- Foran retains ownership of the McIlvenna Bay Project
- Significant upside remains on Bigstone, Thunder Zone and Target A
VANCOUVER, British Columbia, Dec. 04, 2017 (GLOBE NEWSWIRE) -- Foran Mining Corporation
(TSX.V:FOM) (“Foran” or the “Company”) is pleased to announce that it has executed a Technical Services Agreement (“Agreement”)
with Glencore Canada Corporation (“Glencore”). The Agreement contemplates Glencore contributing its professional and
technical services, assistance, guidance, and advice in connection with the objective of completing a Feasibility Study on Foran’s
McIlvenna Bay Project (the “Project”).
Patrick Soares, President and CEO of Foran stated, “We are delighted to have Glencore, a world
leader in the mining, smelting and marketing of zinc and copper, involved in the McIlvenna Bay Project. Their technical
knowledge and expertise, gained from operating a broad spectrum of zinc and copper mines the world over, will be invaluable as we
advance McIlvenna Bay towards a production decision. If an affirmative production decision is made, Foran will then have access to
the most effective and safest mining methods for the Project. Foran will also continue exploration efforts on its other highly
prospective targets in proximity to McIlvenna Bay.”
Consideration for this Agreement is an exclusive off-take contract for Glencore to purchase or toll process all
of the concentrates and/or other mineral products produced from the Project at prevailing market rates.
Within 60 days of execution of this Agreement, Glencore will finalise a comprehensive review of the Project
which will serve as a basis for its approach to the Feasibility Study (the “Preliminary Work”). In order to assess the need for and
complete a Feasibility Study, an infill drilling program is required. Glencore and Foran will jointly design the program
which would then be conducted by Foran’s geological team. If the Preliminary Work suggests an economically viable project, the
parties will continue with the Feasibility Study.
Foran’s responsibilities include upgrading the current resources to reserves and all environmental and
socioeconomic elements of the Feasibility Study. Foran maintains full ownership of the Project and intends to concurrently advance
exploration on its other high priority targets: Target A, Thunder Zone and Bigstone.
Glencore would be responsible for all engineering and technical aspects of the Feasibility Study which is to be
delivered nine months from the date of receiving the final assays from the infill drilling program. Glencore has agreed to assist
Foran with the procurement of project financing in order to complete the development and placing of the Project into commercial
production. They may also provide technical services while the mine is in construction and ramping up to commercial
production.
Glencore makes no statement or representation as to the economic viability of the Project.
About Foran Mining
Foran is a copper-zinc exploration and development company with projects in the Flin Flon Greenstone Belt.
McIlvenna Bay, Foran’s flagship deposit, is located in east-central Saskatchewan, 65 kilometres west of Flin Flon, Manitoba
and is one of the largest undeveloped VMS deposits in Canada.
On November 12, 2014, Foran announced a positive preliminary economic assessment (“PEA”) for McIlvenna Bay, with
an estimated pre-tax NPV7% of $382M ($263M after-tax) & 22% IRR (19% after-tax) at a US$ Zinc price of 1.06/lb.
Spot Zinc price today is US$1.48/lb. See below and Foran’s news releases from November 12 and December 22, 2014 for important
disclosures with respect to the McIlvenna Bay PEA.
The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral
resources that are considered too speculative geologically to have the economic considerations applied to them that would enable
them to be categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic
viability. Due to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral
resource will be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be
realized.
Roger March, P.Geo., VP Project Exploration for Foran and a Qualified Person within the meaning of National
Instrument 43-101, has reviewed and approved the technical information in this release.
Foran trades on the TSX.V under the symbol “FOM”.
For additional information, please contact Foran Mining Corporation:
Patrick Soares
President & CEO
904 – 409 Granville Street
Vancouver, BC, Canada, V6C 1T2
604-488-0008
ir@foranmining.com
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V)
accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has
approved or disapproved the information contained herein.
Forward Looking Statements
This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information
involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities
to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news
release includes, but is not limited to, Foran’s objectives, goals or future plans, statements regarding the Technical Services
Agreement and whether preliminary work will support proceeding with a feasibility study and, if so, whether such study will suggest
an economically viable project, estimation of mineral resources, exploration results, potential mineralization, exploration and
mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause
actual results to differ materially from such forward-looking information include, but are not limited to, preliminary work under
the Technical Services Agreement which does not support proceeding with a feasibility study, and assuming the parties agree to
proceed with the feasibility study, the failure of such study to suggest an economically viable project, failure to convert
estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature
of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project
approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in
equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and
the other risks involved in the mineral exploration and development industry, and those risks set out in Foran’s public documents
filed on SEDAR. Although Foran believes that the assumptions and factors used in preparing the forward-looking information in this
news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this
news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Foran disclaims any
intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events
or otherwise, other than as required by law.