Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Rambler Provides an Update on Diamond Drilling Exploration at Its Ming Copper-Gold Mine

RBMTF

Rambler Provides an Update on Diamond Drilling Exploration at Its Ming Copper-Gold Mine


Newfoundland and Labrador, Canada (FSCwire) - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer today provides an update on its underground exploration program at its Ming Copper-Gold Mine in Eastern Canada.

EXPLORATION UPDATE

  • 11,232 meters of delineation and exploration drilling has been completed from January 1 to August 31, 2018, at an average all-in direct drilling cost of CDN$75 per meter;
  • Exploration drilling in the Ming North Zone (see Figure 1) has discovered significant mineralization down plunge of the historical mining limits higher in the mine.  The current Mineral Resource and Reserve includes material down to the 705 level. The holes announced in this press release extend the high grade massive sulphide zone an additional 300 meters down plunge.  This new mineralization is defined over a strike length of approximately 70 meters; 
  • A total of 2,027 meters of new drilling with composited down-hole widths include assay highlights of:

R18-722-01 - 19.0 meters of 4.1% copper with 2.8 g/t gold

R18-722-02 - 7.3 meters of 2.8% copper with 0.73 g/t gold

?  R18-722-12 - 25.5 meters of 9.4% copper with 5.1 g/t gold

R18-722-15 - 17.0 meters of 3.1% copper with 2.3 g/t gold

  • Lower footwall zone ('LFZ') diamond drilling has been mostly focused on ore stope delineation to allow for the timely completion of final design of well-controlled stopes ahead of planned production.

Please click on, or paste the following link into your web browser to view the full announcement;

http://www.rns-pdf.londonstockexchange.com/rns/4330C_1-2018-9-30.pdf

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.




Source: Rambler Metals and Mining plc (TSX Venture:RAB, AIM:RMM, OTC Pink:RBMTF, FWB:51R)

To follow Rambler Metals and Mining plc on your favorite social media platform or financial websites, please click on the icons below.


Maximum News Dissemination by FSCwire. https://www.fscwire.com

 
 

Copyright © 2018 FSCwire





Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today