OTTAWA, May 09, 2018 (GLOBE NEWSWIRE) -- Cornerstone Capital Resources Inc. (“Cornerstone” or “the
Company”) (TSX-V:CGP) (Frankfurt:GWN) (Berlin:GWN) (OTC:CTNXF) announces the following trenching results from the
Bramaderos Main prospect at its Bramaderos Gold-Copper Project in southern Ecuador.
Figures related to this news release can be seen in PDF format by accessing the version of this release on the
Company’s website (www.cornerstoneresources.com) or by clicking on the link below:
http://www.cornerstoneresources.com/i/pdf/NR18-17Figures.pdf.
Highlights:
-
Longitudinal surface trenching results at the Bramaderos Main prospect, part of the Bramaderos Gold-Copper Project in
Ecuador, have delivered the following assay results:
• 615m at 0.52g/t gold and 0.11% copper, including
- 123m at 0.55g/t gold and 0.17% copper, and
- 180m at 0.6g/t gold
- The mineralized domain at Bramaderos Main measures at least 620m x 220m at surface, and based on 2 historical drill
holes has a vertical extent exceeding 300 m, with mineralization open laterally and at depth
Further Information:
Cornerstone Capital Resources Inc. (TSX-V:CGP) is pleased to report gold and copper results from the final phase
of trenching at the Bramaderos Main gold-copper porphyry target, within its Bramaderos Project in Ecuador (Figures 1 and
4).
Trench BM-14 was excavated along a 615m longitudinal position of mineralized diorite. Mineralization remains
open to the NW, and although appears to be closed off at surface to the SE, mineralization is interpreted to extend and plunge to
the SE below cover (Figure 2).
It is interpreted that this trench has sampled along the best of the outcropping mineralization, with higher
grade sections interpreted to be controlled by structures with greater vein density. The trench also is interpreted to have sampled
the surface expression of a tilted mineralized system (Figure 2).
Orthogonal trenches, which have been reported previously, have sampled mineralized diorite up to 220m wide in
areas across the longitudinal trench (e.g. trench BM-07 which intersected 216m at 0.5g/t gold, and BM-02 which
intersected 141m at 0.6g/t gold and 0.15% copper).
While historical drilling indicates that mineralization extends to between 200 and 300m deep, the 3-D geometry
of the Bramaderos Main porphyry gold-copper system is yet to be determined. Some insight into a possible geometry is indirectly
provided by the recently released 3-D magnetic modelling which suggests a SE-plunging system of at least 1km vertical extent
(Figures 2 and 3). Drilling will be targeted to address this issue. Proposed drill holes are shown in Figure
1.
The interpreted plunging geometry would explain a weakening of mineralization at surface to the SE, and
mineralization open to the NW where the magnetic anomaly shallows up-dip into the intensely altered Bramaderos Hill topographic
high (Figure 2).
All trench results are now compiled and tabulated (Table 1) and shown in the attached Figure 1.
Three proposed drill holes are also shown in Figure 1 and it is expected that these holes will be the first to be
drilled by Sunstone at Bramaderos.
It is expected that Bramaderos Main will be the first of 4 targets to be drilled once permitting is in
place.
About Bramaderos
The Bramaderos concession is owned by Cornerstone subsidiary La Plata Minerales S.A. (“PLAMIN”), which has
signed a binding letter of intent with Sunstone Metals Ltd. (formerly Avalon Minerals Ltd.) (ASX:STM), whereby Sunstone has the
right to earn a 51% interest in the project by spending US$3.4 million over 3 years to complete a phase 1 drill program. If this
first option is earned, Sunstone can go to 70% by funding a bankable feasibility study, and can go to 80% by financing 100% of the
cost of construction of a mine and mill (see news release 17-08 dated April 10, 2017).
Qualified Person:
Yvan Crepeau, MBA, P.Geo., Cornerstone’s Vice President, Exploration and a qualified person in accordance with
National Instrument 43-101, is responsible for supervising the exploration program at the Bramaderos project for Cornerstone and
has reviewed and approved the information contained in this news release.
Sampling and assaying
Rock samples are collected by PLAMIN’s personnel, placed in plastic bags, labeled and sealed, and stored in a
secure place until delivery by PLAMIN employees to the LAC y Asociados ISO 9001-2008 certified sample preparation facility in
Cuenca, Ecuador.
Rock samples are prepared crushing to 70% passing 2 mm (10 mesh), splitting 250 g and pulverizing to 85% passing
75 microns (200 mesh) (MSA code PRP-910). Prepared samples are then shipped to MS Analytical Services (MSA), an ISO 9001-2008
laboratory in Langley, BC, Canada, where samples are assayed for a multi-element suite (MSA code IMS-136, 15.0 g split, Aqua Regia
digestion, ICP-AES/MS finish) and gold by Fire Assay (MSA code FAS-111, 30 g fusion, AAS finish). Over limit results for Cu
(>1%) are systematically re-assayed (MSA code ICF-6Cu, 0.2 g, 4-acid digestion, ICP-AES finish). Gold is assayed using a 30 g
split, Fire Assay (FA) and AAS finish (MSA code FAS 111). Over limit results for Au (>10 g/t) are systematically
re-assayed (MSA code FAS-415, FA, 30g., gravimetric finish).
Soil samples are dried at low temperature, screened to 80 mesh (MSA code PRP-757), a 15 grams portion is then
assayed for a multi-elements suite (MSA code IMS-136, Aqua Regia digestion, ICP-AES/MS finish).
Quality assurance / Quality control (QA/QC)
The MSA Analytical Laboratory is a qualified assayer that performs and makes available internal assaying
controls. Duplicates, certified blanks and standards are systematically used (1 control sample every 20-25 samples) as part of
PLAMIN’s QA/QC program. Rejects, a 100 g pulp for each rock sample, are stored for future use and controls.
About Cornerstone:
Cornerstone Capital Resources Inc. is a mineral exploration company with a diversified portfolio of projects in
Ecuador and Chile, including in the Cascabel gold-enriched copper porphyry joint venture in north west Ecuador. Exploraciones
Novomining S.A. (“ENSA”), an Ecuadorean company owned by SolGold Plc and Cornerstone, holds 100% of the Cascabel concession.
Subject to the satisfaction of certain conditions, including SolGold’s fully funding the project through to feasibility, SolGold
Plc will own 85% of the equity of ENSA and Cornerstone will own the remaining 15% of ENSA. SolGold Plc is funding 100% of the
exploration at Cascabel and is the operator of the project.
Pursuant to the previously announced plan of arrangement, Cornerstone will spin off all of its assets except for
its interests in the Cascabel concession in Ecuador, shares of SolGold plc and the joint venture with Ecuadorian state mining
company ENAMI EP into a new company called Cornerstone Exploration Inc. Cornerstone Exploration will own the drill ready Bella
Maria, Shyri NW (Vetas Grandes) and Bramaderos properties in Ecuador, an option to own 100% of the drill ready Caña Brava property
in Ecuador, the Tioloma property surrounding Caña Brava, the applications for new properties in Ecuador made by Cornerstone
subsidiary La Plata Minerales S.A., and the Miocene property in Chile, in addition to Cornerstone's generative exploration
databases for Ecuador and Chile. Cornerstone will be re-named Cascabel Gold & Copper Inc. ("Cascabel Gold & Copper").
The plan of arrangement to spinoff Cornerstone Exploration Inc. is proceeding in the ordinary course
and, pending TSXV approval, is expected to be completed in June 2018.
Further information is available on Cornerstone’s website: www.cornerstoneresources.com and on Twitter. For investor, corporate or media inquiries,
please contact:
Investor Relations:
Mario Drolet; Email: Mario@mi3.ca; Tel. (514) 904-1333
Due to anti-spam laws, many shareholders and others who were previously signed up to receive email updates and
who are no longer receiving them may need to re-subscribe at http://www.cornerstoneresources.com/s/InformationRequest.asp
Cautionary Notice:
This news release may contain ‘Forward-Looking Statements’ that involve risks and uncertainties, such as statements of
Cornerstone’s plans, objectives, strategies, intentions and expectations. The words “potential,” “anticipate,” “forecast,”
“believe,” “estimate,” “expect,” “may,” “project,” “plan,” and similar expressions are intended to be among the statements that
identify ‘Forward-Looking Statements.’ Although Cornerstone believes that its expectations reflected in these
‘Forward-Looking Statements’ are reasonable, such statements may involve unknown risks, uncertainties and other factors disclosed
in our regulatory filings, viewed on the SEDAR website at www.sedar.com. For us, uncertainties arise from the behaviour of financial
and metals markets, predicting natural geological phenomena and from numerous other matters of national, regional, and global
scale, including those of an environmental, climatic, natural, political, economic, business, competitive, or regulatory
nature. These uncertainties may cause our actual future results to be materially different than those expressed in our
Forward-Looking Statements. Although Cornerstone believes the facts and information contained in this news release to be as
correct and current as possible, Cornerstone does not warrant or make any representation as to the accuracy, validity or
completeness of any facts or information contained herein and these statements should not be relied upon as representing its views
after the date of this news release. While Cornerstone anticipates that subsequent events may cause its views to
change, it expressly disclaims any obligation to update the Forward-Looking Statements contained herein except where outcomes have
varied materially from the original statements.
On Behalf of the Board,
Hugh Brooke Macdonald
President and CEO
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.