VANCOUVER, BC / ACCESSWIRE / November 24, 2020 / Skeena Resources Limited (TSX:SKE)(OTCQX:SKREF) ("Skeena" or the "Company") is pleased to report additional diamond drill core results from the Phase 1 combined campaign of definition and exploration drilling at the Eskay Creek Project ("Eskay Creek" or the "Project") located in the Golden Triangle of British Columbia. The Phase 2 infill program, focused upon resource category conversions for the Pre-Feasibility Study ("PFS") on open-pit constrained resources, is on-going with eleven drill rigs currently active. Reference images are presented at the end of this release as well as on the Company's website.
Eskay Creek Phase 1 Infill Drilling
21A Zone Highlights:
- 5.15 g/t Au, 21 g/t Ag (5.44 g/t AuEq) over 31.12 m (SK-20-420)
- 36.66 g/t Au, 7 g/t Ag (36.75 g/t AuEq) over 18.32 m (SK-20-421)
22 Zone Highlights to Date:
- 6.89 g/t Au, 122 g/t Ag (8.52 g/t AuEq) over 48.74 metres (SK-20-389)
- 3.11 g/t Au, 106 g/t Ag (4.52 g/t AuEq) over 29.60 m (SK-20-384)
- 1.39 g/t Au, 195 g/t Ag (3.99 g/t AuEq) over 86.57 m (SK-20-406)
- 1.99 g/t Au, 127 g/t Ag (3.68 g/t AuEq) over 80.69 m (SK-20-415)
- 2.97 g/t Au, 57 g/t Ag (3.73 g/t AuEq) over 39.80 m (SK-20-416)
- 2.51 g/t Au, 62 g/t Ag (3.33 g/t AuEq) over 59.50 m (SK-20-423)
Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70-100% of reported core lengths for the 21A and 21C Zones Apparent widths are reported for the 22 Zone due to the geometry of the mineralization and the orientation of the drill holes. Length weighted AuEq composites are constrained by geological considerations. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.
21A Zone Phase 1 Infill Intersects High Tenor Gold Mineralization
Phase 1 drilling within the 21A Zone continues to yield exceptional grades highlighted by recent intersections of 5.15 g/t Au, 21 g/t Ag (5.44 g/t AuEq) over 31.12 m, and 36.66 g/t Au, 7 g/t Ag (36.75 g/t AuEq) over 18.32 m (SK-20-420 and SK-20-421, respectively). The high-grade intersection in SK-20-421 includes a sub-interval with an extremely high gold grade of 147.50 g/t Au, <5 g/t Ag (147.50 g/t AuEq) over 3.00 m hosted within brecciated rhyolites, footwall to the Contact Mudstone. These new intercepts enhance the expected grades and widths of the 21A Zone when compared to historical intercepts of 2.34 g/t AuEq over 12.78 m and 1.62 g/t AuEq over 7.00 m (SK-19-165B and CAN89-088, respectively) in the vicinity (see section 10090N below).
Robust Grades and Widths Confirmed in 22 Zone Infill Drilling
The recently completed drilling in the 22 Zone continues to demonstrate the precious metal enrichment associated with an interpreted syn-volcanic feeder zone crosscutting the footwall rhyolite. The high-grade silver mineralization within this area is quite impressive as illustrated by intercepts of 1.39 g/t Au, 195 g/t Ag (3.99 g/t AuEq) over 86.57 m, which includes sub-intervals grading 1.84 g/t Au, 2,400 g/t Ag (33.84 g/t AuEq) over 1.10 m, and 2.77 g/t Au, 1,840 g/t Ag (27.30 g/t AuEq) over 1.24 m (SK-20-406). Zonation of Au-Ag ratios is evident throughout the 22 Zone when compared to 2020 Phase 1 drill hole SK-20-389 (released November 19, 2020) which intersected above average gold grades of 6.89 g/t Au, 122 g/t Ag (8.52 g/t AuEq) over 48.74 m (refer to Table 1 below).
Table 1: 2020 Phase 1 Drill Hole SK-20-389 - 22 Zone Detailed Au-Ag Results
SK-20-389
|
From (m)
|
To (m)
|
Core Length (m)
|
Au (g/t)
|
Ag (g/t)
|
AuEq (g/t)
|
TOTAL INTERCEPT
|
1.26
|
50.00
|
48.74
|
6.89
|
122
|
8.52
|
INCLUDING
|
15.50
|
17.00
|
1.50
|
10.85
|
108
|
12.29
|
AND
|
29.13
|
30.50
|
1.37
|
16.90
|
47
|
17.53
|
AND
|
30.50
|
32.00
|
1.50
|
18.65
|
21
|
18.93
|
AND
|
32.00
|
33.50
|
1.50
|
9.69
|
52
|
10.38
|
AND
|
33.50
|
35.00
|
1.50
|
22.70
|
432
|
28.46
|
AND
|
35.00
|
36.50
|
1.50
|
18.80
|
440
|
24.67
|
AND
|
40.00
|
41.00
|
1.00
|
15.30
|
132
|
17.06
|
AND
|
41.00
|
42.50
|
1.50
|
35.30
|
247
|
38.59
|
AND
|
45.50
|
47.00
|
1.50
|
13.95
|
31
|
14.36
|
About Skeena
Skeena Resources Limited is a junior mining company focused on developing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a robust Preliminary Economic Assessment in late 2019 and is currently focused on infill and exploration drilling at Eskay Creek to advance the project to Prefeasibility. Skeena is also exploring the past-producing Snip gold mine.
On behalf of the Board of Directors of Skeena Resources Limited,
Walter Coles Jr.
President & CEO
Contact Information
Investor Inquiries: info@skeenaresources.com
Office Phone: +1 604 684 8725
Company Website: www.skeenaresources.com
Qualified Persons
Exploration activities at the Eskay Creek Project are administered on site by the Company's Exploration Managers, Raegan Markel, P.Geo. and Adrian Newton, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.
Quality Assurance - Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company's Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.
Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater than 10,000 ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-element geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.
Cautionary note regarding forward-looking statements
Certain statements made and information contained herein may constitute "forward looking information" and "forward looking statements" within the meaning of applicable Canadian and United States securities legislation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet management's expectations. Forward-looking statements and information may be identified by such terms as "anticipates", "believes", "targets", "estimates", "plans", "expects", "may", "will", "could" or "would". Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.
Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.
Table 2: Eskay Creek Project 2020 Length Weighted Drill Hole Gold and Silver Composites:
Hole-ID
|
From (m)
|
To (m)
|
Core Length (m)
|
Au (g/t)
|
Ag (g/t)
|
AuEq (g/t)
|
Zone
|
SK-20-384
|
0.90
|
30.50
|
29.60
|
3.11
|
106
|
4.52
|
22
|
INCLUDING
|
5.00
|
6.50
|
1.50
|
4.86
|
707
|
14.29
|
22
|
SK-20-384
|
36.50
|
42.50
|
6.00
|
1.18
|
5
|
1.25
|
22
|
SK-20-385
|
1.30
|
19.00
|
17.70
|
2.56
|
44
|
3.15
|
22
|
INCLUDING
|
2.00
|
3.50
|
1.50
|
9.57
|
267
|
13.13
|
22
|
SK-20-395
|
128.75
|
140.50
|
11.75
|
1.76
|
22
|
2.05
|
21C
|
SK-20-396
|
124.01
|
135.90
|
11.89
|
1.79
|
22
|
2.08
|
21C
|
SK-20-399
|
127.00
|
130.00
|
3.00
|
1.75
|
28
|
2.12
|
21C
|
SK-20-400
|
117.53
|
130.50
|
12.97
|
2.16
|
17
|
2.39
|
21C
|
SK-20-401
|
122.09
|
129.00
|
6.91
|
1.42
|
9
|
1.54
|
21C
|
SK-20-402
|
115.63
|
131.30
|
15.67
|
14.15
|
29
|
14.55
|
21C
|
INCLUDING
|
121.50
|
122.88
|
1.38
|
18.15
|
32
|
18.58
|
21C
|
AND
|
122.88
|
124.00
|
1.12
|
61.20
|
125
|
62.87
|
21C
|
AND
|
124.00
|
125.00
|
1.00
|
22.20
|
68
|
23.11
|
21C
|
AND
|
125.00
|
125.50
|
0.50
|
18.65
|
104
|
20.04
|
21C
|
AND
|
125.50
|
126.00
|
0.50
|
24.40
|
56
|
25.15
|
21C
|
AND
|
126.00
|
126.50
|
0.50
|
21.50
|
33
|
21.94
|
21C
|
AND
|
126.50
|
127.00
|
0.50
|
77.50
|
37
|
77.99
|
21C
|
AND
|
127.00
|
128.00
|
1.00
|
23.00
|
6
|
23.08
|
21C
|
SK-20-403
|
129.50
|
135.50
|
6.00
|
3.50
|
51
|
4.18
|
21C
|
SK-20-404
|
1.22
|
3.50
|
2.28
|
1.03
|
6
|
1.12
|
22
|
SK-20-404
|
24.50
|
30.00
|
5.50
|
1.59
|
5
|
1.66
|
22
|
SK-20-405
|
7.57
|
10.00
|
2.43
|
1.88
|
5
|
1.95
|
22
|
SK-20-405
|
14.00
|
38.00
|
24.00
|
1.59
|
26
|
1.93
|
22
|
SK-20-405
|
62.00
|
81.50
|
19.50
|
1.54
|
37
|
2.03
|
22
|
SK-20-406
|
1.43
|
88.00
|
86.57
|
1.39
|
195
|
3.99
|
22
|
INCLUDING
|
69.90
|
71.00
|
1.10
|
1.84
|
2,400
|
33.84
|
22
|
AND
|
71.00
|
72.24
|
1.24
|
2.77
|
1,840
|
27.30
|
22
|
AND
|
73.00
|
74.00
|
1.00
|
1.28
|
680
|
10.35
|
22
|
AND
|
74.90
|
75.80
|
0.90
|
4.66
|
640
|
13.19
|
22
|
SK-20-411
|
152.00
|
155.50
|
3.50
|
2.32
|
363
|
7.15
|
21C
|
INCLUDING
|
153.33
|
153.83
|
0.50
|
3.29
|
791
|
13.84
|
21C
|
AND
|
153.83
|
154.48
|
0.65
|
6.64
|
1,255
|
23.37
|
21C
|
SK-20-411
|
173.00
|
192.00
|
19.00
|
3.00
|
231
|
6.08
|
21C
|
INCLUDING
|
177.50
|
179.00
|
1.50
|
13.30
|
467
|
19.53
|
21C
|
AND
|
179.00
|
180.00
|
1.00
|
3.89
|
1,325
|
21.56
|
21C
|
AND
|
181.00
|
182.00
|
1.00
|
3.78
|
1,105
|
18.51
|
21C
|
AND
|
182.00
|
183.00
|
1.00
|
4.83
|
390
|
10.03
|
21C
|
SK-20-412
|
182.30
|
195.75
|
13.45
|
3.39
|
68
|
4.29
|
21C
|
INCLUDING
|
183.30
|
184.60
|
1.30
|
9.19
|
210
|
11.99
|
21C
|
AND
|
184.60
|
185.40
|
0.80
|
16.35
|
107
|
17.78
|
21C
|
SK-20-413
|
182.50
|
185.70
|
3.20
|
2.92
|
554
|
10.31
|
21C
|
INCLUDING
|
184.00
|
185.05
|
1.05
|
7.36
|
1,560
|
28.16
|
21C
|
SK-20-413
|
188.50
|
194.10
|
5.60
|
4.74
|
211
|
7.55
|
21C
|
INCLUDING
|
190.67
|
191.17
|
0.50
|
4.57
|
618
|
12.81
|
21C
|
SK-20-414
|
3.69
|
20.20
|
16.51
|
2.50
|
235
|
5.63
|
22
|
SK-20-415
|
2.31
|
83.00
|
80.69
|
1.99
|
127
|
3.68
|
22
|
INCLUDING
|
3.51
|
4.72
|
1.21
|
5.17
|
441
|
11.05
|
22
|
AND
|
14.00
|
15.50
|
1.50
|
1.38
|
648
|
10.02
|
22
|
SK-20-416
|
0.20
|
40.00
|
39.80
|
2.97
|
57
|
3.73
|
22
|
SK-20-417
|
0.15
|
19.00
|
18.85
|
2.04
|
7
|
2.13
|
22
|
SK-20-417
|
22.00
|
38.50
|
16.50
|
3.05
|
6
|
3.13
|
22
|
INCLUDING
|
25.00
|
26.50
|
1.50
|
12.75
|
10
|
12.88
|
22
|
SK-20-418
|
0.12
|
22.00
|
21.88
|
1.84
|
9
|
1.96
|
22
|
SK-20-418
|
25.00
|
37.00
|
12.00
|
2.76
|
7
|
2.85
|
22
|
SK-20-418
|
65.50
|
70.00
|
4.50
|
1.08
|
5
|
1.15
|
22
|
SK-20-419
|
0.68
|
20.50
|
19.82
|
2.48
|
15
|
2.69
|
22
|
SK-20-419
|
28.00
|
37.10
|
9.10
|
0.90
|
7
|
1.00
|
22
|
SK-20-419
|
42.18
|
49.00
|
6.82
|
1.02
|
5
|
1.09
|
22
|
SK-20-419
|
56.50
|
61.00
|
4.50
|
1.22
|
5
|
1.29
|
22
|
SK-20-420
|
86.00
|
117.12
|
31.12
|
5.15
|
21
|
5.44
|
21A
|
INCLUDING
|
100.00
|
101.00
|
1.00
|
11.35
|
5
|
11.42
|
21A
|
AND
|
101.00
|
102.00
|
1.00
|
13.40
|
20
|
13.67
|
21A
|
AND
|
105.00
|
106.00
|
1.00
|
13.25
|
12
|
13.41
|
21A
|
AND
|
106.00
|
107.00
|
1.00
|
17.35
|
17
|
17.58
|
21A
|
AND
|
112.00
|
113.50
|
1.50
|
17.95
|
8
|
18.06
|
21A
|
AND
|
113.50
|
115.00
|
1.50
|
13.75
|
26
|
14.10
|
21A
|
SK-20-420
|
127.94
|
131.00
|
3.06
|
1.12
|
6
|
1.19
|
21A
|
SK-20-420
|
161.00
|
177.50
|
16.50
|
1.13
|
10
|
1.26
|
21A
|
SK-20-421
|
82.59
|
84.59
|
2.00
|
0.71
|
8
|
0.81
|
21A
|
SK-20-421
|
91.18
|
109.50
|
18.32
|
36.66
|
7
|
36.75
|
21A
|
INCLUDING
|
92.00
|
95.00
|
3.00
|
147.50
|
<5
|
147.50
|
21A
|
AND
|
95.00
|
96.00
|
1.00
|
82.70
|
14
|
82.89
|
21A
|
AND
|
96.00
|
97.50
|
1.50
|
27.60
|
11
|
27.75
|
21A
|
AND
|
105.00
|
106.50
|
1.50
|
20.70
|
5
|
20.77
|
21A
|
SK-20-421
|
117.00
|
124.00
|
7.00
|
0.65
|
74
|
1.63
|
21A
|
SK-20-421
|
174.06
|
186.90
|
12.84
|
1.68
|
8
|
1.79
|
21A
|
SK-20-422
|
12.00
|
20.50
|
8.50
|
2.59
|
7
|
2.68
|
22
|
SK-20-422
|
28.00
|
30.55
|
2.55
|
1.28
|
14
|
1.47
|
22
|
SK-20-422
|
34.75
|
56.00
|
21.25
|
1.68
|
24
|
2.00
|
22
|
INCLUDING
|
38.07
|
39.00
|
0.93
|
7.40
|
237
|
10.56
|
22
|
SK-20-423
|
10.50
|
33.00
|
22.50
|
3.23
|
10
|
3.36
|
22
|
INCLUDING
|
21.00
|
22.00
|
1.00
|
18.40
|
34
|
18.85
|
22
|
SK-20-423
|
37.50
|
97.00
|
59.50
|
2.51
|
62
|
3.33
|
22
|
INCLUDING
|
43.70
|
45.00
|
1.30
|
8.92
|
1,010
|
22.39
|
22
|
AND
|
90.75
|
91.74
|
0.99
|
11.15
|
15
|
11.35
|
22
|
AND
|
91.74
|
93.00
|
1.26
|
17.90
|
16
|
18.11
|
22
|
SK-20-426
|
125.00
|
129.00
|
4.00
|
1.00
|
12
|
1.16
|
21C
|
SK-20-426
|
132.00
|
137.45
|
5.45
|
1.17
|
117
|
2.73
|
21C
|
SK-20-426
|
147.00
|
150.00
|
3.00
|
1.68
|
5
|
1.75
|
21C
|
SK-20-427
|
0.95
|
5.00
|
4.05
|
0.48
|
61
|
1.29
|
21C
|
SK-20-427
|
19.00
|
24.00
|
5.00
|
0.72
|
32
|
1.15
|
21C
|
SK-20-427
|
41.90
|
47.50
|
5.60
|
0.50
|
66
|
1.38
|
21C
|
SK-20-427
|
50.50
|
53.50
|
3.00
|
1.19
|
293
|
5.10
|
21C
|
INCLUDING
|
51.24
|
52.40
|
1.16
|
2.31
|
671
|
11.26
|
21C
|
SK-20-428
|
0.00
|
5.00
|
5.00
|
0.38
|
87
|
1.54
|
21C
|
SK-20-428
|
68.50
|
79.00
|
10.50
|
3.76
|
30
|
4.16
|
21C
|
SK-20-429
|
0.80
|
6.50
|
5.70
|
1.15
|
82
|
2.24
|
21C
|
SK-20-429
|
25.79
|
48.50
|
22.71
|
0.99
|
66
|
1.88
|
21C
|
SK-20-429
|
66.00
|
71.95
|
5.95
|
0.97
|
30
|
1.36
|
21C
|
Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70-100% of reported core lengths for the 21A and 21C Zones Apparent widths are reported for the 22 Zone due to the geometry of the mineralization and the orientation of the drill holes. Length weighted AuEq composites are constrained by geological considerations. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.
Table 3: Mine Grid Drill Hole Locations and Orientations:
Hole-ID
|
Easting (m)
|
Northing (m)
|
Elevation (m)
|
Length (m)
|
Azimuth (°)
|
Dip (°)
|
SK-20-384
|
9,570.5
|
8,848.2
|
1,124.8
|
130.0
|
205.0
|
-66.1
|
SK-20-385
|
9,571.0
|
8,848.0
|
1,125.0
|
95.0
|
205.0
|
-50.0
|
SK-20-395
|
9,754.0
|
10,252.0
|
1,013.7
|
149.0
|
165.0
|
-66.1
|
SK-20-396
|
9,754.1
|
10,252.5
|
1,015.3
|
150.0
|
165.1
|
-72.2
|
SK-20-399
|
9,754.0
|
10,252.0
|
1,014.1
|
150.0
|
194.0
|
-77.9
|
SK-20-400
|
9,754.0
|
10,252.0
|
1,014.4
|
150.0
|
196.3
|
-73.6
|
SK-20-401
|
9,754.0
|
10,252.0
|
1,015.0
|
149.0
|
183.0
|
-58.9
|
SK-20-402
|
9,754.0
|
10,252.0
|
1,015.3
|
150.0
|
181.8
|
-69.1
|
SK-20-403
|
9,754.1
|
10,252.5
|
1,014.4
|
150.0
|
245.0
|
-78.1
|
SK-20-404
|
9,575.5
|
8,828.0
|
1,121.1
|
95.0
|
205.3
|
-70.0
|
SK-20-405
|
9,575.0
|
8,828.0
|
1,121.2
|
90.0
|
206.0
|
-86.5
|
SK-20-406
|
9,575.0
|
8,828.0
|
1,121.2
|
90.0
|
145.6
|
-72.5
|
SK-20-411
|
9,740.0
|
10,301.0
|
1,015.4
|
197.0
|
309.9
|
-83.0
|
SK-20-412
|
9,740.0
|
10,301.0
|
1,014.6
|
198.0
|
326.6
|
-80.1
|
SK-20-413
|
9,740.0
|
10,301.0
|
1,014.4
|
208.0
|
335.2
|
-76.0
|
SK-20-414
|
9,589.0
|
8,862.0
|
1,112.7
|
20.2
|
240.2
|
-89.8
|
SK-20-415
|
9,589.0
|
8,862.0
|
1,112.9
|
90.0
|
240.0
|
-89.5
|
SK-20-416
|
9,539.0
|
8,880.0
|
1,128.4
|
82.0
|
190.2
|
-82.1
|
SK-20-417
|
9,539.0
|
8,880.0
|
1,128.2
|
65.0
|
280.0
|
-50.1
|
SK-20-418
|
9,539.0
|
8,880.0
|
1,128.9
|
70.0
|
239.6
|
-60.0
|
SK-20-419
|
9,539.0
|
8,880.0
|
1,129.6
|
100.0
|
193.1
|
-50.0
|
SK-20-420
|
9,871.0
|
10,117.0
|
1,035.6
|
191.0
|
139.8
|
-67.9
|
SK-20-421
|
9,871.0
|
10,116.0
|
1,035.3
|
191.0
|
130.0
|
-65.2
|
SK-20-422
|
9,558.0
|
8,909.0
|
1,136.9
|
100.0
|
355.3
|
-89.6
|
SK-20-423
|
9,558.0
|
8,909.0
|
1,136.3
|
110.0
|
195.2
|
-76.1
|
SK-20-426
|
9,754.1
|
10,252.5
|
1,013.6
|
150.0
|
173.8
|
-76.0
|
SK-20-427
|
9,622.0
|
8,733.0
|
1,085.6
|
80.0
|
230.0
|
-55.0
|
SK-20-428
|
9,622.0
|
8,733.0
|
1,085.1
|
85.0
|
260.3
|
-56.4
|
SK-20-429
|
9,622.0
|
8,733.0
|
1,085.6
|
95.0
|
197.1
|
-67.2
|