securities administration. Neither the Toronto Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
For information about BWR Exploration Inc., please visit our new website: http://www.bwrexploration.com