RE: Re: RE: Energy Costs oops!
The 2006 study was for 14.2 mtpa of con, so on a MW per million tonne of con basis the NML project is :
235/14.2 = 16.5 MW for concentrating alone (compared to 8.7 for, say, Alderon or IOC, and probably CHM too)
and
300/14.2 = 21.1 MW for concentrating and pelletizing.
BG