Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Purepoint Uranium Initiates ZTEM Survey at Hook Lake Joint Venture

V.PTU

Toronto, Ontario--(Newsfile Corp. - July 12, 2022) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") today announced the commencement of a deep sensing Z-Axis Tipper Electromagnetic (ZTEM) airborne survey over the northern portion of the Carter Corridor at the Hook Lake Joint Venture; a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%). The Hook Lake Project lies on the southwestern edge of Saskatchewan's Athabasca Basin in the Patterson Uranium District, Saskatchewan, Canada and is adjacent to and on trend with high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

ZTEM technology, exclusive to Geotech Ltd., is used to measure the variations in naturally occurring electromagnetic (EM) fields produced by thunderstorms around the globe. The variations in the EM fields help detect the resistivity contrast in deeply buried rock structures that may have controlled uranium deposition.

The Carter corridor is a long lived, reactivated fault zone that lies between the Clearwater Domain granitic intrusives to the west and runs parallel to the Patterson structural corridor to the immediate east. The 25-kilometre strike length of the Carter structural/conductive corridor is almost entirely located within the Hook Lake JV project.

Highlights

  • Purepoint will be conducting an airborne ZTEM Survey covering the northern portion of the Carter and Patterson corridors.
  • The survey will cover 653 kilometres of flight at 300 metre spacings.
  • Results and interpretations should be complete later this summer.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3218/130538_944397aa349d49e4_002.jpg

Figure 1: Hook Lake Map

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/3218/130538_944397aa349d49e4_002full.jpg

Hook Lake - The Carter Corridor

The Hook Lake JV Project is owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and Purepoint Uranium Group Inc. (21%) as operator and consists of nine claims totaling 28,598 hectares situated in the southwestern Athabasca Basin. The Hook Lake JV Project is considered one of the highest quality uranium exploration projects in the Athabasca Basin due to its location along the prospective Patterson Lake trend and the relatively shallow depth to the unconformity.

The Patterson Lake area was recently flown by an airborne gravity survey (Boulanger, Kiss and Tschirhart, 2019) that was funded by the Targeted Geoscience Initiative (TGI), a collaborative federal geoscience program. The gravity results show the southern portion of the Carter corridor as being associated with the same gravity high response as the Triple R and Arrow uranium deposits. The gravity low response west of the Carter corridor reflects the geologically younger, Clearwater Domain intrusions. The TGI (Potter et al., 2020) consider the Clearwater Domain intrusions as being high-heat-producers that warmed and circulated hydrothermal fluids over the structural corridors. Prolonged interaction of oxidized uranium-bearing fluids with basement rocks via reactivated faults is thought to have formed the high-grade uranium deposits.

Purepoint completed three drill holes in the southern portion of the Carter corridor (HK08-01 to 03) during 2008. HK08-01 intersected very strong sericite and silica hydrothermal alteration and returned a maximum of 17 ppm U within basement rock but missed the conductor source. HK08-02 returned locally elevated radioactivity from 20 to 30 metres below the unconformity while HK08-03 intersected 60 metres of intense hydrothermal hematite alteration below the unconformity.

About Purepoint

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline of 12 advanced projects in Canada's Athabasca Basin. In addition to its flagship joint venture project at Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake, Purepoint also holds ten, 100% owned projects with proven uranium exploration targets. With an aggressive exploration program underway on multiple projects, Purepoint is emerging as the preeminent uranium explorer in the world's richest uranium district.

Scott Frostad BSc, MASc, PGeo, Purepoint's Vice President, Exploration, is the Qualified Person responsible for technical content of this release.

For more information, please contact:

Chris Frostad, President & CEO
Phone: (416) 603-8368
Email: cfrostad@purepoint.ca

For additional information please visit our new website at https://purepoint.ca, our Twitter feed: @PurepointU3O8 or our LinkedIn page @Purepoint-Uranium.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press release.

Disclosure regarding forward-looking statements

This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and expressly qualified in their entirety by this notice.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/130538

Tags:


Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today