RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:From Joe Marshall’s comment is correct. We do see declines due to water cut increases. Once the wells get to a higher water cut they do seem to flatten out and stabilize. We believe the horizontal wells will assist with this process and still have higher oil production even with high water cuts.
The HZ wells are still on track. We hope to have the first one on production in May.
Both RCE and CN fields are very busy right now. CN-7 is in the completion phase, and the rig moves to CN-8 afterwards. We will then be converting a well on the CN pad into a water injector. At the RCE pad we are moving oil and water tanks, VSDs, flow lines, etc, in order to set up the three surface pumps for the RCE-1 conversion into a water disposal well.
Hope that helps.
Thanks
Joe