Vancouver, British Columbia--(Newsfile Corp. - March 7, 2019) - I-Minerals Inc. (TSXV: IMA) (OTCQB: IMAHF) (FSE: 61M) (the
"Company") provides an update on the industrial mineral market related to its Bovill Kaolin Project.
-
A re-evaluation of the industrial mineral markets by a specialist market research organization indicates that the current
market is unlikely to support a new operation of the size envisaged in the previously filed feasibility study dated March 17,
2016 ("FS").
-
The Bovill Kaolin Project ("BKP") will be reoriented towards establishing the viability of an initial operation with lower
capital-cost and a focus on metakaolin and halloysite.
-
Millcreek Engineering Company of Salt Lake City, Utah, USA have been engaged to estimate capital and operating costs of a
smaller operation.
-
Kaolin and halloysite pilot plant work at Ginn Mineral Technologies ("GMT") will continue to optimize recovery and produce
kaolin feedstock for conversion to metakaolin and halloysite for further product development.
-
The FS is no longer current and should not be relied upon.
-
Mineral resources remain unchanged from October 26, 2015 as stated in the FS. SRK Consultants have been engaged to provide
an updated technical report which will be filed within forty-five days of this release.
An evaluation of the current market for Bovill Kaolin Project ("BKP") minerals conducted by the Company and a specialist market
research organization indicates, the market demand for quartz, K-spar, metakaolin and halloysite and barriers to entry are unlikely
to support a new operation of the size envisaged in the March 2016 Feasibility Study completed by GBM Engineers.
With respect to quartz and potassium feldspar, fundamental changes have taken place over the past several years. Displacement of
North American manufacture of solar glass to foreign locations has reduced the sales potential of high-quality low iron quartz
products. The closure of a major US K-spar producer in late 2013 led many potential customers to reformulate using alternative
minerals due to the high cost of imported potassium feldspar. To gain market share in the quartz and K-spar markets the Company
would need to displace current suppliers, primarily through pricing, and at the same time require customers to undertake additional
reformulation to accommodate new minerals in the production process.
In contrast to quartz and potassium feldspar, the development of the market for metakaolin in the western United States has been
held back by lack of a western producer and high transport costs for metakaolin from the eastern United States. An opportunity
exists to displace a portion of the silica fume pozzolan market and further develop the market for metakaolin. Metakaolin offers
strength activity index, alkali-silica reaction mitigation and permeability properties that few pozzolans or supplementary
cementitious materials can match. Halloysite markets are predicted to materially grow over the coming years and there are few, if
any, halloysite deposits worldwide that can produce material volumes of halloysite of the quality of I-Minerals.
Accordingly, I-Minerals has taken the initial steps to assessing the viability of a phased approach to development of the Bovill
Kaolin Project with the first phase being a smaller metakaolin and halloysite operation.
As an initial step, Millcreek Engineering Company of Salt Lake City, Utah, have been engaged to estimate capital and operating
costs of an initial operation capable of producing up to 20,000 short tons a year of metakaolin and 10,000 short tons of
halloysite. Millcreek are familiar with the BKP having reviewed FS OPEX and CAPEX costs in 2017. Millcreek has commenced the study
with an expected completion date in April 2019. Provided the OPEX and CAPEX numbers estimated by MillCreek are indicative that a
viable operation might be expected, the Company will move forthwith to a preliminary economic assessment and ultimately a
pre-feasibility study. It is envisioned that the quartz-feldspar sand from such operation could be sold into local aggregates
markets. In the interim kaolin and halloysite pilot plant work at Ginn Mineral Technologies ("GMT") will continue to optimize
recovery and produce kaolin feedstock for conversion to metakaolin and halloysite for further product and market development. As
noted in the Company's press release of October 10, 2018 a core purpose of this pilot plant is to test hydrocyclone technology to
separate the clay fraction given prior bench scale work had resulted in 30% of initial feed reporting to the clay circuit as
opposed to 22% in the 2016 Feasibility Study.
The mineral resource estimate remains unchanged from October 26, 2015 as stated in the FS. SRK Consultants have been engaged to
provide an updated technical report prepared in accordance with NI43-101 on the mineral resource which will be filed within
forty-five days of this release.
Classification |
Short Tons |
Sand
Short Tons |
Kaolin
Short Tons |
Halloysite
Short Tons |
Measured Resource |
5,720,000 |
4,378,000 |
702,000 |
226,000 |
Indicated Resource |
15,530,000 |
8,857,000 |
2,416,000 |
440,000 |
Inferred Resource |
21,260,000 |
13,235,000 |
3,119,000 |
667,000 |
Lamar Long, CPG, is a qualified person ("QP") for I-Minerals Inc. and has reviewed and approved the contents of this release
About I-Minerals Inc.
I-Minerals is developing multiple deposits of high purity, high value halloysite, quartz, potassium feldspar and kaolin at its
strategically located Helmer-Bovill property in north central Idaho.
This News Release includes certain "forward looking statements" within the meaning of the United States Private Securities
Litigation Reform Act of 1995. Without limitation, statements regarding potential mineralization and resources, exploration
results, and future plans and objectives of the Company are forward looking statements that involve various risks. Actual results
could differ materially from those projected as a result of the following factors, among others: changes in the world-wide price of
mineral market conditions, risks inherent in mineral exploration, risk associated with development, construction and mining
operations, the uncertainty of future profitability and uncertainty of access to additional capital.
Contact:
Barry Girling
877-303-6573 or 604-303-6573
Email: info@imineralsinc.com
Or visit our website at www.imineralsinc.com
Paul J. Searle, Investor Relations
877-303-6573 or 604-303-6573
Email: psearle@imineralsinc.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX
VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/43277