Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Jaxon Mining Inc.: Phase 1 Drilling Complete at Max Target, Hazelton Project

V.JAX.H

Vancouver, British Columbia--(Newsfile Corp. - December 7, 2017) - Jaxon Mining Inc. (TSXV: JAX) (FSE: 0U31) (OTC: JXMNF) is pleased to announce the completion of the Fall/Winter 2017 drilling program at its Hazelton silver-zinc project, located 50 kilometres north of Smithers, British Columbia in the prolific Skeena Arch.

Jaxon drilled a total of 2,281 metres in 12 diamond drill holes. Core logging is almost complete, and core splitting is on-going. As of today, 1019 samples have been selected to be sent to MS Analytical laboratory in Langley, BC. Delays are still being experienced at the lab due to an above-average volume of business late in the season. First assays are expected by late-December 2017.

Core was sampled based on zones of mineralization, alteration and lithology and sampled intervals ranged in size from 0.5m to 2.0m, with the average being approximately 1.0m. Representative samples of core from mineralized zones have been selected for future petrographic studies as well.

Bruce Ballantyne, Jaxon's Project Manager, stated "Jaxon is very appreciative of the excellent expert team work of the diamond drill crews, helicopter support, pad-builders, ground logistics and the professional work of the core logging, sampling and sawing, cutting and shipping crews. Considering that the oncoming winter weather made things difficult, the swift completion of the program was outstanding." He added, "At this stage, Jaxon has strong confidence that the zones of mineralisation noted in the drill core are directly related to the anomaly trends as modelled from the 3D and 2D IP survey."

John King Burns, Chairman of Jaxon, stated "We would like to thank Bruce, our entire team, our contractors and the local community for designing and completing the drill program safely, on time and budget with no loss time accidents. We announced in the late fall that we were going to conduct a drill program at the Max Target before winter weather set in, we successfully closed a financing to pay for the work and we have now completed the program. We are already starting to design our exploration and drilling programs for the spring of 2018 and will announce those plans in the winter of 2018."

This news release has been reviewed and approved by Derrick Strickland, P.Geo. a qualified person for the purpose of National Instrument 43-101, standards and disclosure for mineral projects.

About Jaxon

Jaxon is a precious and base metals exploration company with a regional focus on Western Canada. The company is currently focused on advancing its Hazelton Project in north-central British Columbia and the More Creek Project (consolidating the Wishbone and Foremore properties) in BC's Golden Triangle.

ON BEHALF OF THE BOARD OF DIRECTORS
JAXON MINING INC.

"Jason Cubitt"
Jason Cubitt, President.

For further information regarding Jaxon Mining Inc., please contact Mark Carruthers at 604-608-0400
Toll free: 1-877-608-0007.

This news release may contain forward-looking information, which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release may include, but is not limited to, the Company's objectives, goals or future plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames, or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. Neither TSX Venture exchange nor its Regulations Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today