OTCQX:BGMZF - Post by User
Comment by
hammer161on Jun 09, 2018 6:37pm
200 Views
Post# 28150506
RE:RE:RE:Here's a Nugget
RE:RE:RE:Here's a Nugget
A 400 man camp at this stage would be a construction camp to build a new mine. They don't yet have a study to be beyond, and one that determines how much of the 1.6 Moz Au is even economic. Chances are at an average of 6.2 g/t a lot falls out dues to lower grade (3.0 - 5.0 g/t) dilution and, at greater depth, high costs to extract. They need a lot more drilling and need to do the first study. JMHO.