Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

T2 Metals Intersects Copper-Zinc Massive Sulphide at the Sherridon VHMS Project, Manitoba

V.TWO

Twelve Hole Drill Program Completed

Vancouver, British Columbia--(Newsfile Corp. - November 1, 2023) - T2 Metals Corp. (TSXV: TWO) (OTCQB: AGLAF) (WKN: A2DR6E) ("T2" or the "Company") is pleased to announce the safe and successful completion of a 12-hole drill program at the Sherridon copper-zinc project in west-central Manitoba. Sherridon is a well known VHMS camp in the Flin Flon — Snow Lake district, with both a significant mining history and substantial copper-rich historical resources calculated in 2010.

The program was very successful, with 9 of the 12 holes intersecting intervals with greater than 20% chalcopyrite (Cu) or sphalerite (Zn) including numerous intervals of semi-massive or massive sulphide (Figure 1). The final holes from the program are now being logged and sampled by T2 Metals personnel, with half core being progressively dispatched for assay. Assay results remain pending and will be announced as they come available.

Twelve holes for a total of 1,500 metres were completed (Table 1), testing a total strike length of 1,600 metres within and between the Cold Lake and Lost Lake deposits (Table 2). Near surface targets were prioritised on un-drilled and under drilled sections, to better quantify the near-term mining opportunity, understand wall rock conditions, and to provide sample for mineral characterization and metallurgical testing. While data is available, drill core from past programs has not been successfully recovered from either deposit to date.

Mark Saxon, CEO of T2 Metals Corp., said, "This successful first drilling program is a milestone for both T2 Metals and the Sherridon project. Our team achieved a very high hit rate of near surface massive and semi-massive copper-zinc mineralization. In the process, we have established ourselves as part of the Sherridon community, and collaborated with the Kiciwapa Cree to build both assets and skills. We look forward to sharing drill results as they come available over coming months and thank Quesnel Bros. Diamond Drilling Ltd for their delivery of a timely and professional program."

The drilling program was well supported by members of the Kiciwapa Cree, part of the Mathias Colomb First Nation. The Company has established an Exploration Agreement with the Kiciwapa Cree to ensure maximum benefit from T2 Metals' investment at Sherridon is captured within the region. With the support of the community, semi-permanent core and storage facilities have been established in the Sherridon village (Figure 3).

Prior to the recently completed program, the Sherridon district had not seen drilling for more than a decade, due a sustained period of low metal prices when the previous operator was active. T2 Metals acquired and reprocessed past exploration data that includes more than 400 drill holes and extensive geophysical data and has identified multiple opportunities for additional copper-zinc discoveries.

The presence of year-round road and operational rail access to the project, near-surface historical resources, and a local community, enables both cost effective exploration and provides the potential for near term production.

The 2023 drilling program by T2 Metals targeted the Lost and Cold historical resource areas (see Figure 2) where high grade copper (Cu) and zinc (Zn) rich mineralization has previously been discovered from surface to more than 250 metres vertical depth. These two prospects lie less than 2km from the Sherritt Gordon East and West mines, where 7.74 million tonnes were mined at an average grade of 2.46% Cu, 2.84% Zn, 0.6 g/t Au and 33 g/t Ag (Goetz & Froese, 1981) between 1931 and 1951. Other resource areas will be drill tested in 2024.

Lost and Cold mineralization comprise a continuously mineralized horizon over a strike length of approximately 1.8 km. The Lost and Cold prospects were the subject of investment by HudBay Minerals Inc from 2009 - 2012 that included metallurgical drilling with a view to open pit mining and subsequent processing in Flin Flon.

Sherridon is a large volcanic hosted massive sulphide (VHMS) camp with an extensive mining history and multiple copper-zinc-silver-gold historical resources and occurrences. The project is well-served by all weather roads, rail and the Sherridon/Cold Lake village.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7326/185837_t2metalsfig1_550.jpg

Figure 1: Mineralization textures (copper-zinc) from Sherridon drill program, 2023.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7326/185837_t2metalsfig1.jpg

HOLE_ID EAST NORTH RL DEPTH INCLINATION AZIMUTH
SHN23001 367008 6111502 328 134.0 -45 220
SHN23002 367060 6111471 312 125.0 -55 220
SHN23003 367093 6111332 328 86.0 -52 220
SHN23004 367114 6111350 328 125.0 -50 220
SHN23005 367298 6111117 320 164.0 -45 220
SHN23006 367378 6111198 321 179.0 -45 220
SHN23007 367287 6111193 320 125.0 -45 220
SHN23008 366969 6111496 320 134.0 -60 220
SHN23009 366374 6112179 325 104.0 -45 220
SHN23010 366421 6112228 325 131.0 -55 220
SHN23011 367255 6111149 333 77.0 -45 220
SHN23012 367317 6111224 330 116.0 -52 220

Table 1: T2 Metals Drill Coordinates, 2023 (Coordinates given in UTM Zone 14N, NAD83).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7326/185837_t2metalsfig2_550.jpg

Figure 2: Regional Map of the Cold and Lost Prospects, Sherridon, Manitoba

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7326/185837_t2metalsfig2.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7326/185837_t2metalsfig3_550.jpg

Figure 3: New Core Yard at Sherridon, Manitoba

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7326/185837_t2metalsfig3.jpg

SHERRIDON PROJECT — INDICATED RESOURCES (2010)
Mining Method Million Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t) Copper
(M lbs)
Zinc
(M lbs)
Gold
(oz)
Silver
(oz)
Open Pit 5.32 0.8 1.23 0.34 7.2
Underground 1.24 1.04 1.18 0.48 8.2
Total Indicated 6.55 0.85 1.22 0.37 7.4 122.1 M lb 176.3 M lb 77,192 oz 1.56 M oz
SHERRIDON PROJECT — INFERRED RESOURCES (2010)
Open Pit 12.24 0.62 0.77 0.26 5.3
Underground 3.62 0.91 1.08 0.32 7.4
Total Inferred 15.86 0.69 0.84 0.28 5.8 239.9 M lb 294.0 M lb 141,245 oz 2.94 M oz

Indicated and Inferred resources for Bob, Lost, Cold, and Jungle deposits. Mineral Resource estimates are based upon Bloom, L., Healy, T., Giroux, G., Halo Resources Ltd. 2010, Sherridon VMS Property, Technical Report NI43-101 — November 22, 2010, which is available at www.sedar.com.

Mineral Resources were estimated at a net smelter return (NSR) cut-off of US$20 per tonne and US$45 per tonne for open pit and underground respectively. Metal prices used were US$3.00/lb copper, US$1.05/lb zinc, US$1,000/oz gold and US$15.00/oz silver. Metallurgical recovery factors assumed were 92% for copper, 83% for zinc, 65% for gold and 57% for silver.

The Mineral Resource estimates were prepared under the direction of, and dated and signed by, a Qualified Person as defined in accordance with NI 43-101 and CIM Definition Standards. The data, information, estimates, conclusions and recommendations were consistent with the information available at the time of preparation. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101 and recognized by Canadian securities laws. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be upgraded to mineral reserves. Aguila has received the exploration and drilling data, but has not independently confirmed the Mineral Resource estimates. Halo has indicated that no Mineral Resource estimates were completed subsequent to those provided in Table 1.

Table 2: Sherridon Historical Resource Estimate, 2010

T2 Metals is focused on copper, nickel and lithium acquisition, exploration and development within the major mining belts of western North America. The Company continues to target under-explored areas, including the Sherridon, Lida and Cora projects where post-mineralization cover masks areas of high geological prospectivity in the vicinity of major mines.

Any references to the terms "ore minerals", "mineralization" or "mineralized zones" are purely for descriptive purposes and are not intended to be interpreted as or relied upon for any resource or economic evaluation of the project at this time. Although historic exploration data was generated by reputable companies applying practice of the day, T2 Metals Corp cannot verify the data or determine the quality assurance and quality control measures applied in generating the data. Furthermore, there is no guarantee that the exploration history is fully captured. Additional drilling may have been undertaken, however the Company has not been made aware of or obtained additional data. Accordingly, the Company cautions that the exploration data reported in this news release may not be reliable. Readers are cautioned that a "qualified person" as defined by National Instrument 43-101 has not completed sufficient work to be able to verify the historical information, and therefore the information should not be relied upon.

The qualified person for the Company's projects, Mr. Mark Saxon, the Company's Chief Executive Officer, a Fellow of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists, has reviewed and approved the contents of this release.

About T2 Metals Corp (TSXV: TWO) (OTCQB: AGLAF) (WKN: A2DR6E)

T2 Metals Corp is an emerging copper and precious metal company enhancing shareholder value through exploration and discovery. T2 is focused on the Sherridon Project in Manitoba, the Lida Project in Nevada, and the Cora Project in Arizona.

ON BEHALF OF THE BOARD,

"Mark Saxon"

Mark Saxon
President & CEO

For further information, please contact:

t2metals.com

1305 - 1090 West Georgia St., Vancouver, BC, V6E 3V7
info@t2metals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Certain information set out in this news release constitutes forward-looking information. Forward looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "intend", "could", "might", "should", "believe" and similar expressions. Forward-looking statements are based upon the opinions and expectations of management of the Company as at the effective date of such statements and, in certain cases, information provided or disseminated by third parties. Although the Company believes that the expectations reflected in forward-looking statements are based upon reasonable assumptions, and that information obtained from third party sources is reliable, they can give no assurance that those expectations will prove to have been correct. Readers are cautioned not to place undue reliance on forward-looking statements.

These forward-looking statements are subject to a number of risks and uncertainties. Actual results may differ materially from results contemplated by the forward-looking statements. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. Such risks include uncertainties relating to exploration activities. When relying on forward-looking statements to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and should not place undue reliance on such forward-looking statements. The Company does not undertake to update any forward-looking statements, except as may be required by applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/185837