MMMW Announces a Payback of Three to Five Year Using the Pat WORCESTER, Mass., Oct. 31, 2022 (GLOBE NEWSWIRE) -- Mass Megawatts (OTC: MMMW) www.massmegawatts.com announces the ability for solar projects using the new patent pending solar tracker to pay for itself in three to five years at many locations in states like Massachusetts, New York and Connecticut. Most of the components of both the solar tracker and the non-solar tracker equipment have twenty-year manufacture guarantees from large reputable suppliers. The most expensive items like the solar panels, inverters, and tracker motors are supported by the large suppliers.
To help complete the new solar power projects, Mass Megawatts recently developed a partnership for installing and financing low-cost solar projects in 19 states. Many solar projects will be eligible for 100 percent financing. Under the new program, we can also streamline the process toward delivering custom proposals and the best plan for the customer.
In other news, Mass Megawatts recently announced the 20 percent solar power output improvement in addition to the previously announced 37% increased power output with an innovative redesign of its patent pending solar tracker to maximize the albedo or solar reflection effect of receiving electric power output from the backside of solar panels that can accept solar rays from both sides of the solar panel. The cost saving improvement is possible since the patent pending solar tracker has the competitive advantage of using a low-cost method for protection against high wind and hurricane related events. The solar panels attached to the tracker platform would force the face of the panels to turn 90 degrees from the direction of the wind. The system allows a slip feature during high wind conditions. Once the wind returns to less dangerous levels, the tracker resumes its operations. The “yaw sideways” technique avoids the need for additional material and cost needed to protect against high wind events.
https://www.globenewswire.com/news-release/2022/10/31/2544503/0/en/Mass-Megawatts-Announces-a-Payback-of-Three-to-Five-Year-Using-the-Patent-Pending-Solar-Tracker-in-Several-States.html