Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Arbor Metals Plans Geophysical Survey at the Rakounga Gold Concession, Burkina Faso, West Africa

V.ABR

(TheNewswire)



Vancouver, Canada - TheNewswire – June 13 th , 2021 - Arbor Metals Corp. (the “ Company ”) (TSXV:ABR ) ( FWB:432) reports it is currently planning a geophysical survey at the Rakounga Gold Concession located 100 km north west of Ouagadougou, Burkina Faso, West Africa.

The survey will further test and define gold anomalies identified through geochemical programs conducted along a broad south west – north east trend, that extend from the permit’s northern boundary to workings located near its western boundary.

The survey will enhance critical data in areas of previous drilling, notably the Koaltenga and Porphyry zones identified by previous operators. Drilling in 2017 and 2018 established mineralization within the Koaltenga zone.

See following table for highlights:

Hole

From (m)

To (m)

Length (m)

g/t Au

RKG-17-RC-001

102

128

26

0.82

Including

108

110

2

4.11

Including

110

114

4

2.40

RKG-17-RC-002

108

140

32

1.01

Including

112

118

6

2.81

Including

120

122

2

5.65

RKG-17-RC-008

102

136

34

1.00

Including

126

130

4

5.57

RKG-18-RC-027

116

126

10

1.00

Including

118

120

2

2.67

RKG-18-RC-035

66

78

12

0.50

Including

74

76

2

2.00

* All reported results are intercept lengths and are not true widths.

The workings at Koaltenga feature broad intercepts containing zones running 4 to 6 grams Au suggesting a prominent primary structure which has permeated out into the surrounding schists and volcanic rocks. The program is also being designed test the Bouboulou 1 orpaillage as well as a number of significant soil geochemical anomalies occurring between the two zones.

Details regarding the survey scope and timeline will be made available in the coming weeks.


Click Image To View Full Size

Image 2: Rakounga gold concession, Burkina Faso, West Africa

Warren Robb P.Geo., is the designated Qualified Person as defined by National Instrument 43-101 and is responsible for, and has approved, the technical information contained in this release.

About the Rakounga Gold Project

The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty square kilometer area located along the Goren Greenstone Belt in central Burkina Faso. The Company, through its wholly owned subsidiary Kruger Gold Corp. (“ Kruger ”), holds the right to acquire up to a one-hundred percent interest in and to the Project, subject only to pre-existing royalty obligations. Kruger has control over operations conducted on the Project and will look to expand on historical drilling and survey work conducted on the Project.

For further information, contact Mark Ferguson, Chief Executive Officer, at info@arbormetalscorp.com , or visit the Company’s website at www.arbormetalscorp.com .

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to finalization of a work program at the Project, the anticipated timing for the commencement of such a program, and other factors or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.

Copyright (c) 2021 TheNewswire - All rights reserved.



Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today