Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

American Bonanza Gold Corp ABGFF



GREY:ABGFF - Post by User

Comment by behindblueeyeson Feb 07, 2012 9:24am
261 Views
Post# 19498888

RE: News Update full report

RE: News Update full report

American Bonanza Copperstone Gold Mine Update

February 7, 2012 - American Bonanza Gold Corp. (TSX: BZA)

 

("Bonanza” or "Company")

is pleased to announce that the Copperstone gold mine has achieved several significant

milestones as the operation moves towards full production. The crushing and grinding facilities

and the gold processing plant have completed commissioning and have recently operated for one

week at 79% of the 450 tons per day design capacity during the final week of January 2012.

The gold processing plant is now treating ore grade rock, having run waste and low grade rock

for several weeks as part of the startup process. Head grades during the final week of January

average 0.21 ounces per ton of gold although data is still being analyzed and this result is subject

to minor revision. The head grades are scheduled to rise during February as the processing plant

works through the low grade rock which has been stockpiled at surface for startup.

The processing plant is performing well, as indicated by the consistent and low grade tailings

assays, in the order of 0.03 ounces per ton gold during the final week of January. Low gold

grades in the tailings indicate that most of the gold being fed into the plant is being collected in

the gravity and flotation circuits where high grade concentrates are being produced. The gold

processing plant has been treating ore grade rock for a short time, and accordingly performance

estimates are very preliminary in nature. During the coming months, as more substantial tonnage

is processed, the performance results will become more reliable.

Gold reporting to the gravity circuit in the processing plant is higher than expected, and as a

result, the gravity circuit is being expanded to optimize recoveries. A Gemini gold table has

been added to the gravity circuit and a second Knelson concentrator is being added. These steps

to optimize the gravity circuit recoveries are aimed at improving overall performance of the gold

processing plant.

During the final week of January, overall gold recovery was 84%, although this result is subject

to minor revision as the data are finalized. Bonanza's objective is to maintain the low tailings

grade as the head grade increases, which would have the effect of increasing the overall gold

recovery. Additionally, optimization of the gravity circuit is aimed at improving the gold

recovery over the next several months. The gold grades of the gravity concentrates and the

flotation concentrates were in line with or exceeded target grades for the final full week of

January. As more tonnage of ore grade rock is processed, these concentrate grades and other

processing plant performance measures will become more reliably measurable.

Underground mine performance continues to increase to design levels. Ore and development

waste are being mined in approximately equal amounts. While not enough mining history has

been developed to comprehensively compare the grade of the recently mined ore with the

anticipated grades from the reserves, early indications are that ore being mined exceeds the grade

as modeled in the reserve calculations. Surface ore stockpiles are currently in excess of 4,000

tons of ore, which will allow the gold processing plant to continue increasing throughput as the

mine tonnages increase to provide feed to the processing plant.

The underground mine is nearing the completion of startup activities, with equipment,

infrastructure, and personnel resources steadily improving. During the coming months, as the

gold processing plant works through the ore already stockpiled on the surface, Bonanza's

objective is to steadily bring the underground mine output up to target levels.

The Copperstone assay lab is operational, as are the surface office facilities, communication

systems, truck wash bay, fuel depot, and other infrastructure necessary for the operation of the

mine. Plans have been formulated for resource expansion drilling, and the underground drilling

rig owned by Bonanza is being refurbished as personnel are being hired to conduct the drilling

campaign along with the assistance of Bonanza's exploration personnel. While preliminary in

nature, the current exploration plan has the goal of commencing underground resource expansion

drilling during March of 2012.

This release was reviewed by Douglas Wood, P.G., Vice President, Exploration of Bonanza, a

non-independent Qualified Person within the meaning of NI 43-101.