Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Braveheart Announces Commencement of Preliminary Economic Assessment at Bull River Mine

V.CCMI

Calgary, Alberta--(Newsfile Corp. - February 9, 2022) - Braveheart Resources Inc. (TSXV: BHT) (OTCQB: RIINF) (FSE: 2ZR) ("Braveheart" or the "Company") is pleased to announce the commencement of a Preliminary Economic Assessment ("PEA") for its 100% owned Bull River Mine, near Cranbrook, B.C.

Braveheart has engaged JDS Energy & Mining Inc. ("JDS") to complete the PEA study. JDS is ideally suited to complete the work having been involved with the project under previous owners and having completed similar studies for junior and major mining companies in northern and western Canada. The Company expects to receive the completed study within approximately 120 days. The Bull River Mine is fully developed and dewatered with 21,000 meters of underground developments in terms of ramps, raises and drifting on mineralized structures on seven levels. The surface infrastructure includes a 700 tonne per day conventional mill with adjoining crushing facilities as well as offices and mine maintenance facilities. The property is connected to grid power and there is year-round access to the site by paved and all-weather roads.

The Company recently announced a 57% increase in copper metal at the Bull River project (see press release dated December 8, 2021). The increases are due to the inclusion of new drilling from 2020 and 2021, reinterpretation of the mineralized shapes and additional certificates and QAQC being applied. The new N.I. 43-101 compliant Technical Report was independently prepared by Moose Mountain Technical Services under the supervision of Sue Bird, P.Eng. A summary of the Mineral Resource is presented below in Table 1. The N.I. 43-101 Technical Report was filed on SEDAR on January 21, 2022.

Table 1: Summary of Bull River Mineral Resource - Effective Date December 1, 2021

Cutoff CuEq (%) In situ In situ Grades Metal
Tonnage Cu Eq. Cu Au Ag NSR Cu Au Ag
(Ktonnes) (%) (%) (gpt) (gpt) ($US) (000 lbs) (kz) (koz)
Indicated 0.9 2,261 2.132 1.796 0.422 15.3 155.29 89,545 30.6 1,113
Inferred 0.9 1,356 1.918 1.598 0.417 13.6 139.70 47,799 18.2 594

Mineral Resources Notes:

  1. The qualified person responsible for the mineral resource estimate is Sue Bird P.Eng of Moose Mountain Technical Services.
  2. The base case cut-off is an NSR value of CDN$65/tonne, based on Processing costs of CDN$30/tonne and Underground Mining costs of CDN$35/tonne.
  3. A minimum mining width of 2.0m is assumed.
  4. Mineral resources are based on a US$1,600/oz gold price, US$3.50/lb copper price and US$20/oz silver price and the following smelter terms: 96.25% payable Cu, 97.5% payable Au and 90% payable Ag;
  5. Forex of 0.79 USS:CDN$
  6. Treatment charges of US$5/tonne for Cu, Refining charges of US$0.005/lb Cu, US$8/oz for AuUS$0.5/oz Ag
  7. Transportation charges of US$100/tonne Cu concentrate
  8. Metallurgical recoveries have been estimated as 93% for Cu, 75% for Au, and 90% for Ag
  9. The mineral resource has been confined by a "reasonable prospects of eventual economic extraction" underground shape equating to an NSR cut-off of CDN$65/tonne with all material within this shape reported as the resource.
  10. The bulk density has been assigned values of 2.7 and 3.06 tonnes/m3 depending on mineralized domain.
  11. Rounding as required by reporting guidelines may result in summation differences.

Ian Berzins, President and CEO commented, "We look forward to working with JDS on completion of the PEA. JDS already has a good knowledge of the project and will be able to incorporate the results of the new Mineral Resource in the study. The study will provide our current stakeholders and the investment community with an independent evaluation of the potential of our advanced stage project."

Qualified person

The disclosure of technical or scientific nature in this news release has been reviewed and approved by Sue Bird, P.Eng. who serves as a Consultant to the Company and is a Qualified Person under the definition of National Instrument 43-101

About Braveheart Resources Inc.

Braveheart is a mining company primarily focused on two near-term copper production assets in Canada. Braveheart's main asset is the 100% owned Bull River Mine project (>135MM lbs of copper) near Cranbrook, British Columbia which has a Mineral Resource containing copper, gold and silver. Braveheart's latest acquisition is the 100% owned Thierry Mine project (>1,300MM lbs of copper) near Pickle Lake, Ontario which has a Mineral Resource containing copper, nickel, silver, palladium, platinum and gold.

Contact Information
Braveheart Resources Inc.
Ian Berzins
President & Chief Executive Officer
M: +1-403-512-8202
E: iberzins@braveheartresources.com
Website: www.braveheartresources.com

For more investor information, please contact Braveheart at:
Manish Grigo
Director, Corporate Development
M: +1-416-569-3292
E: mgrigo@braveheartresources.com

Caution Regarding Forward-Looking Information

This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, future work programs and objectives and expected results from such work programs. Forward-looking information necessarily involve known and unknown risks, including, without limitation, risks associated with general economic conditions; inability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favourable terms; and other risks.

Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information and the risks identified in the Company's continuous disclosure record. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this news release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this new release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/113310



Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today