Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Forum Energy: Camp Construction Begins; 10,000 Metre Drill Program to Commence Soon at the Aberdeen Uranium Project, Thelon Basin, Nunavut

V.FMC

Vancouver, British Columbia--(Newsfile Corp. - May 21, 2024) - Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) ("Forum" or the "Company") announces it has commenced construction of its drill camp on the Aberdeen Uranium Project, located adjacent to Orano's 133 million pound Kiggavik uranium deposit in the Thelon Basin, Nunavut. Forum's contactor, Inuit-owned Peter's Expediting Ltd. completed 11 trips of drills, camp and other equipment by sled train to the site located 120 kilometres west of Baker Lake, Nunavut. The snow has cleared and Discovery Mining Services of Yellowknife, NWT has commenced construction of a 30-person drill camp to support a 10,000 metre drill program by mid-June. Follow-up drilling will focus on building a resource identified by four holes drilled over a 200-metre strike length into the Tatiggaq deposit in 2023 which intersected up to 2.25% U3O8 over 11.1 metres. The structure hosting uranium mineralization at Tatiggaq extends for 1.5 kilometres within a highly altered uranium mineralized system.

Dr. Rebecca Hunter, Vice President, Exploration commented, "Forum's geological team is evaluating the recent Ambient Noise Tomography (ANT) results to establish initial targets for the June drill program."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4908/209912_969bbecc74ad79cf_003.jpg

Figure 1 Fuel tanks, sea containers with drills, camp materials and other equipment were successfully transported by sled train to the site of the Aberdeen drill camp by Inuit-owned contractor, Peter's Expediting Ltd. A 10 person crew with helicopter support from Forest Helicopters, Kenora, Ontario has been mobilized to build the camp for this summer's drill program.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4908/209912_969bbecc74ad79cf_003full.jpg

About Forum Energy Metals

Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) is focused on the discovery of high grade unconformity-related uranium deposits in the Athabasca Basin, Saskatchewan and the Thelon Basin, Nunavut.

For further information: https://www.forumenergymetals.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Richard J. Mazur, P.Geo.
President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

Rick Mazur, P.Geo., President & CEO
mazur@forumenergymetals.com
Tel: 604-630-1585

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/209912

Tags: