VAL-D'OR, Quebec, May 29, 2018 (GLOBE NEWSWIRE) -- Metanor Resources Inc. (the “Company” or "Metanor")
(TSX-V:MTO) is pleased to announce drill results from the on-going underground drill campaign at the Bachelor Mine, including new
high-grade results of 19.1 g/t Au over 3.6 metres, 12.0 g/t Au over 4.0 metres and 6.4 g/t Au over 21.8 metres. These new results
have extended the deposit 183 metres or 600 feet below the lowest working level at Bachelor Mine and demonstrate the southeasterly
plunging continuity to the deposit. Highlights from new drill holes include:
• 14-238 from 37.2 m. to 40.8 m. 19.1 g/t Au over 3.6 m.
Intermediate volcanic host with hematite-epidote alteration and 2-5 % pyrite mineralization.
• E18-234 from 361.5 m. to 365.5 m. 12.0 g/t Au over 4.0 m.
Intermediate Volcanic host with hematite-sericite alteration and 1- 2 % pyrite finely disseminated and forming
stringers.
• 14-239 from 34.3 m. to 56.1 m. 6.4 g/t Au over 21.8 m.
Intermediate Volcanic host with hematite-epidote-carbonate alteration and 2 - 5 % pyrite. Possible
structure perpendicular to the Main vein. Further drilling required to confirm the structure.
Highlights of the last 37 drill holes that intersected gold mineralization are listed below:
Hole
# |
From (m) |
To (m) |
Length (m) |
Au g/t |
Zone |
14-238 |
37.2 |
40.8 |
3.6 |
19.1 |
16-00-01 |
|
57.5 |
59.5 |
2.0 |
7.1 |
14-239 |
34.3 |
56.1 |
21.8 |
6.4 |
|
68.6 |
69.8 |
1.2 |
5.9 |
14-240 |
59.0 |
59.5 |
0.5 |
5.1 |
14-241 |
69.4 |
70.6 |
1.2 |
0.5 |
14-242 |
68.5 |
70.6 |
2.0 |
5.9 |
|
74.4 |
82.2 |
7.8 |
4.9 |
14-243 |
74.7 |
76.7 |
2.0 |
6.5 |
14-244 |
74.8 |
76.6 |
1.8 |
4.5 |
14-245 |
79.0 |
90.2 |
11.3 |
4.5 |
14-246 |
85.7 |
87.0 |
1.3 |
2.3 |
14-247 |
81.6 |
82.3 |
0.8 |
0.9 |
14-256 |
70.1 |
71.6 |
1.5 |
0.4 |
14-257 |
|
|
|
Trace |
14-258 |
85.1 |
85.5 |
0.5 |
1.9 |
14-235 |
172.7 |
176.8 |
4.2 |
4.5 |
16-00-04 |
14-232 |
150.8 |
152.0 |
1.2 |
5.6 |
16-00-06 |
14-233 |
164.5 |
165.6 |
1.1 |
10.3 |
14-236 |
183.9 |
186.4 |
2.5 |
0.7 |
E17-170 |
420.7 |
424.4 |
3.7 |
4.7 |
Explo
deep |
E17-171 |
495.7 |
497.6 |
1.8 |
3.7 |
E17-172 |
438.9 |
439.5 |
0.7 |
4.4 |
E17-174 |
|
|
|
Trace |
E17-203 |
521.7 |
522.4 |
0.7 |
1.2 |
E17-204A |
419.7 |
421.5 |
1.8 |
2.1 |
E17-205 |
382.5 |
383.5 |
1.1 |
5.5 |
E17-211 |
498.6 |
509.5 |
10.8 |
0.4 |
E17-212 |
|
|
|
Trace |
E17-213 |
405.2 |
407.6 |
2.4 |
0.8 |
E17-218 |
375.2 |
379.0 |
3.9 |
6.4 |
E17-219A |
362.3 |
363.8 |
1.5 |
8.4 |
E17-220 |
492.3 |
495.9 |
3.6 |
0.4 |
E17-221 |
475.5 |
476.2 |
0.7 |
3.7 |
E17-222 |
|
|
|
Trace |
E17-223 |
|
|
|
Trace |
E17-224 |
|
|
|
Trace |
E18-225 |
343.3 |
345.8 |
2.5 |
6.0 |
E17-226 |
|
|
|
Trace |
E18-234 |
361.5 |
365.5 |
4.0 |
12.0 |
*Stated intervals are core lengths as drilled, true thicknesses vary and average between 65% to 80% of core
lengths.
Drillholes information:
Hole # |
Azimuth |
Dip |
Length
(ft) |
Length
(m) |
UTM East |
UTM North |
Elevation |
14-232 |
203 |
-32 |
560 |
171 |
416952.2 |
5483434.1 |
-296.6 |
14-233 |
209.5 |
-34 |
600 |
183 |
416952.0 |
5483434.3 |
-296.7 |
14-235 |
179 |
-37.5 |
660 |
201 |
416953.0 |
5483433.5 |
-297.2 |
14-236 |
203 |
-40 |
650 |
198 |
416952.2 |
5483434.1 |
-297.0 |
14-238 |
208 |
-30.3 |
275 |
84 |
417084.0 |
5483307.7 |
-366.5 |
14-239 |
217 |
-35.2 |
300 |
91 |
417083.8 |
5483307.8 |
-366.6 |
14-240 |
203 |
-37.3 |
300 |
91 |
417084.2 |
5483307.7 |
-366.7 |
14-241 |
191.5 |
-39.5 |
310 |
95 |
417084.5 |
5483307.6 |
-366.7 |
14-242 |
225.5 |
-39.4 |
335 |
102 |
417083.7 |
5483308.0 |
-366.6 |
14-243 |
213 |
-40.7 |
325 |
99 |
417084.0 |
5483307.9 |
-366.6 |
14-244 |
203 |
-42.8 |
335 |
102 |
417084.2 |
5483307.8 |
-366.7 |
14-245 |
232.5 |
-41.7 |
360 |
110 |
417083.6 |
5483308.2 |
-366.7 |
14-246 |
220.5 |
-45.1 |
360 |
110 |
417084.0 |
5483308.2 |
-366.6 |
14-247 |
208 |
-46.5 |
360 |
110 |
417084.3 |
5483308.1 |
-366.7 |
14-256 |
191.5 |
-45.5 |
325 |
99 |
417084.6 |
5483308.0 |
-366.7 |
14-257 |
184 |
-49 |
360 |
110 |
417084.8 |
5483308.0 |
-366.7 |
14-258 |
197 |
-50 |
360 |
110 |
417084.5 |
5483308.0 |
-366.7 |
E17-170 |
170 |
-48 |
2800 |
854 |
417002.4 |
5483560.2 |
-295.7 |
E17-171 |
154 |
-40 |
2000 |
610 |
417002.4 |
5483560.2 |
-295.7 |
E17-172 |
209 |
-52 |
1977 |
603 |
417002.4 |
5483560.2 |
-295.7 |
E17-174 |
239 |
-37 |
2000 |
610 |
417002.4 |
5483560.2 |
-295.7 |
E17-203 |
161 |
-47 |
1751.5 |
534 |
417002.4 |
5483560.2 |
-295.7 |
E17-204A |
159 |
-36.7 |
1600 |
488 |
417002.4 |
5483560.2 |
-295.7 |
E17-205 |
182 |
-44.5 |
1450 |
442 |
417002.4 |
5483560.2 |
-295.7 |
E17-211 |
167.5 |
-50.5 |
1800 |
549 |
417002.4 |
5483560.2 |
-295.7 |
E17-212 |
204 |
-41.5 |
1450 |
442 |
417002.4 |
5483560.2 |
-295.7 |
E17-213 |
153 |
-35 |
1700 |
518 |
417002.4 |
5483560.2 |
-295.7 |
E17-218 |
167.5 |
-38 |
1400 |
427 |
417002.4 |
5483560.2 |
-295.7 |
E17-219A |
164 |
-31 |
1350 |
412 |
417002.4 |
5483560.2 |
-295.7 |
E17-220 |
161 |
-45 |
1700 |
518 |
417002.4 |
5483560.2 |
-295.7 |
E17-221 |
150.5 |
-36 |
1760 |
537 |
417002.4 |
5483560.2 |
-295.7 |
E17-222 |
334 |
-30 |
900 |
274 |
416480.8 |
5483279.9 |
-293.0 |
E17-223 |
6 |
-50 |
875 |
267 |
416480.8 |
5483279.9 |
-293.0 |
E17-224 |
54 |
-51 |
1050 |
320 |
416480.8 |
5483279.9 |
-293.0 |
E18-225 |
182 |
-39 |
1400 |
427 |
417002.4 |
5483560.2 |
-295.7 |
E17-226 |
233 |
-32 |
1500 |
457 |
417002.4 |
5483560.2 |
-295.7 |
E18-234 |
198.5 |
-39 |
2095 |
639 |
417002.4 |
5483560.2 |
-295.7 |
Metanor continues to explore at Bachelor Mine with 2 underground diamond drill rigs drilling into the new Moroy
zone. The diamond drilling in the Main vein will resume at depth once the Main ramp reaches the lower mineralized
horizon.
Quality Control and Reporting Protocols
Metanor estimates that the actual thicknesses of the mineralized intersections are between 65% and 80% of the
core lengths. No capping grade is used at this stage. The Company uses a rigorous QA-QC analytical program according to
industry standards. The analytical results were done by pyroanalysis (A.A.) at the mine laboratory. Blanks, duplicates and
certified reference standards are inserted into the sample stream to monitor laboratory performance. The company’s QA-QC
analytical verification program requires that a minimum of 5% of the samples be audited at an independent laboratory. These
audit assays were sent to ALS laboratory located in Val-d'Or, Quebec. The results of the audits are consistent with those
obtained.
About the Bachelor Mine
The Bachelor Mine produces gold from a mineralized sub-vertical narrow vein system. Methods used are long-hole
mining with rail-track access from a vertical shaft, and the new sub-level sector 14 is accessible from a ramp system. The ore is
processed on site at the Bachelor processing plant using the activated carbon process. The mill is on site and accessible by a
paved road.
Qualified Persons
Pascal Hamelin, P. Eng., President and COO, is the Qualified Person under NI 43-101, who is responsible for
reviewing and approving the technical information contained in this news release.
Cautionary and Forward-Looking Statements
This press release includes certain statements that may be deemed as "forward-looking statements". The potential
quantity and grade is conceptual in nature as there has been insufficient exploration to define a mineral resource and it is
uncertain if further exploration will result in the target being delineated as a mineral resource. All statements in this
discussion, other than those of historical fact, that address future exploration drilling, exploration activities and projected
exploration, including costs and other estimates upon which such projections are based, and events or developments that the company
expects, are considered forward-looking statements. Although the Company believes the expectations expressed in these
forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual
results or developments may differ materially from those forward-looking statements.
Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy
or accuracy of this release.
For more information, please contact:
Pascal Hamelin, President & COO
Telephone: 819-825-8678
email: phamelin@metanor.ca
2872, Sullivan Rd, suite 2
Val-d'Or, QC J9P 0B9
Fig. 1 accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/44235f74-b728-469d-ba56-7b75351b559c
Fig. 2 accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/20e7edc2-6618-4cf4-bf6a-e0305c938954