Phase 1 not complete after all
Phase 1 not complete after all From the MD&A released today:
"Phase I, a 217,000 sq. ft. (20,160 sq. m) expansion is expected to be fully completed in Q4 of 2018, with an anticipated design capacity of 22,245 kg of annual production. As of April 2018, we have completed 128,000 sq ft of erected shell with 60% of the floors poured. The remaining 89,000 sq ft including flowering rooms, packaging, oil extraction and laboratory area is expected to be completed by Q4 of 2018"