- Strong growth in revenue from custom milling operations, which rose more than 31%.
- Feasibility study ongoing for the Wasamac gold deposit (measured and indicated resources of 2,587,900 ounces of gold),
based on proven Rail-Veyor material transport technology.
- Results of resource estimates for the McKenzie Break and Swanson deposits bring Monarques'
total combined measured and indicated resource to more than 3.15 million ounces of gold (see Table 1 at the end of this
release).
MONTREAL, Aug. 16, 2018 /CNW/ - MONARQUES GOLD
CORPORATION ("Monarques" or the "Corporation") (TSXV:MQR) (OTCMKTS:MRQRF) (FRANKFURT: MR7) is pleased to report its
production results and other highlights for the fourth quarter ended June 30, 2018. Amounts are in
Canadian dollars unless otherwise indicated.
Production highlights
- Monarques produced 4,695 ounces of gold in its fourth quarter, down 5% from 4,932 ounces the previous quarter.
- The Corporation recorded revenues of $10.0 million in the fourth quarter, from the sale of
4,589 ounces of gold at an average price of $1,609 per ounce (US $1,246), combined with revenue from custom milling, which was up 31% for the quarter.
- Monarques reported an initial set of results for its 2018 drilling program at the Beaufor Mine. The results were for nine
holes totalling 2,047 metres of drilling on the QF1 and 1700 projects (see press release dated July 17, 2018).
"The highlights of the quarter were the strong growth in our custom milling operations and the start of our feasibility study
on the Wasamac deposit," said Jean-Marc Lacoste, President and Chief Executive Officer of
Monarques. "Our custom milling operations at the Camflo mill grew significantly, enabling us to offset some of the decline in
production at the Beaufor Mine and generate fourth quarter revenues of $10 million. We expect to
maintain the production rate at Camflo in the coming quarters."
"We also started several projects during the quarter, including the Wasamac feasibility study, which is based on the proven
Rail-Veyor system, a material transport technology that has led to dramatically lower operating costs at other major mines. Given
the current gold market, we will obviously be boosting our efforts to assess the options and technologies that allow us to
advance the world-class Wasamac project and put the deposit into production at the lowest possible cost."
Production statistics
|
Quarter ended
June 30, 2018
|
Nine months ended
June 30, 2018
|
Beaufor Mine
(since being acquired from Richmont Mines on October 2, 2017)
|
|
|
Ore processed (tonnes)
|
30,523
|
98,394
|
Gold recovery (%)
|
98.70
|
98.76
|
Ounces produced
|
4,695
|
15,071
|
Ounces sold
|
4,589
|
14,856
|
Corporate highlights
- On May 31, 2018, the Corporation announced that it had retained BBA to conduct a feasibility
study on its Wasamac gold project. The study will cover the assessment, design, engineering and costing of the mine, mill,
tailings management facility and all related services and infrastructure needed to develop and mine the Wasamac deposit. The
new feasibility study will be based on an upgraded measured and indicated resource of 2,587,900 ounces of gold (see
press release).
- On June 14, 2018, the Corporation reported the results of a mineral resource estimate for its
McKenzie Break gold project 35 km north of Val-d'Or, Québec (see press release).
- On June 20, 2018, Monarques reported the results of a mineral resource estimate for its
Swanson gold project 65 kilometres north of the Beacon mill (see press release).
- On July 10, 2018, Monarques reported new assay results from the 2018 diamond drill program at
its wholly owned Croinor Gold project 50 kilometres east of Val-d'Or, Québec. The 20,000-metre
diamond drilling program, which started in March 2018, is focused on the expansion of the Croinor
Gold deposit. The Phase 1 results were from a total of 4,584 metres of drilling in 16 holes (see press release).
- On August 14, 2018, Monarques announced that it has repaid the US $4
million senior secured gold loan borrowed from Auramet International LLC (see
press release).
- As at June 30, 2018, the Company had more than $15 million in
cash.
Current project timelines
The following is a summary of the Corporation's key projects, as well as their timelines:
- Drilling programs at the Beaufor Mine and at Croinor Gold. Some results are expected soon.
- BBA feasibility study on the Wasamac deposit. The results are expected in December 2018.
The technical and scientific content of this press release has been reviewed and approved by Marc-André Lavergne, P.Eng., the
Corporation's qualified person under National Instrument 43‑101.
ABOUT MONARQUES GOLD CORPORATION
Monarques Gold Corporation (TSXV:MQR) is an emerging gold producer focused on pursuing growth through its large portfolio of
high-quality projects in the Abitibi mining camp in Quebec, Canada. The Corporation currently
owns close to 300 km² of gold properties (see map), including
the Beaufor Mine, the Croinor Gold (see video), Wasamac, McKenzie Break and Swanson advanced projects, and the Camflo and
Beacon mills, as well as six promising exploration projects. It also offers custom milling services out of its 1,600
tonne-per-day Camflo mill. Monarques enjoys a strong financial position and has more than 150 skilled employees who oversee its
operating, development and exploration activities.
Forward-Looking Statements
The forward-looking statements in this press release involve known and unknown risks, uncertainties and other factors that may
cause Monarques' actual results, performance and achievements to be materially different from the results, performance or
achievements expressed or implied therein. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is
defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press
release.
Table 1 - Monarques Gold Measured and Indicated Resources
|
Tonnes
(metric)
|
Grade
(g/t Au)
|
Ounces
|
Wasamac property1
|
|
|
|
Measured Resources
|
3.99 million
|
2.52
|
323,300
|
Indicated Resources
|
25.87 million
|
2.72
|
2,264,500
|
Total Measured & Indicated Resources
|
29.86 million
|
2.70
|
2,587,900
|
Beaufor Mine2
|
|
|
|
Measured Resources
|
74,400
|
6.71
|
16,100
|
Indicated Resources
|
271,700
|
7.93
|
69,300
|
Total Measured & Indicated Resources
|
346,200
|
7.67
|
85,400
|
Croinor Gold Mine3
|
|
|
|
Measured Resources
|
80,100
|
8.44
|
21,700
|
Indicated Resources
|
724,500
|
9.20
|
214,300
|
Total Measured & Indicated Resources
|
804,600
|
9.12
|
236,000
|
Swanson property4
|
|
|
|
Pit Constrained
|
|
|
|
Indicated Resources
|
1,694,000
|
1.80
|
98,100
|
Underground
|
|
|
|
Indicated Resources
|
58,100
|
3.17
|
5,900
|
Total Indicated Resources
|
1,752,100
|
1.85
|
104,100
|
McKenzie Break property5
|
|
|
|
Pit Constrained
|
|
|
|
Indicated Resources
|
939,860
|
1.59
|
48,133
|
Underground
|
|
|
|
Indicated Resources
|
281,739
|
5.90
|
53,448
|
Total Indicated Resources
|
1,221,599
|
2.58
|
101,581
|
Simkar Gold property6
|
|
|
|
Measured Resources
|
33,570
|
4.71
|
5,079
|
Indicated Resources
|
208,470
|
5.66
|
37,905
|
Total Measured & Indicated Resources
|
242,040
|
5.52
|
42,984
|
TOTAL
|
|
|
|
Measured & Indicated Resources
|
|
|
3,157,865
|
|
|
|
|
1 Source: Technical Report on the Wasamac Project,
Rouyn-Noranda, Québec, Canada, Tudorel Ciuculescu, M.Sc., P.Geo., October 25, 2017, Roscoe Postle Associates
Inc.
|
2 Source: NI-43-101 Technical Report on the Mineral Resource and
Mineral Reserve Estimates of the Beaufor Mine as at September 30, 2017, Val-d'Or, Québec, Canada, Carl Pelletier, P. Geo.
and Laurent Roy, Eng.
|
3 Source: Monarques prefeasibility study (January 19, 2018)
and resource estimate (January 8, 2016)
4 Source: NI 43-101 Technical Report on the Swanson Project,
June 20, 2018, Christine Beausoleil, P.Geo. and Alain Carrier, P.Geo., M.Sc. of InnovExplo Inc.
5 Source: NI 43-101 Technical Report on the McKenzie Break
Project, April 17, 2018, Alain-Jean Beauregard, P.Geo., and Daniel Gaudreault, Eng., of Geologica Groupe-Conseil Inc.,
and Christian D'Amours, P.Geo., of GeoPointCom Inc.
6 Source: MRB et Associés (January 2015)
|
View original content with multimedia:http://www.prnewswire.com/news-releases/monarques-gold-produces-4-695-ounces-of-gold-and-generates-10-million-in-revenue-in-its-fourth-quarter-300698134.html
SOURCE Monarques Gold Corporation
View original content with multimedia: http://www.newswire.ca/en/releases/archive/August2018/16/c3651.html