Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Probe Metals Intersects 6.0 g/t Au Over 16.0 Metres in Expansion Drilling at Monique, Val-d'Or East Project, Quebec

T.PRB

Highlights:

  • Continued expansion along strike and depth at the Monique gold zones
  • Expansion drilling returned impressive intersections of 6.0 g/t Au over 16.0 metres, 5.8 g/t Au over 13.2 metres, 5.6 g/t Au over 10.0 metres, 3.7 g/t Au over 18.0 metres, 1.4 g/t Au over 39.1 metres and 1.1 g/t Au over 48.9 metres, all at shallow depths
  • Infill drilling continues to confirm resource, returning up to 1.0 g/t Au over 100.2 metres, 0.8 g/t Au over 75.6 metres, 1.2 g/t Au over 40.1 and 0.9 g/t Au over 44.9 metres near surface
  • 9 drills active on the VDE project including 8 on the Monique Gold Trend

TORONTO, March 15, 2022 (GLOBE NEWSWIRE) -- Probe Metals Inc. (TSX-V: PRB)(OTCQB: PROBF) (“Probe” or the “Company”) is pleased to provide additional results from the 2021 drill program on its 100%-owned Val-d’Or East Monique property (the “Property”) located near Val-d’Or, Quebec. Results from seventy-one (71) holes from the 2021 resource expansion and infill drilling program revealed significant, new gold mineralization along strike and at depth in the A, B, E, G, I, J and M gold zones east, southeast and south of the former Monique open pit mine (see figure 1). Results from 40 holes drilled in 2021 and over 80 holes drilled since the beginning of 2022 are still pending. All the holes released today were successful in intersecting gold mineralization where predicted by our 3D geological model and add confidence to the project’s gold resources. Selected highlights from the current results are presented below.

David Palmer, President and CEO of Probe, states: “The Monique property continues to outperform in its expansion program, particularly with the multiple high-grade intervals being returned from drilling. In addition to numerous thick, high-grade gold zones, all of the results released today are within 300 metres of the surface and can be accessed in the earlier mining operations. These results also bode well for deeper exploration of high-grade zones that can support underground operations and extend mine life. Infill programs are also demonstrating significant success and confirming the quality of the current resource while upgrading resource for the Pre-feasibility Study, which is in progress. Monique is quickly becoming a centre of gravity for the project and we currently have eight drills turning on this property to advance it as rapidly as possible.”

Expansion drilling holes released today were designed to test the extension of the known mineralization laterally to the east and at shallow depth. About forty (40) drill holes were designed to convert a proportion of the in-pit Monique resources of the inferred category into the indicated category. Infill and expansion drilling continue to show positive results, good continuity and, strike and depth expansion along the Monique gold zones.

Probe has initiated the largest drill program to date at Val-d’Or East totalling 150,000 metres. One of the main goals of the program is to convert inferred resource into indicated category. All results released today will be included in an updated resource for the Val-d’Or East project, which will form the basis of the prefeasibility study (PFS) expected to be completed in 2023. The PFS is an important step in advancing the project to production and work will run concurrently with environmental studies and permitting.

Selected drill results from holes MO-21-144 to 215 at the Monique Area drilling program are, as follows:

Hole Number From (m) To (m) Length (m) Gold (g/t) Zone / Resource
MO-21-149 289.8 293.8 4.0 12.2 A / Infill
Including 291.8 292.8 1.0 43.8 A / Expansion
MO-21-154 73.8 92.8 19.0 1.6 A / Expansion
Including 84.8 92.8 8.0 2.3 A / Expansion
MO-21-154 104.5 108.0 3.5 5.3 Below Zone A
Including 105.5 106.0 0.5 20.1 Below Zone A
MO-21-156 66.5 77.4 10.9 1.4 A / Expansion
MO-21-156 96.1 107.7 11.6 1.3 Below Zone A
MO-21-156 116.2 121.5 5.3 5.8 A / Expansion
Including 116.8 117.4 0.6 48.0 A / Expansion
MO-21-157 57.1 58.1 1.0 33.3 A / Expansion
MO-21-158 26.7 44.7 18.0 3.7 E / Expansion
Including 40.8 41.7 0.9 22.9 E / Expansion
MO-21-160 95.1 110.5 15.4 1.1 E / Expansion
MO-21-161 60.6 75.1 14.5 1.0 E / Expansion
MO-21-163 83.1 85.9 2.8 5.2 E / Expansion
MO-21-164 207.5 208.9 1.4 10.5 B / Expansion
MO-21-167 41.0 54.5 13.5 1.1 J / Infill
MO-21-167 99.7 103.7 4.0 5.2 G / Infill
Including 99.7 100.7 1.0 16.3 G / Infill
MO-21-169 67.8 113.3 45.5 0.6 J / Infill
MO-21-171 27.7 67.8 40.1 1.2 J / Infill
MO-21-177 184.2 198.7 14.5 2.5 A / Infill
MO-21-177 197.7 198.7 1.0 29.7 A / Infill
MO-21-180 116.3 134.5 18.2 1.6 A / Infill
Including 129.0 132.0 3.0 5.9 A / Infill
MO-21-183 142.8 156.5 13.7 2.3 M / Expansion
Including 150.8 151.8 1.0 16.7 M / Expansion
MO-21-187 72.1 87.0 14.9 2.1 I / Expansion
Including 74.0 74.9 0.9 23.0 I / Expansion
MO-21-188 35.0 78.5 43.5 0.8 B / Infill
MO-21-190 38.9 87.8 48.9 1.1 B / Expansion
Including 82.7 83.4 0.7 18.9 B / Expansion
MO-21-190 188.0 196.0 8.0 2.1 M / Expansion
MO-21-193 56.7 105.4 48.7 0.7 B / Infill
MO-21-193 92.8 103.4 10.6 1.8 B / Infill
MO-21-195 16.7 61.6 44.9 0.9 B / Infill
Including 51.8 55.1 3.3 5.0 B / Infill
MO-21-195 208.0 218.0 10.0 5.6 M / Expansion
Including 209.0 210.0 1.0 39.9 M / Expansion
MO-21-196 104.1 114.7 10.6 1.7 M / Expansion
MO-21-198 106.3 141.70 35.4 1.0 B / Infill
MO-21-198 272.6 288.6 16.0 6.0 M / Expansion
Including 276.1 276.8 0.7 103.0 M / Expansion
MO-21-201 24.2 124.4 100.2 1.0 B / Infill
Including 103.8 104.4 0.6 29.0 B / Infill
MO-21-206 214.3 230.3 16.0 1.8 M / Expansion
Including 218.8 223.6 4.8 4.6 M / Expansion
MO-21-207 114.3 127.5 13.2 5.8 A / Expansion
Including 114.3 115.3 1.0 68.8 A / Expansion
MO-21-211 28.6 104.2 75.6 0.8 E+A / Expansion
MO-21-212 65.2 104.3 39.1 1.4 A / Expansion
Including 78.0 83.0 5.0 5.9 A / Expansion
MO-21-215 107.9 140.5 32.6 0.6 A / Expansion

(1) All the new analytical results reported in this release and in this table, are presented in core length and cut to 100 g/t Au when needed. True width is estimated between 65 to 95 % of core length. Only intercepts above 15.0 g/t Au * m are reported.

Figure 1: Surface Map – Monique Gold Trend new drilling
https://www.globenewswire.com/NewsRoom/AttachmentNg/84717454-ff85-4e6d-b4fd-6d76739129a0

About the Monique Property:
The Monique property is located 25 km east of Val-d’Or, in Quebec, and consists of 21 claims and one mining lease covering a total area of 5.5 square kilometres in Louvicourt township. The property hosts a current measured and indicated mineral resource of 13,619,000 tonnes at a grade of 1.54 g/t for 672,800 ounces of gold and inferred mineral resource of 11,733,000 tonnes at a grade of 1.78 g/t for 671,400 ounces of gold (source: Probe Metals NI 43-101 Technical Report Val-d’Or East Project – June 2021). The Property is part of the Company’s Val-d’Or East Project and the consolidated land package stands at 436 square kilometres. Val-d’Or East is situated in a politically stable and low-cost mining environment that hosts numerous active producers and mills.

Geology
Gold mineralization on the Monique property is mainly associated with three deformation zones that cross the property with an orientation of 280° and a 75°- 80° dip to the north. Gold mineralization is defined by a network of quartz/tourmaline/carbonate veins and veinlets with disseminated sulphides in the altered wall rocks. A total of 16 gold zones have been discovered on the property, to-date. Some mineralized zones have been defined from surface to a depth of 600 metres and vary in width from 1 metre to up to 100 metres. Mineralized structures extend laterally up to 900 metres.

Past Production
The Monique open pit mine began commercial production in 2013 and ceased production at the end of January 2015. A total of 0.58 Mt of mineralized material was extracted at a grade of 2.53 g/t Au, from the surface to 100 metres depth for a total of 45,694 ounces of gold.

Qualified Person:
The scientific and technical content of this press release has been reviewed, prepared and approved by Mr. Marco Gagnon, P.Geo, who is a "Qualified Person" within the meaning of NI 43-101, and Executive Vice-President and a director of Probe.

Quality Control:
During the last drilling program, assay samples were taken from the NQ core by sawing the drill core in half, with one-half sent to a certified commercial laboratory and the other half retained for future reference. A strict QA/QC program was applied to all samples, which includes insertion of mineralized standards and blank samples for each batch of 20 samples. The gold analyses were completed by fire-assays with an atomic absorption finish on 50 grams of materials. Repeats were carried out by fire-assay followed by gravimetric testing on each sample containing 3.0 g/t gold or more. Total gold analyses (Metallic Sieve) were carried out on the samples which presented a great variation of their gold contents or the presence of visible gold.

About Probe Metals:
Probe Metals Inc. is a leading Canadian gold exploration company focused on the acquisition, exploration and development of highly prospective gold properties. The Company is committed to discovering and developing high-quality gold projects, including its key asset the multimillion-ounce Val-d’Or East Gold Project, Québec. The Company is well-funded and controls a strategic land package of approximately 1,500-square-kilometres of exploration ground within some of the most prolific gold belts in Québec. The Company was formed as a result of the $526M sale of Probe Mines Limited to Goldcorp. Eldorado Gold Corporation currently owns approximately 10.4% of the Company.

On behalf of Probe Metals Inc.,

Dr. David Palmer,
President & Chief Executive Officer

For further information:

Please visit our website at www.probemetals.com or contact:

Seema Sindwani
Director of Investor Relations
info@probemetals.com
+1.416.777.9467

Forward-Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan” and include, but are not limited to, statements with respect to: the results of the PEA, including future Project opportunities, future operating and capital costs, closure costs, AISC, the projected NPV, IRR, timelines, permit timelines, and the ability to obtain the requisite permits, economics and associated returns of the Project, the technical viability of the Project, the market and future price of and demand for gold, the environmental impact of the Project, and the ongoing ability to work cooperatively with stakeholders, including the local levels of government. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.


Primary Logo