Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Jaguar Mining Reports Financial Results for the Second Quarter 2024

T.JAG

TORONTO, ON / ACCESSWIRE / August 7, 2024 / Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX:JAG)(TCQX:JAGGF) announces financial results for the second quarter ended June 30, 2024. All figures are in US Dollars, unless otherwise expressed.

Second Quarter Highlights

  • Gold production was 16,829 ounces, marginally higher than the 16,750 ounces produced in the second quarter of 2023, reflecting a 21% increase in grade offset by a 16% reduction in ore tonnes processed.

  • Gold sold was 19,022 ounces representing a 12% increase from the 16,917 ounces sold in the second quarter of 2023. Realized gold prices for the quarter were $2,354 per ounce, 20% higher than the $1,962 per ounce realized in the second quarter of 2023.

  • Cash operating costs per ounce¹ decreased by 9% to $1,046 per ounce of gold sold from $1,150 per ounce of gold sold in the second quarter of 2023. All-in sustaining costs (AISC) per ounce¹ decreased by 15% to $1,517 per ounce of gold sold from $1,781 per ounce of gold sold in the second quarter of 2023. The decrease reflects the volume impact of 12% higher ounces sold and $2 million lower sustaining capital expenditures in the current quarter compared to the same quarter of 2023.

  • Revenue for the quarter was $44.8 million, 35% higher than the $33.2 million in revenue for the second quarter of 2023 driven by higher ounces-sold volume and higher realized gold prices year-over-year.

  • Operating costs for the quarter were $19.9 million compared to operating costs of $19.5 million in the second quarter of 2023.

  • Net income for the quarter was $13.5 million ($0.17 per share) compared to a loss of $1.1 million (loss of $0.02 per share) in the second quarter of 2023.

  • Free cash flow 1 for the quarter was $15.2 million, which represents a significant increase compared to free cash flow of $2.4 million in the second quarter of 2023. This is calculated as operating cash flow plus asset retirement obligation expenditures, less sustaining capital. Free cash flow per ounce 1 sold for the quarter was $801 per ounce of gold sold compared to $141 per ounce of gold sold in the second quarter of 2023.

Cash position and working capital 1

  • As of June 30, 2024, the Company had cash and cash equivalents of $37.4 million, compared to $22.0 million in cash and cash equivalents as of December 31, 2023.

  • This $15.4 million increase in cash year to date mainly reflects higher realized gold prices and higher average grades with positive margins on gold sales during the first half of 2024, in addition to a $4 million collection on an account receivable.

  • As of June 30, 2024, working capital was $28.4 million, compared to working capital of $12.6 million as of December 31, 2023.

Vern Baker, President and CEO of Jaguar, stated : "I am very pleased with the performance of our operations this quarter. At both of our mines we are focusing on the development of new mining areas (BA-Torre at Pilar, and Faina at Turmalina) while producing profitable ounces. Overall, our production increased slightly year-over-year and quarter-over-quarter. At Pilar production returned to above 10,000 ounces for the quarter. At Turmalina the team is adapting their focus to utilize higher grades in older orebodies while developing new orebodies in the Faina zone. Both mines realized an increase in grade. At Pilar higher grade ore from our BA-Torre zone and the LPA section of our main zone contributed to the grade increase. The team at Pilar has been pushing development headings on five separate sub-levels to start building a production platform in the BA-Torre structure. During the quarter, Turmalina achieved a milestone with the first tonnage from the Faina zone being milled. Ore generated by development was processed at the Turmalina plant, which produced 414 gold ounces as the first production contributed from Faina. This also contributed to an increase in head grade at Turmalina. Continuing development and first stope production from the Faina zone is expected in the second half of 2024.

I am also pleased with our financial results this quarter. With the tailwinds of gold prices and FX on the Brazilian Real, it was a very good quarter for us. With gold sales exceeding production as timing allowed the reduction of inventory, we realized robust revenue and free cash flow this quarter. Our all-in sustaining costs also decreased by over $250 per ounce during the quarter. While we are developing two areas in our operating mines and working on bringing our Onças de Pitangui property into production, we also increased our cash balance by $11.0 million. We now have $37.4 million in cash and cash equivalents and no long term debt. We are well positioned to fund our future growth plans and ongoing exploration programs.

Going forward, we expect production at Turmalina to gradually increase as additional tonnes from Faina start to impact the production rate. At Pilar, we expect production to remain consistent with the current quarter for the remainder of 2024. Our team will continue to focus on developing sufficient access in the BA-Torre zone, with the goal of achieving consistent production from this area in 2025.

Second Quarter 2024 Results

($ thousands, except where indicated)


Three months ended



Six months ended





June 30



June 30





2024



2023



2024



2023


Financial Data

















Revenue


$

44,779



$

33,192



$

77,356



$

69,036


Operating costs



19,897




19,462




38,212




40,074


Depreciation



7,828




6,220




14,989




11,986


Gross profit



17,054




7,510




24,155




16,976


Net income (loss)



13,469




(1,101

)



16,295




1,371


Per share ("EPS")



0.17




(0.02

)



0.21




0.02


EBITDA



25,159




7,415




37,174




18,462


Adjusted EBITDA 1,2



22,381




10,554




33,701




23,039


Adjusted EBITDA per share 1,2



0.28




0.15




0.43




0.32


Cash operating costs (per ounce sold) 1



1,046




1,150




1,101




1,115


All-in sustaining costs (per ounce sold) 1



1,517




1,781




1,558




1,672


Average realized gold price (per ounce) 1



2,354




1,962




2,228




1,922


Cash generated from operating activities



20,766




9,973




28,875




20,338


Free cash flow 1



15,233




2,378




18,739




5,723


Free cash flow (per ounce sold) 1



801




141




540




159


Sustaining capital expenditures 1



6,301




8,306




11,406




15,519


Non-sustaining capital expenditures 1



4,505




3,539




7,642




5,750


Total capital expenditures



10,806




11,845




19,048




21,269


1 Average realized gold price, sustaining and non-sustaining capital expenditures, cash operating costs and all-in sustaining costs, free cash flow, EBITDA and adjusted EBITDA, and adjusted EBITDA per share are non-GAAP financial performance measures with no standard definition under IFRS. Refer to the Non-GAAP Financial Performance Measures section of the MD&A.

2 Adjusted EBITDA excludes non-cash items such as impairment, foreign exchange, stock-based compensation and write downs. For more details refer to the Non-GAAP Performance Measures section of the MD&A.

Non-GAAP Performance Measures




Three months ended



Six months ended





June 30



June 30





2024



2023



2024



2023


Operating Data

















Gold produced (ounces)



16,829




16,750




33,006




34,906


Gold sold (ounces)



19,022




16,917




34,714




35,925


Primary development (metres)



1,273




1,552




2,202




2,810


Exploration development (metres)



679




403




1,157




619


Secondary development (metres)



1,130




1,238




2,212




2,644


Definition, infill, and exploration drilling (metres)



9,229




10,420




16,072




22,325


The Company has included the following Non-GAAP performance measures in this document: cash operating costs per ounce of gold sold, all-in sustaining costs per ounce of gold sold, average realized gold price (per ounce of gold sold), sustaining capital expenditures, non-sustaining capital expenditures, adjusted operating cash flow, free cash flow, earnings before interest, taxes, depreciation and amortization (EBITDA), adjusted EBITDA and working capital. These Non-GAAP performance measures do not have any standardized meaning prescribed by IFRS and, therefore, may not be comparable to similar measures presented by other companies.

The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance. Accordingly, they are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. More specifically, Management believes that these figures are a useful indicator to investors and management of a mine's performance as they provide: (i) a measure of the mine's cash margin per ounce, by comparison of the cash operating costs per ounce to the price of gold; (ii) the trend in costs as the mine matures; and (iii) an internal benchmark of performance to allow for comparison against other mines. The definitions of these performance measures and reconciliation of the Non-GAAP measures to reported IFRS measures are outlined below.

Reconciliation of sustaining capital to non-sustaining capital expenditures 1

($ thousands)


Three months ended



Six months ended





June 30



June 30





2024



2023



2024



2023


Sustaining capital 1

















Primary development


$

4,124



$

5,543



$

7,844



$

10,704


Brownfield exploration



312




488




640




787


Mine-site sustaining



1,764




2,152




2,713




3,791


Equipment



1,764




2,152




2,713




3,791


Other sustaining capital 2



101




123




209




237


Total sustaining capital 1



6,301




8,306




11,406




15,519


Non-sustaining capital (including capital projects) 1

















Mine-site non-sustaining



3,737




2,828




6,374




4,846


Asset retirement obligation - non-sustaining 2



768




711




1,270




904


Other non-sustaining capital 1



-




-




(2

)



-


Total non-sustaining capital 1



4,505




3,539




7,642




5,750


Total capital expenditures


$

10,806



$

11,845



$

19,048



$

21,269


1 Sustaining and non-sustaining capital are non-GAAP financial measures with no standard definition under IFRS. Refer to the non-GAAP Financial Performance Measures section of the MD&A. Capital expenditures are included in the calculation of all-in sustaining costs and all-in costs.

2 Asset retirement obligation - non-sustaining is related to expenditures with dam closing projects. Payments related to the Company asset retirement obligation are classified as operating activities in accordance with IFRS financial measures.

Reconciliation of Free Cash Flow 1

($ thousands, except where indicated)


Three months ended



Six months ended





June 30



June 30





2024



2023



2024



2023


Cash generated from operating activities


$

20,766



$

9,973



$

28,875



$

20,338


Adjustments

















Asset Retirement Obligation



768




711




1,270




904


Sustaining capital expenditures 2



(6,301

)



(8,306

)



(11,406

)



(15,519

)

Free cash flow


$

15,233



$

2,378



$

18,739



$

5,723


Ounces of gold sold



19,022




16,917




34,714




35,925


Free cash flow per ounce sold


$

801



$

141



$

540



$

159


1 This is a non-GAAP financial performance measure with no standard definition under IFRS.

2 Further detail on the sustaining capital expenditures composition can be found on the reconciliation of sustaining capital and non-sustaining capital expenditures in the non-GAAP reconciliation.

Reconciliation of Cash Operating Costs, All-In Sustaining Costs and All-In Costs per Ounce Sold 1

($ thousands, except where indicated)


Three months ended



Six months ended





June 30



June 30





2024



2023



2024



2023


Operating costs


$

19,897



$

19,462



$

38,212



$

40,074


General & administration expenses



2,097




1,988




3,896




3,689


Corporate stock-based compensation



428




377




436




795


Sustaining capital expenditures 1



6,301




8,306




11,406




15,519


All-in sustaining cash costs



28,723




30,133




53,950




60,077


Reclamation (operating sites)



125




-




145




1


All-in sustaining costs


$

28,848



$

30,133



$

54,095



$

60,078


Non-sustaining capital expenditures



4,505




3,539




7,642




5,750


Exploration and evaluation costs (greenfield)



378




944




960




1,931


Reclamation (non-operating sites)



(50

)



-




(63

)



1


Care and maintenance (non-operating sites)



150




174




340




343


All-in costs


$

33,831



$

34,790



$

62,974



$

68,103


Ounces of gold sold



19,022




16,917




34,714




35,925


Cash operating costs per ounce sold 2


$

1,046



$

1,150



$

1,101



$

1,115


All-in sustaining costs per ounce sold 2


$

1,517



$

1,781



$

1,558



$

1,672


All-in costs per ounce sold 2


$

1,779



$

2,057



$

1,814



$

1,896


Average realized gold price


$

2,354



$

1,962



$

2,228



$

1,922


Cash operating margin per ounce sold


$

1,308



$

812



$

1,127



$

807


All-in sustaining margin per ounce sold


$

837



$

181



$

670



$

250


1 Capital expenditures are included in our calculation of all-in sustaining costs and all-in costs.

2 Cash operating costs, all-in sustaining costs and all-in costs are all non-GAAP financial performance measures with no standard definition under IFRS. Result may not calculate due to rounding.

Reconciliation of Net Income to EBITDA and Adjusted EBITDA 1

($ thousands, except where indicated)


Three months ended



Six months ended





June 30



June 30





2024



2023



2024



2023


Net Income


$

13,469



$

(1,101

)


$

16,295



$

1,371


Income tax expense



3,273




1,521




4,522




3,417


Finance costs



556




757




1,301




1,651


Depreciation and amortization



7,861




6,238




15,056




12,023


EBITDA 1


$

25,159



$

7,415



$

37,174



$

18,462


Changes in other provisions and VAT taxes



309




359




817




428


Foreign exchange loss



(3,515

)



2,403




(4,726

)



3,354


Stock-based compensation



428




377




436




795


Adjusted EBITDA 1


$

22,381



$

10,554



$

33,701



$

23,039




















Weighted average outstanding shares



79,093,609




72,715,206




79,080,137




72,640,143


Adjusted EBITDA per share 1


$

0.28



$

0.15



$

0.43



$

0.32


1 This is a non-GAAP financial performance measure with no standard definition under IFRS.

Working capital 1


June 30



December 31


($ thousands)


2024



2023


Cash and cash equivalents


$

37,410



$

22,041


Other current assets:









Restricted cash



953




897


Inventory



14,550




15,639


Recoverable taxes



4,212




5,584


Other accounts receivable



337




310


Prepaid expenses and advances



1,980




1,556












Current liabilities:









Accounts payable and accrued liabilities



(15,030

)



(16,082

)

Notes payable



(3,046

)



(3,295

)

Lease liabilities



(841

)



(1,953

)

Current tax liability



(3,149

)



(1,381

)

Other taxes payable



(998

)



(1,334

)

Reclamation provisions



(3,707

)



(4,298

)

Legal and other provisions



(4,253

)



(5,068

)

Working capital 1


$

28,418



$

12,616


1 This is a non-GAAP financial performance measure with no standard definition under IFRS.

Qualified Person

Scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, who is Advisor Exploration and Geology to Jaguar Mining Inc. and is a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699-1701 of gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the third largest gold land position in the Iron Quadrangle with over 55,000 hectares.

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration potential from mineral claims. The Company's principal operating assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. The Roça Grande Mine has been on temporary care and maintenance since April 2019. Additional information is available on the Company's website at www.jaguarmining.com .

For further information please contact:

Vernon Baker
Chief Executive Officer
Jaguar Mining Inc.
vernon.baker@jaguarmining.com
416-847-1854

Alfred Colas
Chief Financial Officer
Jaguar Mining Inc.
alfred.colas@jaguarmining.com
416-847-1854

Forward-Looking Statements

Certain statements in this news release constitute "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking statements and information are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking information made in this news release is qualified by the cautionary statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information contained in forward-looking statements can be identified by the use of words such as "are expected," "is forecast," "is targeted," "approximately," "plans," "anticipates," "projects," "anticipates," "continue," "estimate," "believe" or variations of such words and phrases or statements that certain actions, events or results "may," "could," "would," "might," or "will" be taken, occur or be achieved. All statements, other than statements of historical fact, may be considered to be or include forward-looking information. This news release contains forward-looking information regarding, among other things, the anticipated impact of planned changes in mining systems and cost cutting initiatives on the Company's future performance and production results, information related to expected sales, production statistics, ore grades, tonnes milled, recovery rates, cash operating costs, definition/delineation drilling, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, currency fluctuations, capital requirements, project studies, mine life extensions, restarting suspended or disrupted operations, continuous improvement initiatives, and resolution of pending litigation. The Company has made numerous assumptions with respect to forward-looking information contained herein, including, among other things, assumptions about the estimated timeline for the development of its mineral properties; the supply and demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; political and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business and economic conditions. Forward-looking information involves a number of known and unknown risks and uncertainties, including among others: the risk of Jaguar not meeting the forecast plans regarding its operations and financial performance; uncertainties with respect to the price of gold, labour disruptions, mechanical failures, increase in costs, environmental compliance and change in environmental legislation and regulation, weather delays and increased costs or production delays due to natural disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties inherent to capital markets in general (including the sometimes volatile valuation of securities and an uncertain ability to raise new capital) and other risks inherent to the gold exploration, development and production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and described herein. In addition, there are risks and hazards associated with the business of gold exploration, development, mining and production, including environmental hazards, tailings dam failures, industrial accidents and workplace safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, procurement fraud and gold bullion thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Accordingly, readers should not place undue reliance on forward-looking information.

1 This is a Non-GAAP financial performance measure with no standard definition under IFRS. For more details, refer to the Non-GAAP Performance Measures section of the MD&A

SOURCE: Jaguar Mining, Inc.



View the original press release on accesswire.com

Tags: