3 months later!Nov 10 release:
Bulk sampling has commenced in both pits with the material sampled and assayed to determine feed grades and stockpiled at the Livramento mill ready for processing. An initial test run of the mill was complete on Sunday the 8th of November using just the 2 hammer mills. The team is waiting on the arrival of 7 tonnes of steel balls so that the existing ball mill can be included in the circuit. The ball mill is expected to be in operation by the 17th of November to allow the first batch of bulk sample to be processed. A gold pour is expected in the next two weeks. A second ball mill was delivered on site on the 12th of October and will be added to the circuit in the next 2 months, which will increase the hourly milling rate to 60 tonnes.
I would hope there is another release soon to define the results of that bulk sample and confirm that the plant is producing gold.Something like 60 tonnes/hr @ 2 g/t equals thousands of grams since commissioning...
But then, maybe we were just simply scammed.
IMO C300