TSXV:AAA.P - Post by User
Post by
cory881on Oct 21, 2010 12:36pm
192 Views
Post# 17593532
JUNE 15, HOLE 1
JUNE 15, HOLE 1Drill hole DK-10-01 was drilled vertically and is located betweenParsons holes 236, 226, 159, and 232. Historic drilling in thisnorthern extension of the Musley Deposit shows isolated zones of lowgrade potash mineralization surrounded by higher grade potash zones.The potash zone intersected in DK-10-01 returned low potash values, KClvalues are less than 5% and it is interpreted that this hole alsointersected a similar isolated zone of weak potash mineralization. Sandand silt intersected immediately below the potash zone suggests alocalized influx of sediment into this part of the basin which may haveeroded, or inhibited, potash mineralization.