RE: RE: A lot of Money - JD Thanks, I see that now.Strange though, with NML presentations saying 4.0 million dmt or 4.2 million wet tonnes.
6 is a 50 % increase over that!
The presentation does say "rated capacity" though, not "planned production".
Is it possible the plant is over-designed as a precaution? Rated at 6 but happy with 2/3 of that?
Or is it erring on the side of caution regarding year round operating conditions?
BG